Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,

Slides:



Advertisements
Similar presentations
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Advertisements

NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
Capacity, Level of Service, Intersection Design (1)
Determining the Free-Flow Speeds in a Regional Travel Demand Model based on the Highway Capacity Manual Chao Wang Joseph Huegy Institute for Transportation.
Chapter 14: Basic Freeway Segments and Multilane Highways
Chapter 15: Weaving, Merging, and Diverging Movements on Freeways and Multilane Highways Chapter objectives: By the end of this chapter the student will.
INTRODUCTION TO TRANSPORT Lecture 7 Introduction to Transport Lecture 7: Signal Coordination.
CE 2710: Transportation Engineering Traffic Signals April 3, 2009 Nicholas Lownes, Ph.D.
ARC’s Strategic Thoroughfare Plan Bridging the Gap from Travel Demand Model to Micro-Simulation GPA Conference Fall 2012 Presented By: David Pickworth,
Continuous Flow Intersection March, Why are we here? Discuss Continuous Flow Intersection compared to Standard Intersection Update permit status.
Transportation Engineering
INTRODUCTION TO TRANSPORT Lecture 3 Introduction to Transport Lecture 4: Traffic Signal.
City of Little Rock Public Works – Traffic Engineering Division City of Little Rock City of Little Rock Dallas Phasing Implementation Rodney Parham Road.
Geometry information from Liufang Ave. North in Beijing Green phase (s): 99,77,66,75,60 Dwell time distribution: N (30,9), N (27,7), N (24,6) Maximal bandwidth:
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Chapter 2 (supplement): Capacity and Level-of-Service Analysis for Freeways and Multilane Highways Objectives of this presentation: By the end of this.
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
1Chapter 9-4e Chapter 9. Volume Studies & Characteristics Understand that measured volumes may not be true demands if not careful in data collection and.
Lecture #12 Arterial Design and LOS Analysis. Objectives  Understand the factors in arterial design Understand how arterial LOS is determined.
CTC-340 Signals - Basics. Terms & Definitions (review) Cycle - Cycle Length - Interval -. change interval - clearance interval- change + clearance = Yi.
Lecture #6 Chapter 16: Principles of Intersection Signalization.
Lec 15, Ch.8, pp : Signal Timing (Objective)
Chapter 241 Chapter 25: Analysis of Arterial Performance Know how arterial LOS is defined Be able to determine arterial classes Know how to determine arterial.
Traffic Signal Warrants
Highway Capacity Software (HCS) – Part II
Highway Capacity Software Based on the Highway Capacity Manual (HCM) Special Report 209 Transportation Research Board (TRB), National Research Council.
Lec 5: Capacity and LOS (Ch. 2, p.74-88)
Lec 20, Ch.18, pp : Analysis of signalized intersections, HCM (Objectives) Understand the conceptual framework for the HCM 2000 method Understand.
Chapter 17: Basic principles of intersection signalization (objectives) Chapter objectives: By the end of this chapter the student will be able to: Explain.
CEE – Spring 2005 Lectures 10 to 11 (Chapters 21, 22) Analysis of Signalized Intersections.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
Lec 17, Ch.9, pp : Capacity of freeway sections (objectives) Understand capacity and level of service are the heart of transportation analyses Understand.
Alternative Solution ONE Changes Phases from 4 to 6 based on the traffic demand of different movements; Optimizes Timing accordingly to minimize the overall.
Chapter 1: Highway Functions
Hcm 2010: work zones.
Evaluation of Alternative Methods for Identifying High Collision Concentration Locations Raghavan Srinivasan 1 Craig Lyon 2 Bhagwant Persaud 2 Carol Martell.
Case Study 1 Styner/Lauder Intersection Moscow, Idaho.
RPS Modeling Results Presentation to RPS Policy Committee Brian Gregor Transportation Planning Analysis Unit June 6,
2010 Fall Transportation Conference A Guideline for Choosing Cycle Length to Maximize Two-Way Progression in Downtown Area Saeedeh Farivar Zong Tian University.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
Introduction to Transport
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
Chapter 13: Weaving, Merging, and Diverging Movements on Freeways and Multilane Highways Chapter objectives: By the end of these chapters the student will.
Traffic Signal Timing Design Part I. Slide 2 Steps in Designing a Traffic Signal Timing Plan (1/2) 1. Determine lane configurations and lane volumes 2.
Traffic Signal Timing Design Part II. Slide 2 What to do?  Distribute volume among lanes to Identify lane utilization Determine need for lane adjustment.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
Problem 1: Determination of Facility Types for Analysis.
Problem 4: Okeechobee Road Stopped Control Analysis.
Problem 4: Clifton Country Rd/Route 146 Intersection Base Case Phasing and Volumes Analysis Plans Description of Analyses Overarching Issues 4a: AM peak.
MIDCAP Maryland Intersection and Interchange Design & Capacity Analysis Program.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
Case Study 1 Problem 3 Styner/Lauder Intersection Moscow, Idaho.
Chapter 9 Capacity and Level of Service for Highway Segments
Problem 6: Route 146 Arterial Study We’re going to look at 7 intersections simultaneously: the Shenendehowa Campus entrance, Moe Road, Maxwell Drive, Clifton.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
The New 2010 Highway Capacity Manual An Overview.
ATDM Analytical Methods for Urban Streets Urban Streets Subcommittee Meeting January 10, 2016 David Hale.
Case Study 4 New York State Alternate Route 7 Problem 4
Evaluation and Re-Design Haifa and Yafa Streets.
Traffic System Management for “Tulkarem”
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
2a. Fully actuated signal - Improved T intersection
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
Tasnim Rabee’ Nagham Dmaidi
Problem 2: Moe Rd/Route 146 Intersection
Problem 5: Interstate 87 Interchange
Problem 3: Shenendehowa Campus
Case Study 1 Problem 4 Styner/Lauder Intersection Moscow, Idaho
Problem 5: Network Simulation
Presentation transcript:

Case Study 2 New York State Route 146 Corridor

This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park, New York Problems focus on the chapters of the HCM dealing with: interrupted flow facilities (especially signalized intersections) arterials freeway interchanges arterial weaving

Analyze the operation of signalized & unsignalized intersections, and urban arterials using the HCM. Understand what input data are required and the assumptions that are commonly made regarding default values for the HCM procedures for these facilities. Know the appropriate kinds of analysis that should be undertaken for existing facilities, including the scope of the analysis. Understand the limitations of the HCM procedures and when it is appropriate to use other models or computational tools. Know how to reasonably interpret the results from an HCM analysis and how these results can be used to support a particular decision regarding a change to a transportation system. After Working Through this Case Study You Should be able to:

The table shows ways to classify traffic analysis problems that are appropriate for analysis with the HCM, cells with blue text will be discussed in this case study

Characteristics of the Corridor Multi-lane arterial Serves trips to & from: 3 major shopping centers a local school district campus many commercial & residential areas What would be reasonable time periods to collect data? - AM / PM peaks & peak of the traffic generator - Possibly Saturday midday & the Friday peak hours (e.g. for a shopping center)

For this case study the goal is to mitigate negative impacts resulting from traffic related to the site & general background traffic growth. Related to the goals and objectives are performance measures, including: Delay Level of service (LOS) Total vehicle hours of travel Total vehicle miles Air pollution outputs Noise impacts What scenarios will we need to model to address these goals? What other potential issues may need to be addressed as part of this development?

What Analyses to Perform It is necessary to examine each intersection in each time period Also some specialized analyses (heavier- than-typical traffic conditions) You might also want to do a system-level analysis to ensure that you have accounted for all the impacts that arise

What Analyses to Perform For this TIA, how many intersection- level analyses will be involved? intersections: A through G - 3 time periods: AM peak, PM peak, Weekend peak - 4 conditions: existing, future without site, future with site, future with mitigation What other analyses might be necessary? Study the freeway interchange at 7 locations (see HCMAG), equaling 84 more analyses Instead of conducting all 168 analyses, we’re going to focus on specific problems that let us illustrate how to use the HCM

Tools to Use It is important to select analysis tools that strike a balance between the amount of effort they require & the amount of insight they provide What are some tools that should be used for this case study and why? 1 – Highway Capacity Manual: for all the intersection analyses and location-specific analyses at the freeway interchange 2 – Computerized arterial signal system optimization procedure: for arterial analysis of intersections A - D

Data What types of input data are required? Facility-related information (e.g., number of lanes, lane widths, lane configurations) Traffic-related information (e.g., vehicular & pedestrian volumes for all conditions) Operational information (e.g., signal timings)

Problem 1: Maxwell Drive/Clifton Park Blvd Intersection (existing conditions and the with-site conditions analyses) 1a: PM Existing Base Case Arrival Time Changes Sensitivity to Data Skipped Phases 1b: PM With-Site Conditions Analysis Configuration Issues HCM Planning Method Cycle Length Discussion Critical Movement Techniques Operational versus planning analyses Uncertainty

Maxwell Drive Characteristics The Maxwell Drive / Route 146 intersection is signalized and fully actuated To the east ~2,000 ft east is the intersection of Clifton Country Rd / Route 146 To the west ~4,000 ft is the intersection of Moe Rd / Route 146 To the north ~300 ft is the intersection of Park Ave / Maxwell Dr. All three of these upstream intersections are signalized and fully actuated.

Maxwell Drive Base Case Phasing 20–40 sec 8–12 sec 10–18 sec (skipped ~ ½ time) The cycle length ranges from seconds & averages 48 seconds What other data do we need for this analysis?

Maxwell Dr – Base Case Analysis Characteristics: Peak Hour: 5 – 6pm Intersecting vehicles = 2877 PHF = 0.94 for all approaches 7% trucks Arrival Types 2 for EB approach 3 for WB and SB approaches

Maxwell Dr – Base Case Analysis Base case results for signal timings that equalize the delays for the critical movements in each phase Observations? What are the movement specific delays? What are the average queue lengths for each approach?

Arrival Type Changes What are the effects of changing the arrival type? If the coordination gets worse (arrival type 1), the EB left- turn delay could increase to 27.2 sec (45% more than the base case) Observations?

Data Sensitivity If data were collected for the same time period at the same location on multiple days, what kind of variance would you expect? In this case, are there any significant differences? How can you study the impacts of potential differences? With sensitivity analyses. Observations? No, the differences are minor It could be a lot or a little.

Skipped Phases What combinations are possible with this configuration? Since the HCM doesn’t ask for dual-ring phasing how should this phenomenon be modeled (min greens, max greens, gaps, etc.) Adjust the modeled signal timings so that they reflect an average cycle given that specific phase(s) will sometimes be skipped

Skipped Phases Do skipped phases make a difference? YES!!! Why is this delay 3 times greater for Dataset 7 than the base case? The cycle length is 5 sec. longer What happens if when the other phases are adjusted to reflect the change in the phase 2 timings? The WB thru delay is less than the base case, but all of the other movements have more delay

Sub-Problem 1b: Maxwell Drive PM Peak Hour – With-Site Conditions Configuration Issues What are some reasonable configurations for the new site? What are some of the tools to develop a signal timing plan? - HCM planning method for signalized intersections - Critical lane analysis Observations?

HCM Planning Method For the HCM Planning Method what needs to be supplied? Intersecting volumes Left-turn treatment (protected, permissive, compound, etc.) Number of lanes (left, through, and right) Peak hour factor Min & max cycle lengths Coordination situation (yes or no) If parking is present What does the model determine? Lets us know if the configuration will work Reports the capacity condition (above capacity, at, nearly at, below, etc.) Presents a phasing plan

Critical Movement Technique What are the differences between scenarios? Different lane use plans produce very different cycle lengths (also very different phasing plans) Combining certain movements, like the NB & SB rights and the EB & WB lefts, can get more productivity out of the intersection and reduce the cycle length

Critical Movement Technique Do you see any weaknesses in the critical movement analysis approach? How do shared lanes complicate the situation? What about intersections where there are no left- turn lanes? Observations?

Operational vs Planning Analyses What are the differences between scenarios? We can make the signal work, in an operational analysis, for the conditions that the planning analyses suggested should work. We have also seen that the cycle lengths are sometimes different.

Uncertainty Issues For this intersection we will look at: Base Case (C-4) Double Lefts, NB & SB (C-7) Separate NB/SB phases (C-8) 30% more site-generated traffic (+30%) 30% less site generated traffic (-30%) Compare and contrast the different scenarios. Which seems to have the least delay?

Conclusions We found that the intersection’s geometry will have to change substantially. We needed a new NB approach and we’ve found it useful to reconfigure the SB approach. Our best solution uses 3 lanes SB (left, through, and right) and 3 lanes NB (left, through, and right). We’ve used the PM with-site condition to look at: Changes in LOS due to the addition of the site-related traffic The relationship between geometric improvements and LOS Differences between planning and operational analyses The role of uncertainty in affecting the results obtained Current Configuration Best Solution