Group Meeting 03/02/2004. Format of Weekly Group Meeting  Daily chore  Research report: electronic presentation required  Journal report.

Slides:



Advertisements
Similar presentations
“L3” Jeff Landgraf. In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.”
Advertisements

High Level Trigger (HLT) for ALICE Bergen Frankfurt Heidelberg Oslo.
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Experimental Method Experimental Method Kihyeon Cho Kyungpook National University Spring Semester 2005 Experimental Method and Data Process.
High Level Trigger – Applications Open Charm physics Quarkonium spectroscopy Dielectrons Dimuons Jets.
HLT & Calibration.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
1 HLT – a source of calibration data One of the main tasks of HLT (especially in the first years) –Monitoring of the detector performance –Analysing calibration.
Identification of neutrino oscillations in the MINOS detector Daniel Cole
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
7/19/2004FTPC Review - J. Seyboth1 FTPC Review - Software Janet Seyboth for the FTPC group DAQ Online Calibration Databases Offline Documentation FTPC.
1 TPC online  offline calibration November 2002.
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
1 LEPS TPC Electronics 章文箴 Wen-Chen Chang Institute of Physics, Academia Sinica 03/30/2001.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
Coupling Neutron Detector array (NEDA) with AGATA The AGATA Front-End processing Electronics & DAQ The AGATA Trigger and Synchronization (GTS) Coupling.
Status of TPC experiment ---- Online & Offline M. Niiyama H. Fujimura D.S. Ahn W.C. Chang.
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
TPC online reconstruction Cluster Finder & Conformal Mapping Tracker Kalliopi Kanaki University of Bergen.
JANA and Raw Data David Lawrence, JLab Oct. 5, 2012.
W.Skulski APS April/2003 Eight-Channel Digital Pulse Processor And Universal Trigger Module. Wojtek Skulski, Frank Wolfs University of Rochester.
Hall-D/GlueX Software Status 12 GeV Software Review III February 11[?], 2015 Mark Ito.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
String-18 Development Workshop, Overview Azriel Goldschmidt AMANDA/ICECUBE Collaboration Meeting Berkeley March 2002.
Prospects in ALICE for  mesons Daniel Tapia Takaki (Birmingham, UK) for the ALICE Collaboration International Conference on STRANGENESS IN QUARK MATTER.
HLT/AliRoot integration C.Cheshkov, P.Hristov 2/06/2005 ALICE Offline Week.
12 October 2001, M. LefebvreHEC-Athena Tutorial: HEC beam test primer1 HEC Beam Test Primer Production modules of the HEC have been tested in particle.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Ciemat Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas Daniel Cano-Ott, DAQ meeting in Huelva, July 18 th and 19 th A new flash.
NEDA collaboration meeting Neutron and light charged particle detector-arrays as complementary detectors for the future European large gamma-arrays AGATA,
Christian Lippmann (ALICE TRD), DPG-Tagung Köln Position Resolution, Electron Identification and Transition Radiation Spectra with Prototypes.
Quality assurance for TPC. Quality assurance ● Process: ● Detect the problems ● Define, what is the problem ● What do we expect? ● Defined in the TDR.
HMPiD upgrade variant; simulation status N. Smirnov Physics Department, Yale University, May, 06. CERN visit.
CWG13: Ideas and discussion about the online part of the prototype P. Hristov, 11/04/2014.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 22 February 2011 Time Meeting, BNL.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
R. Michaels, JLAB PREX Mtg, July 2008 Compton DAQ (General) Remaining experts : Sirish Nanda, Alexandre Camsonne, me Recent Exercises Port to vxWorks 5.5.
Low-energy Sim/Reco Capability Xin Qian (BNL) Tingjun Yang (FNAL) 1.
Trigger system for setup 2016 V. Rogov, V. Yurevich,D.Bogoslovski, S.Sergeev, O.Batenkov* LHEP JINR *V. G. Khlopin Radium Institute, St. Petersburg.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Progress of GEM R&D in Lanzhou Univerity
TPC status report Marian Ivanov.
SPring-8 FADC Module Compiled by Wen-Chen Chang Updated: 07/12/2002.
TOF CALIBRATION DATABASE
ALICE – First paper.
Commissioning of the ALICE HLT, TPC and PHOS systems
HLT & Calibration.
Valencia TileCal Meeting - E.Valladolid
Online DAQ Code Tutorial
UNIZH and EPFL at LHCb.
CLAS12 Timing Calibration
Tracker Software Status
Commissioning of the ALICE-PHOS trigger
ورود اطلاعات بصورت غيربرخط
BES III Software: Short-term Plan ( )
Presentation transcript:

Group Meeting 03/02/2004

Format of Weekly Group Meeting  Daily chore  Research report: electronic presentation required  Journal report

Daily Chore  New people joined  Moving of lab and office space  What Glister can help

Overall Introduction of Group Activity  Detector: TPC  Trigger: NIM modules  Electronics: pre-amplifier, ADC (FADC)  Data Acquisition System: UNIDAQ  Offline Analysis: particle tracking, particle identification, decay vertex….  PHYSICS!

FADC  Development of FPGA codes for removing discrete pulse data.  Design of new generator of FADC modules with DSP, aimed at the second level-trigger and pulse shape discrimination.

UNIDAQ  DAQ system used in the real experiment.  Development UNIDAQ on the new LINUX system.  Online Monitoring system.  New DAQ codes for new FADCs.

Offline Analysis  Calibration of gain  Tracking algorithm  Particle identification using dE/dx vs. P.  Reconstruct  mesons from K+K-.  Pentaquark Event?