Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012.

Slides:



Advertisements
Similar presentations
IDEM Drinking Water Program Water Resources Study Committee.
Advertisements

Protecting Public Water Supplies in the S. Willamette Valley GWMA A Brief Overview of Source Water Assessments and Drinking Water Protection Plans.
What Do You Know About Michigans Hidden Resource? All photos by Joan Schumaker Chadde, Western Upper Peninsula Center for Science, Mathematics and Environmental.
The Barton Springs Part of the Edwards Aquifer: Basic physical and hydrologic characteristics pertinent to permitted discharges Raymond Slade, Jr, Certified.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Why Does the Lake Community Need a Sewer Septic tanks are failing. The life expectancy of a septic tank in “ideal” conditions is 20 years. In many cases.
Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.
Water Resources Target Nitrogen loads will be achieved Flexibility for regional solutions Site constraints at Buck Island Site are adequately conditioned.
MONTERY COUNTY 2005 GENERAL PLAN UPDATE STUDY SESSION – DOMESTIC WATER May 19, 2005.
Wastewater Neighborhood Meetings Code of Conduct: Be willing - participate fully; Be Kind - treat others with dignity and respect; Be open - consider new.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
What Do You Know About Michigan’s Hidden Resource? All photos by Joan Schumaker Chadde, Western Upper Peninsula Center for Science, Mathematics and Environmental.
MONDAY MAY 7,  Pump tests – Districts G, H, and NRHS  Quantity and quality of water  All required well source permitting for up to 1 MGD from.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Distribution of Nitrate in Ground Water Under Three Unsewered Subdivisions Erin P. Eid Mike Trojan Jim Stockinger Jennifer Maloney Minnesota Pollution.
RETROFIT POLICY FOR GRANT FUNDED PROJECTS Utilities Department Orange County Board of County Commissioners September 23, 2014.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Printed by DEVELOPING A NON-PUBLIC WATER SUPPLY PROGRAM FOR THE STATE OF GEORGIA Scott A. Uhlich, MCP Georgia Department of Human.
Utility Extension Project
Factors that Influence the Occurrence of Nitrate in the Upper Willamette Valley Basic Groundwater Hydrology Understanding Nitrate and its Distribution.
SEPTIC SYSTEMS AND WELLS IN SOLANO COUNTY Solano County Environmental Health Division 601 Texas Street, Fairfield CA (707)
Onsite Systems: What They Are, How They Function, and Their Needs Larry T. West Department of Crop and Soil Sciences University of Georgia, Athens.
Smart Growth / Smart Energy Toolkit Wastewater and Higher Densities Achieving Higher Density Development In Areas Without Sewer/Water Service Smart Growth.
What Do You Know About Michigan’s Hidden Resource?
Evaluating Safe Yield for Supply Wells in an Aquifer with Fresh Water / Salt Water Interface Gregory Nelson 1, Liliana Cecan 1, Charles McLane 1, and Maura.
2008 Survey of Cape Cod Second Homeowners Overview of Findings May 19, 2009.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Chris M. Kapheim General Manager May 5, AID Groundwater Map.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
Ground Water Conditions around the Lathers Property Town of Waukesha Douglas S. Cherkauer PhD, PG, PH November 15, 2007.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
Planning for Groundwater in Lafayette County August 2, 2006.
Town of Orleans Wind Energy Project Berkshire Renewable Energy Summit June, 2005 Kevin Galligan
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
An Overview of Air, Water & Soil in Agriculture Barbara McCarthy, Ph.D. Environmental Health Department Colorado State University.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
SOURCE WATER PROTECTION IN KARST SHENANDOAH VALLEY WATER CONFERENCE OCTOBER 28, 2008 WINCHESTER,VIRGINIA.
MPCA Groundwater Roles
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Eastham Water System Water Supply Investigations Status Update Board of Selectmen September 21, 2009.
7th Avenue and Bethany Home Road Water Quality Assurance Revolving Fund Site February 19, 2013.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
NESC – RCAP Smart Water Program August 4, 2008 Review of West Virginia’s Source Water Assessment and Protection Program A State Perspective A State Perspective.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Solving Water Pollution Problems in the Wakulla Springshed The City of Tallahassee’s Efforts to Reduce Stormwater Pollution Hydrogeology Workshop May 12-13,
Webster Water System Board of Selectmen Public Hearing on Water Quality October 13, 2015 Doran Crouse, Webster Water Department Scott Charpentier, P.E.,
Jim Stockinger, Erin Eid, Jennifer Maloney and Mike Trojan
Why Should We Be Concerned About Wastewater Quality and Reuse? Fred Corson, Ph.D.
To better understand ground water, it’s important to visualize the rock layers, most of which serve as drinking water aquifers, which exist under Dodge.
Activities Review for the Water Unit Test.
TOWN OF EASTHAM ANNUAL TOWN MEETING MONDAY MAY 7,
Using Insurance to Fund Brownfield Development Technical Issues Geoff Glanders, President August Mack Environmental, Inc.
Climate Change Threat Drought 1. Potential Impacts from Drought How might our community be impacted by drought? 2.
Unity Ground Water Investigation Steve Faryan, USEPA.
What Do You Know About Michigan’s Hidden Resource?
Profile of Little Pond Sewer Service Area
Funding Lead and Copper testing in public schools
Water Reclamation Plant Feasibility Study Update May 28, 2014
Investigation of District Package Treatment Plants
Private/Domestic Wells
On-Site Wastewater Treatment Systems
City of Sunrise Wastewater Reuse Program
Indiana Finance Authority (IFA)
Presentation transcript:

Eastham Water System Water Supply Development Program Board of Selectmen Update April 9, 2012

Why water? Benefits of a water system Water quality studies documenting conditions Relationship with wastewater planning Water supply investigations Water system preliminary design Cost forecasting and allocation 2 Agenda

Drinking water wells in close proximity to septic systems Water quality is steadily declining from septic system cross-contamination Documented in several studies No official water quality monitoring, management program for private wells Why Water?

Provide clean, potable water from protected and managed sources remote from septic systems, and other activities that can impact private well water quality Strict EPA/DEP quality monitoring program Provide Town-wide Fire Protection Reduce Home-owners Insurance Costs by $400-$500/year for Average Home Why Water?

Long-term community investment in infrastructure Water System Immune to Power Outage as happened in August 2011 You’ll know what you’re drinking Regular testing under strict guidelines Annual public reporting Why Water?

Sign at Town Hall after August 2011 storm

Nitrates are a risk factor for infants, but are also an indicator Larger concern: other wastewater components Not normally tested for, are expensive, but are often present along with nitrates Why Should We Be Concerned?

Nitrate c Downgradient well Leach field Household Products Pharmaceuticals

Drinking wells intercepting plume at different distances from plume source and therefore showing different concentrations of nitrate

Projected Use of Innovative/Alternative On-site Sewage Treatment Systems in Eastham, Under Current Regulations and Policies Susan Rask Barnstable County Department of Health and Environment 2007

Bedroom density and nitrate levels “Short circuiting” is occurring due to small lot size and large number of wells and septic systems; “45% of lots exceed 4 BR’s/Acre model” High number of samples > 2mg/L validates that entire groundwater system is showing nitrogen impacts from septic systems – not likely to improve

Bedroom density and nitrate levels 70% of single family residences (7 out of 10 homes) exceed the Title 5 standard for density on nitrogen sensitive lots – Eastham 2012

9,600 private wells tested since 2003 Approximately 1,000 per year Test only for Nitrates as low-$$ indicator Data analyzed by geographic map areas Clear geographic variability North Eastham most severe South Eastham least severe Eastham BOH Well Testing Program

% of Wells > 5 ppm Nitrates Red > 30% Orange 20 – 30% Yellow 10 – 20% Green 0 – 10% Remember: Nitrates are an indicator of other septic system compounds.

Principal Conclusions “The Town needs to protect the public health by providing a reliable public water supply from a protected source.” Eastham Wastewater Mgmt Plan GHD Inc., 2009

Wastewater Mgmt Plan GHD, Inc. Nearly all properties served by a well and septic system on the same lot Private wells are becoming impacted by septic tank effluent Contamination is indicated by elevated nitrate Protect public health with a public water supply

“Wastewater treatment alone will not remediate the existing human health need of safe drinking water.” Wastewater Mgmt Plan GHD, Inc.

Wastewater Mgmt Plan GHD, Inc. Sewer Service Areas Not a Town-wide system Targeted embayments Town Cove/Nauset Estuary Rock Harbor

Wastewater Mgmt Plan GHD, Inc. Sewer Locations

Wastewater Mgmt Plan GHD, Inc. Limited WW System Cost estimate: $59 Million

Wastewater Mgmt Plan GHD, Inc. “The human health wastewater needs are very clear and are best met with the development of a public water supply system from a protected water source.”

Sampled private wells across the Cape Tested for “Emerging Contaminants” from septic systems Pharmaceuticals Cleaning Solutions Flame retardants Hormones Metals Insect Repellents Personal Care Products Possible health effects, unregulated, untested 2011 Silent Spring Institute Study “Emerging Contaminants In Cape Cod Private Drinking Water Wells – 2011”

27 different contaminants detected More nitrate = more contaminants = higher concentrations 3 pharmaceuticals at highest levels in the U.S. There are no standards for these contaminants Consider home filtration if nitrate >0.5 ppm Did not test for bacteria and viruses Silent Spring Study: Findings

Provide clean, potable water from protected and managed sources remote from septic systems Provide Town-wide Fire Protection Reduce Home-owners Insurance Costs by $400 - $500/year for Average Home Water System Immune to Power Outage as Happened in August 2011 Why Water?

FY 2010 Annual Town Meeting, Article 17 Conduct pump tests to establish the quantity and quality of water available from…Districts G, H and Nauset Regional High School and perform permitting necessary to provide up to 1 MGD from each site. Evaluate feasibility of obtaining 0.5 MGD or more water from Orleans 32 Water Supply Investigation Program GOAL

Town-wide Water System 6667 Lots Served Annual average day 1.00 MGD Summer average day 1.88 MGD Peak Day 2.65 MGD

. Supply Sources NRHS District G District H

Well Development

Approximate Salt Water Interface N NW: Sand to ~100’; silt/clay to 400’+ SW: Sand to 400’; silt and clay layers District G District H NRHS Geology: Glacial Deposits

9 Nauset Lens Groundwater Model

Groundwater Modeling of Potential Water Supply Withdrawals

Ground Water Modeling Water Supply Goal Long-term effects on aquifer conditions 100-year period modeled Use annual average demand (1.0 MGD) Represents average demand at full build-out of system

NRHS Site MGD

NRHS Survey Map

District G MGD

District H 1.30 MGD

District H Town of Eastham NPS

5/4/ McLane Environmental, LLC DRAFT VP-09 OW-1A,B,C,D TPW-1B OW-2A,B,C,D TPW-2C OW-3A,B,C, TPW-3B OW-4 A,B,C VP-01 VP-11 District H – Surveyed Site Plan

Aquitard (Silty clay and silt / Silty sand ) Aquifer (Fine to medium sand with traces of coarser sand and gravel) 49 NorthwestSoutheast A D B C Aquitard Till or weathered bedrock Gamma (cps) 8, 16, 32 Inch Normal Resistivity (ohm-m) EM Conductivity (m/Sm) Elevation (ft NAVD88) Distance (ft) McLane Environmental, LLC Water Table- May 2, 2011 District H – Site Stratigraphy

Groundwater and Vernal Pool Monitoring Monitor water levels in surface water, peat, and water table Monitor three nearest vernal pools VP-01, VP- 09 and VP-11 VP-9 and OW-4 Well Cluster

Vernal Pool VP-09

Orleans as a water supply? Eastham can be entirely self-sufficient Not enough available from Orleans to meet Eastham’s demands Far less costly for Eastham to supply its own water Interconnection for emergencies

Water System Preliminary Design.

Phase 1 Wellfields Transmission Mains Storage Tanks 1,391 Connections

Phase 1 Fire Protection 1000’ radius from mains Lower insurance rates Encompasses 75% of all lots

Fire Protection and Home Insurance Applies to all properties w/in 1000’ of system and 5 miles of fire station Wellfleet experience ISO Rating dropped from Category 9 to 4 Reduced insurance for $400,000 home by $500 - $700/year Projected insurance decrease for Eastham: $400 - $500/yr (for $400,000 home)

Phase Connections 95% fire protection

Phase Connections

Phase Connections

Phase Connections

Phase 6 Seashore Area 284 Connections

Service Connections Program

System Cost $111,000 construction cost (includes inflation through construction) Construction in six phases Starting 2015 Two years each Financing done in two-year increments

Cost Allocation Approaches Taxes Betterments Connection Fees

Betterment Program Every lot assessed based on value Start-up betterment Final betterment

Betterment Program Borrowing Period 20 yrs Interest Rate2% - 4% Betterment Payback20 yrs Pursue grants and low-interest loans (SRF, USDA) and abatements

Financing the System Low Interest Loans or Conventional Loans/ Grants Betterment

Financing $17,000 for 20 years at 2% (for average property at $400,000) Average annual betterment: $400-$600/year Homeowners insurance savings: $400 - $500/year Water fees (if connected): $200/year Abatement program

Discussion