Earth Control Measures at Project Detail Site Location Marina Barrage.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Sandbagging Techniques
Future of the Construction and Post Construction Water Quality Program
How they work Tom Schneider, CPESC President SCIECA EPA Region 6 MS4 Conference July 7, 2011 San Antonio, Texas.
Wetland Critical Areas - Draft Ordinance Overview 18.20: Definitions Many new definitions added for clarity when used in the regulations and several unnecessary.
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
Stormwater Management
CONTRACTOR, HOW TO STAY IN COMPLIANCE: A GUIDE TO RULE 5 BMPS AND REQUIREMENTS MARYANN DUGAN, KENTON WARD, ANDREW WELLS INDIANA WATERSHED LEADERSHIP ACADEMY.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Hickory Hills Lake Management Committee Erosion Control sub committee Tom BertramJane Blake.
Post Construction Runoff Control & BMPs J. C. Hayes, Ph.D., P.E. & D. Hitchcock, Ph.D. South Carolina Stormwater Forum May 8, 2007 Columbia, SC.
Earth and Rockfill Dams
Field Application Training for Erosion and Sediment Control BMPs on Caltrans Construction Sites.
Methods Of Sediment Control Steve Pudenz AGC/NDOR Partners in Construction.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Building Green in Bowling Green
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
THE EVOLUTION OF JOBSITE SEDIMENT CONTROL TECHNOLOGY.
1 Best Management Practices -Structural Measures – Level II: Introduction to Design Education and Certification for Persons Involved in Land Disturbing.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
1 Course Highlights –Introduction –Planning for Erosion and Sediment Control –Erosion Control BMP Implementation –Sediment Control BMP Implementation –Class.
Vegetation Establishment. Exposed soil occurs on all construction sites.
Sanitary Engineering Lecture 16
CONSTRUCTING A FIVE CABIN LATRINE
John Miller.  Purpose of Erosion/ Sediment Control Codes ◦ Promote Safety ◦ Preserve Property values ◦ Lessen burden on taxpayers for flood control ◦
Erosion Control/Damage Topic H. Erosion & Sentiment Control Defined by: – Environmental Regulations – State and federal laws – Standard specifications,
Erosion Control on Construction Sites David Athey, PE Deputy Public Works Director, Engineering City of Atascadero.
Office of Sustainability Presented by Sofia Habity EROSION AND SEDIMENTATION CONTROL.
1 Class Exercise  Soil Stabilization  Sediment Controls  Verify the contractors calculations for the quantity of material need to stabilize a Disturbed.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
Module 7: Construction Phase
Module II Soil Stabilization (SS) and Sediment Control (SC) BMPs
1 Common Issues on Site Re-certification Training For Level IB Advanced Fundamentals Certified Inspector Issued May 2009.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
Employees can help reduce water pollution by preventing dirt and debris from being washed into the storm drain system during the following activities:
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
1 Best Management Practices -Structural Measures – Level IB: Advanced Fundamentals Education and Certification for Persons Involved in Land Disturbing.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
PRESENTED BY ARCHIT PATEL( ) BRIJESH PRAJAPATI( ) INTRODUCTION TO HYDROLOGIC STRUCTURES GUIDED BY Dr. K PRIYAN & PROF. SNEHAL POPLI.
MDOT Storm Water Management Plan Module 2: Best Management Practices
1 Best Management Practices -Structural Measures – Level IA: Fundamentals Education and Certification for Persons Involved in Land Disturbing Activities.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Basic Hydrology & Hydraulics: DES 601
Basic Hydraulics: Storm Water Management concepts
CAROLINE CICERCHI URBAN EROSION & STORM WATER SPECIALIST Lorain County Erosion & Sediment Control Rules.
1 Structural Control Practices ©2002 Dr. Bradley C Paul.
EROSION CONTROL BY LAND MANAGMENT WHAT IS EROSION The detachment and transportation of soil particles from one place to other by running water, wind.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
Pollution Control: For Field Office Construction Sites.
Construction Inspection for FO Activities - Geosynthetics
Preventing Storm Water Pollution: What We Can Do Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
WELCOME.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Construction Land Disturbance Pollution Control
Storm Water Pollution Prevention Plan Development
Presentation transcript:

Course Highlights Introduction Planning for Erosion and Sediment Control Erosion Control BMP Implementation Sediment Control BMP Implementation Class Exercise Field Demonstration of BMPs

SEDIMENT CONTROL BMPs SC-1 SILT FENCE SC-4 CHECK DAMS SC-5 FIBER ROLLS SC-6 GRAVEL BAG BERM SC-8 SAND BAG BARRIER SC-9 STRAW BALE BARRIER SC-10 STORM DRAIN INLET PROTECTION

SEDIMENT CONTROLS Intercept sediment laden runoff, slow the flow, and allow the suspended sediment particles to drop out of suspension.

SEDIMENT CONTROL BMPs SC-1 Silt Fence Permeable fabric designed to intercept and slow flow of sediment-laden sheet flow runoff

SC-1 SILT FENCE Material Requirements Silt fence shall be woven polypropylene fabric Minimum width of 900 mm (36 inches) The fabric shall conform to the requirements in ASTM designation D4632 and have an integral reinforcement layer The permittivity of the fabric shall be between 0.1 sec -1 and 0.15 -1 in conformance with ASTM designation D4491 ASTN is the American Society for Testing and Materials

SC-1 SILT FENCE Stakes Requirements Wood stakes shall be commercial quality lumber Stake dimensions: 50 x 50 mm by 1200 mm in length Stakes shall be free from decay, splits or cracks longer than the thickness of the stakes Bar reinforcement may be used, and its size shall equal to or greater than (4) and end protection is required 2.5 m maximum stake spacing

SC-1 SILT FENCE Design and layout Maximum length of slope draining to any point shall be 61 m (200 ft) Slope of area draining to the silt fence shall be less than 1:1 VH For slopes steeper than 1:2 that contain large numbers of rocks or dirt clods that tend to dislodge additional protection may be necessary

SC-1 SILT FENCE Installation Requirements “Key-in” bottom of silt fence a minimum of 150 mm (12 inches) Reach of silt fence shall not be longer than 150 m (490 ft) Construct each reach so that the base elevation does not exceed 1/3 the height of the barrier Construct silt fence with a set-back of a least 1 m (3 ft) from the toe of the slope

SC-1 SILT FENCE 2000 to 2003 Manual Changes: Added limitations for: Not implementing on slope subject to creeping, slumping and landslides Not implementing in areas of concentrated flow Do not use silt fences for diverting flow Added specification for silt fence to meet Standard Specification Section 6-1.07 Added specification to key silt fence a minimum of 300 mm

SEDIMENT CONTROL BMPs SC-4 Check Dams Are small devices constructed of rock, gravel bags, sand bags, fiber roll, of other proprietary devices placed across natural or man-made channels or ditches

SC-4 CHECK DAMS Material (bags) Requirements Bags shall be either polypropylene, polyethylene, or polyamide woven fabric Minimum unit weight of 135 g/m2 (four ounces per square yard) Burst strength exceeding 2,070 kPa (300 psi) in conformance with ASTM designation D3786 Ultraviolet stability exceeding 70% in conformance with ASTM designation D4355

SC-4 CHECK DAMS Bag size Requirements : Fill material: Each gravel-filled bag shall have a length of 450 mm (18 inches), width of 300 mm (12 inches), thickness of 75 mm (3 inches), and mass of approximately 15 kg (33 lbs) Alternate bags sizes need approval by the Resident Engineer Fill material: Fill material shall be between 10 mm and 20 mm (0.4 and 0.8 inches) in diameter Be free from clay balls, organic matter and other deleterious material Filled bag shall be between 13 kg and 22 kg (28 and 48 lbs) in mass

SC-4 CHECK DAMS Installation Requirements Limit area draining to check dams to 4 ha (10 ac) or less Install along a level contour Tightly abut bag and stack in a pyramid fashion Place at a distance and height to allow small pools to form behind them Install the first check dam 5 m (16 ft) from the outfall Space bags based on slope gradient and soil type Gravel bags shall not be stacked higher than 1 m (3.2 ft)

SC-4 CHECK DAMS 2000 to 2003 Manual Changes: Gravel bags, fiber roll and other proprietary products add as construction material Fiber rolls need RE or NPDES Coordinators approval Gravel bags may be used with new specifications Gravel diameter between 10-20 mm Bag size and material added Installation specification for stacking

SEDIMENT CONTROL BMPs SC-Fiber Rolls Consist of wood excelsior, rice or wheat straw, or coconut fibers that are rolled and bound into a tight tubular roll and placed on slopes to intercept runoff

SC-5 FIBER ROLLS Material Requirements: Fiber roll shall be either (1) prefabricated rolls or (2) rolled tubes of erosion control blankets For filled rolled fiber rolls; roll into a minimum of 200 mm (8 in) diameter, and bond every 1.2 m (4 ft) along the length of the roll

SC-5 FIBER ROLLS Installation Requirements: For breaking-up slope length fiber roll spacing is based on slope inclination 1:4 or flatter – spacing shall be placed 6.0 m apart 1:4 to 1:2 – spacing shall be 4.5 m apart 1:2 or greater – spacing shall be 3.0 m apart Place fiber rolls into a 50 to 100 mm trench Stake or tie fiber rolls into place Tied fiber rolls staking is spaced at 600 mm (2 ft) apart Stake spacing at 1.2 m (4 ft) apart

SC-5 FIBER ROLLS 2000 to 2003 Manual Changes: Fiber roll materials change Specifications that rolls be placed at grade breaks, toe and face of slopes Specifies that they can be used for drain inlet protection Specifies that they can be used as check dams Larger size may be needed at toes of slopes Restricts use on slopes subject to creep, slumping or landslides Spacing intervals on slopes reduced Overlapping of ends and new detail Maintenance features added with sediment build-up removal

SEDIMENT CONTROL BMPs SC-6 Gravel Bag Berms Are woven fabric type of bags placed across slopes to intercept runoff, reduce its flow velocity, and release it as sheet flow

SS-6 GRAVEL BAG BERMS Material (bags) Requirements Bags shall be either polypropylene, polyethylene, or polyamide woven fabric Minimum unit weight of 135 g/m2 (four ounces per square yard) Burst strength exceeding 2,070 kPa (300 psi) in conformance with ASTM designation D3786 Ultraviolet stability exceeding 70% in conformance with ASTM designation D4355

SS-6 GRAVEL BAG BERMS Bag size Requirements : Fill material: Each gravel-filled bag shall have a length of 450 mm (18 inches), width of 300 mm (12 inches), thickness of 75 mm (3 inches), and mass of approximately 15 kg (33 lbs) Alternate bags sizes need approval by the Resident Engineer Fill material: Fill material shall be between 10 mm and 20 mm (0.4 and 0.8 inches) in diameter Be free from clay balls, organic matter and other deleterious material Filled bag shall be between 13 kg and 22 kg (28 and 48 lbs) in mass

SS-6 GRAVEL BAG BERMS Installation requirements: Install along a level contour Turn ends of bags up slope to prevent flow around ends Use in conjunction with temporary soil stabilization Construct barriers with a set-back of a least 1 m from toe of slope For concentrated flows: stack bags using a pyramid approach, overlap upper joints from lower rows

SS-6 GRAVEL BAG BERMS 2000 to 2003 Manual Changes: Added language for application where flows are moderately concentrated Revised specifications for fill materials Burlap bags are no longer allowed Added application and installation for linear sediment control, on slopes, toe of slopes, stockpiles, concentrated flows and perimeter barriers Add Certification of Compliance per Standard Specs 6-1.07

SEDIMENT CONTROL BMPs SC-8 Sandbag Barrier Are a woven fabric type of bag designed to intercept and slow flow of sediment-laden sheet flow runoff

SC-8 SANDBAG BARRIER Material (bags) Requirements Bags shall be either polypropylene, polyethylene, or polyamide woven fabric Minimum unit weight of 135 g/m2 (four ounces per square yard) Burst strength exceeding 2,070 kPa (300 psi) in conformance with ASTM designation D3786 Ultraviolet stability exceeding 70% in conformance with ASTM designation D4355

SC-8 SANDBAG BARRIER Bag size Requirements : Fill material: Each gravel-filled bag shall have a length of 450 mm (18 inches), width of 300 mm (12 inches), thickness of 75 mm (3 inches), and mass of approximately 15 kg (33 lbs) Alternate bags sizes need approval by the Resident Engineer Fill material: All sandbag fill material shall be non-cohesive, Class 1 or Class2 permeable material free from clay and deleterious material Conform to section 68-1.025 of the Standard Specifications Fill Material is subject to approval of the RE

SC-8 SANDBAG BARRIER Installation requirements: Install along a level contour Turn ends of bags up slope to prevent flow around ends Use in conjunction with temporary soil stabilization Construct barriers with a set-back of a least 1 m from toe of slope

SC-8 SANDBAG BARRIER 2000 to 2003 Manual Changes: Burlap bags are no longer allowed Category changed from “linear sediment removal” to “Linear sediment control”

SEDIMENT CONTROL BMPs SC-9 Straw Bale Barrier Are temporary linear sediment barriers consisting of straw bales, designed to intercept and slow sediment-laden sheet flow runoff

SC-9 STRAW BALE BARRIER Material (bales) Requirements Material shall conform to the provisions in Standard Specifications Section 20-2.06 “straw” Straw shall be derived from wheat, rice, or barley The contractor shall furnish evidence that clearance has been obtained from the County Agriculture Commissioner, as required by law, if straw is obtained from outside the country

SC-9 STRAW BALE BARRIER Straw Bale size Requirements: Each bale shall be a minimum of 360 mm (14 in) wide, 450 mm (18 in) in height, 900 mm (36 in) in length and shall have a minimum mass of 23 kg (51 lbs) Bales shall be composed entirely of vegetative matter, except binding material

SC-9 STRAW BALE BARRIER Stakes Wood stakes shall be commercial quality lumber Stake dimensions: 50 x 50 mm by 1200 mm in length Stakes shall be free from decay, splits or cracks longer than the thickness of the stakes Bar reinforcement may be used, and its size shall equal to or greater than (4) and end protection is required 2.5 m maximum stake spacing

SC-9 STRAW BALE BARRIER Installation Requirements: Limit upstream drainage area to 0.3 ha/100 m Limit length of slope draining to barrier to 30 m (100 ft) Slopes of 2:100 V:H or flatter are preferred If slope exceeds 1:10 V:H slope length must be less than 15 m (50 ft) Install along level contours Bales must be trenched in and tightly abutted together Construct barriers with a set-back of a least 1 m from toe of slope

SC-9 STRAW BALE BARRIER 2000 to 2003 Manual Changes: Added limitations verbiage that bales can invite undesirable non-native plants and be an attractive animal food source Added option to allow use of #4 steel bars as stakes

SEDIMENT CONTROL BMPs SC-10 Storm Drain Inlet Protection Device used at storm drain inlets to detain of filter sediment-laden runoff

SC-10 INLET PROTECTION DI Protection Types Filter fabric fence Excavated drop inlet sediment trap Gravel bag Foam barrier and fiber rolls

SC-10 INLET PROTECTION General requirements: Requires adequate area for ponding without encroaching upon the traveled way Frequent maintenance is required Draining areas greater than 0.4 ha (1 ac) shall be routed to a sediment trapping device May require other methods of temporary protection to prevent sediment-laden storm water and non-storm water flow from entering inlets If high flows are expected use other sediment trapping devices in conjunction with inlet protection

SC-10 INLET PROTECTION Type -1 Filter Fabric Fence Appropriate in open areas subject to sheet flows Flows should not exceed 0.014 m3s (0.5 cfs) Do not place fabric underneath grate inlet

SC-10 INLET PROTECTION Type-2 Excavated Drop Inlet Sediment Trap Appropriate where relatively high heavy flows are expected and over flow capacity is needed Size excavated trap to provide a minimum storage capacity of 130 m3 per ha of drainage area

SC-10 INLET PROTECTION Type-3 Gravel Bag Appropriate where flows exceed 0.014 m3/s (0.5 cfs) and it is necessary to allow overtopping to prevent flooding Flows shall not overtop curb Construct in accordance with BMP SC-6 In areas with high silts and clayey soils use additional media for protection

SC-10 INLET PROTECTION Type-4 Foam Barriers and Fiber Rolls Not appropriate for locations where they can not be properly anchored Intended for use in areas around inlets are unpaved Requires RE or DSWC approval

SC-10 INLET PROTECTION 2000 to 2003 Manual Changes: Sandbags are no longer allowed (gravel bags) Added option of using foam barriers of fiber rolls if they can be properly anchored (RE/DCSWC approval) Type 1 - use of filter fabric fence added to spec when grade is established and erosion control seeding is installed or pending Type 2 – excavated drop inlet specified in areas of exposed soils Type 3 – gravel bag barriers are specified in areas of paved surfaces Added specification on removing built-up sediment from foam barriers and silt fences