THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”

Slides:



Advertisements
Similar presentations
STRATEGIC FACILITIES MASTER PLAN for Village of Holmen, WI BRIEF OVERVIEW.
Advertisements

City Council Presentation July 1, 2014 Parks & Recreation Master Plan.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
  October 11, 2000 Former Plymouth County Hospital Site Public Workshop #2 
THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
Parish History Master Plan Phase 1 Costs Next Steps Parish Survey Questions + Answers The Master Plan Process 3/11Finance Council funded Master Plan Study.
A New Aquatic Facility for McCormick Park Recreation and wellness for all. An important public investment.
Facility Needs Assessment and Conceptual Design Pleasant Grove Civic Center.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
Riverview Community Wellness Place A place to grow wellness in Riverview!
The Catholic Community of St. Thomas More New Building Committee.
Connecticut Department of Energy and Environmental Protection.
WELCOME! We will begin our webinar at the top of the hour As you log on, do not be surprised if you don’t hear anyone else; participants are placed on.
WellSpring Resources.  40+ year old, growing behavioral health organization  Located in 50 year old church  Huge demand for services; vision of a new.
July 9, 2015 Georgia Department of Behavioral Health & Developmental Disabilities Residential and Respite Cost Study Overview of Proposed Rate Models.
Convention Center Community Coalition 1. Time Line 2008: Feasibility Study by CS&L May 2009: Follow-Up Data April 2010: Appleton Council/Mayor Appoint.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
TML: 2012 and Beyond thomasmemoriallibrary.org. TML: 2012 and Beyond thomasmemoriallibrary.org Thomas Memorial Library Library Improvement Program An.
Do it pro bono. Key Messages & Brand Strategy Service Grant.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Long Range Facility Planning assisted by Silver Falls School District.
Cargill Associates Architects in Philanthropy. 1. Narrow focus on immediate needs 2. Unengaged constituency 3. Weak Case for Support 4. Untested goals.
TOWN OF WALPOLE FACILITIES PLAN UPDATE SPRING ANNUAL TOWN MEETING MAY 7, 2014.
Department of Public Works Proposal for Archery in the Lower Arroyo & Deal Points for New Agreement with PRA City Council February 2, 2015.
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
Facilities Condition Audit Summary of Findings Entech is a full-service Architectural/Engineering firm providing design, construction management, facilities.
PISD High Schools: A Vision and Plan for the Future March 22, 2012 Board Presentation.
Who are we? And what is it that we do? LCC--Business Department Advisory Committee.
Noe Valley Town Square Proposed New Park Property Acquisition Presentation to the Recreation and Park Commission April 18, 2013.
Baccalaureate Enrollment Growth and Capacity CC Baccalaureate Association March 2005 Elise Erickson, Bellevue Community College Jean Floten, Bellevue Community.
Fairbank, Maslin, Maullin & Associates Opinion Research & Public Policy Analysis Santa Monica, CA – Oakland, CA – Madison, WI - Mexico City City of Palo.
TAKING ACTION TO MANAGE ENERGY TAME Buildings Initiative.
1 California Public Health Preparedness: Lessons from Seven Jurisdictions R. Burciaga Valdez, PhD June 8, 2004.
Kingsclear Consolidated School Parent / Community Meeting November 29, 2010.
ACPS & City of Alexandria 1.  Long Range Educational Facilities Plan to improve facilities planning, accommodate the growing student population, and.
ASA Board Membership Board Members: (vote) Four Paraguayan Citizens Four U.S. Citizens One Third-country National Ex-Officio Members: (voice but no vote)
NATIONAL INSTITUTES OF HEALTH CHALLENGE GRANT APPLICATIONS Dan Hoyt Survey, Statistics, and Psychometrics(SSP) Core Facility March 11, 2009.
CONSULTATION IS THE KEY: THE GEORGETOWN BRANCH PROJECT Jane Diamanti, Director of Library Services Halton Hills Public Library.
Ridgefield School District Capital Facilities Plan March 9, 2010.
DRAFT Inman Middle School Community Conversation February 19, 2015.
Welcome!. Strategic Development and Facility Master Planning Board Approved in October 2010 Hot Springs County Memorial Hospital.
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
AQUATICS FACILITY Conceptual Proposal March 1, 2007 Hilton Head Aquatics with Island Recreation Center.
School/City/Community Work Plan Year 1 Progress Report.
Municipal Center Needs Analysis City of New Carrollton 100% Final Report MCA # /13/2015 Introduction Needs Analysis Existing Facility Analysis Process.
Thomasmemoriallibrary.org THOMAS MEMORIAL LIBRARY Learn about the results of our library study And the decisions our community is facing concerning our.
Tilton Library Board of Trustees Town of Deerfield Library Improvement Project Community Meeting February 2016.
Szilárd Árvay Ministry of Foreign Affairs of Hungary.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Alice Baker Memorial Library Report to Town and Village Board March 2, 2016.
Weston Town Center Planning Committee Request for Funds for Concept & Feasibility Study.
Building Team Formation: Background Information St. Andrew Presbyterian Church March 27,
Library Renovation Projects Capital Improvement Plan 2009 – 2014.
Chapter 5 Planning. Importance of Planning It could be said that nothing is more important in the development of a recreation facility than the planning.
Community Space Needs Presentation to the State of the Town Meeting Saturday, November 9, 2013.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
Planning & Community Development Department General Plan Implementation Strategy City Council February 29, 2016.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
Campaign Story Periods of input and analysis Periods of action Periods of commitment Project Commitment Listening Phase Preparing Phase Financial Commitment.
Government Center Study Update City of Creve Coeur December 8, 2014.
COMPREHENSIVE PLAN UPDATE MEETING 6 – COMMUNITY FACILITIES ELEMENT 3/13/2014.
High School study space committee report
Community Center Study
RECOGNIZING educator EXCELLENCE
Preparing for a Capital Campaign
Police Services Analysis – Community Meeting 2
Article 41 Wastewater Planning Capacity Study
Great Lakes Wind Collaborative: Who We Are and What We Do
Demmer Library Mission Statement
Presentation transcript:

THOMAS MEMORIAL LIBRARY A NEW VISION FOR THE “LIGHTHOUSE OF KNOWLEDGE”

Review key findings of TML Study Committee Report Discuss appropriate next steps Address Council questions and concerns PRESENTATION OBJECTIVES

- Library constructed in latest additions date to 1950s and 1985 EXISTING TML COMPLEX

ASSESSMENT RFP called for an ASSESSMENT OF THE EXISTING LIBRARY Multiple assessments were conducted: Functional Architectural Engineering Peer Comparisons Public Input

c.f. “Needs Assessment & Library Improvement Program Findings” ASSESSMENT MORE THAN 100 DEFICIENCIES WERE IDENTIFIED Some of the shortcomings are serious: Exceeding Floor-Loading Capacity Potential Mold/Air Quality Problems ADA/Accessibility Problems Inefficient/Obsolete HVAC Systems Highly Inefficient Layout for Staff

ASSESSMENT PEER ASSESSMENT The existing facility severely limits the ability of the Library to serve the public with high-quality 21 st century services.

ASSESSMENT PUBLIC INPUT Input from over 1,000 residents: Focus Groups Interviews Surveys Design Charrette

ASSESSMENT PUBLIC INPUT Feedback suggests the Library should: Be fully accessible to all Be energy efficient Use staff resources wisely Serve as a center of community life Offer exceptional services to all Be located in the town center

ASSESSMENT FINDINGS 22,500 GSF +/- are needed to meet the long-term (20 – 30 year) needs of the Cape Elizabeth Library and of the Cape Elizabeth Historical Preservation Society. Constructing a facility of this size on the existing site (including necessary parking) would be challenging, but possible.

OPTIONS Four Options Were Considered Do Nothing Reprogram Existing Space Addition to Existing Structure(s) New Facility (Clean Slate)

OPTION: DO NOTHING Doing Nothing is not an option Deficiencies are serious & wasteful Current structure not up to code Total costs (construction & maintenance) will likely increase Demand for services outstrips building capacity

Estimated Cost over $1M with little or no gain in functionality Building size still limits public demand for services OPTION: REPROGRAMMING

OPTION: ADDITION No fewer than seven scenarios were formulated and critiqued by the Study Committee. Estimated cost $5 - $7.5 Million Still end up with accessibility issues Creates other problems e.g. parking Lot can’t accommodate full 22K sqft

OPTION: CLEAN SLATE Attributes of Clean Slate Site allows for design creativity Flexibility to repurpose space One level eliminates elevators/stairs Better sightlines & supervision Lowers operating costs over time Costs comparable to “addition” approach: $5.1 - $7.8 M

RECOMMENDATION The pros and cons of all approaches were considered at great length, and the Library Study Committee voted to recommend the Clean Slate approach.

DESIGN CONCEPT: PRELIMINARY The consultants and architects were directed to develop a conceptual plan and drawings based on the Clean Slate approach retaining historical elements of the old Spurwink School, and design elements of the old Pond Cove School.

Conceptual Exterior View

Conceptual View – Adult Area

Conceptual View–Children’s Area

FUNDING CONSIDERATIONS Funding Considerations Library is a municipal service Mix of both public & private funds Determine the requirements of each Private funding target unknowable without fundraising “capacity” study Need several large leadership gifts New library will have several exciting “naming” opportunities

NEXT STEPS Final Report Recommendations Development of an initial design and elevation drawings Create tools for discussions with community & potential donors Conduct a fundraising “capacity” study

SUMMARY Final Report is the culmination of 20-months of work by the Thomas Memorial Library Study Committee... But the beginning of the dialogue for a 21 st century library for the citizens of Cape Elizabeth.

TML TRUSTEE SUGGESTIONS TML Trustee Request that the Town Council grant authority to: Proceed with a Public Education and Awareness Program Request from Casaccio Architects components/costs of a next level design Explore a fundraising study & potential for success

QUESTIONS?