Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.

Slides:



Advertisements
Similar presentations
Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
Advertisements

8621 Georgia Avenue Silver Spring, MD
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
MICA GATEWAY RESIDENCE BALTIMORE, MARYLAND SCOTT MOLONGOSKI SENIOR THESIS STRUCTURAL OPTION ADVISOR: PROFESSOR SUSTERSIC.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
601 New Jersey Avenue Alternative Materials Amber House Structural 601 New Jersey Avenue Washington, D.C. Alternative Construction Materials Amber L. House.
George Read Hall The University of Delaware
Reading Structural Drawings
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
BWI Hilton Hotel Thomas Sabol The Pennsylvania State University
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Nicholas Reed Structural Option Seneca Allegany Casino Hotel Addition AE Senior Thesis 2013 Courtesy of Jim Boje, PE.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
John Pillar Hampton Inn & Suites National Harbor, Md Advisor: Dr. Memari Distinguished Speaker Series, Spring 2007.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
Hunter Woron Spring 2012 Structural Professor Parfitt.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Hyatt Regency Pittsburgh International Airport Hiro McNulty Structural Option AE Senior Thesis Spring 2006.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Agricultural Hall and Annex Easting Lansing, MI
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Outline Introduction Structural Redesign Gravity System
Ryan Johnson - Structural Option
North Shore at Canton The Pennsylvania State University
Project: 250 West Street, Columbus, Ohio
Presentation transcript:

Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004

Residence Inn by Marriott Stamford, Connecticut Topics Project Background Structural Design Depth Study Breadth Study 1 : Construction Management Breadth Study 2 : Mechanical Design Questions? Final Conclusions

Residence Inn by Marriott Stamford, Connecticut Project Background Project Team Owner/Developer - F.D. Rich Company Architect – BBGM Architects and Interiors General Contractor – Haynes Construction Structural Engineer – Holbert Apple Associates, Inc. M.E.P. – Collective Design Associates, LLC Civil Engineer – Redniss & Mead, Inc.

Residence Inn by Marriott Stamford, Connecticut Building Location

Residence Inn by Marriott Stamford, Connecticut Building Site and Use Building Site Structure replaces a small one story commercial building and is built on the former site of a YMCA. Building Use The Residence Inn by Marriott is a hotel offering one and two bedroom suites complete with kitchenettes and private baths.

Residence Inn by Marriott Stamford, Connecticut Building Cost Hotel: $24,947,000 Pre-cast garage: $2,631,000 Total: $27,578,000

Residence Inn by Marriott Stamford, Connecticut Building Size - 120,000 square feet guest suites - 13 occupied floors space attached precast parking garage - 2 mechanical penthouse levels - 1 basement level with pool

Residence Inn by Marriott Stamford, Connecticut Architecture -Slender-wall cladding system -Cantilevered balconies on floors 9 through 13 -Suspended mezzanine level above ground floor -L-shaped plan design, levels on short leg end at 5 th floor.

Residence Inn by Marriott Stamford, Connecticut Architecture Typical One Bedroom Suite Floor Plans of Typical Suites to come. Typical Two Bedroom Suite

Residence Inn by Marriott Stamford, Connecticut Project Situation -Original start date: January Original completion date: June Due to budgetary concerns, project construction has been delayed 5 months to allow for the redesign of certain building components in order to lower the overall cost of construction. -Updated start date: June Updated completion date: November 2005

Residence Inn by Marriott Stamford, Connecticut Topics Project Background Structural Design Depth Study Breadth Study 1 : Construction Management Breadth Study 2 : Mechanical Design Questions? Final Conclusions

Residence Inn by Marriott Stamford, Connecticut Structural Design Depth Study Original Design Flat plate concrete gravity system Concrete moment frame lateral system Foundation system modifications Miscellaneous structural items Design Code change Conclusions

Residence Inn by Marriott Stamford, Connecticut Original Design -Gravity System: -Steel framed superstructure -8” precast concrete hollow-core plank slab with gypcrete topping -Composite steel construction on mezzanine level

Residence Inn by Marriott Stamford, Connecticut Original Design -Gravity System: Typical Ball Framing plan And typical floor plan

Residence Inn by Marriott Stamford, Connecticut Original Design -Foundation System: Foundation system described

Residence Inn by Marriott Stamford, Connecticut Original Design -Lateral System: Foundation system described, including figures, plans, elevations.

Residence Inn by Marriott Stamford, Connecticut Original Design -Advantages and Disadvantages: Table listing advantages and disadvantages.

Residence Inn by Marriott Stamford, Connecticut Structural Design Depth Study Original Design Flat plate concrete gravity system Concrete moment frame lateral system Foundation system modifications Miscellaneous structural items Design Code change Conclusions

Residence Inn by Marriott Stamford, Connecticut Design Code Change -Original Design Code: BOCA Code for redesign: IBC Connecticut plans to adopt IBC 2003 in 2005 as the state’s governing code. -IBC 2000 used in lieu of IBC 2003 since it is currently more common.

Residence Inn by Marriott Stamford, Connecticut Effects of Code Change: Wind -BOCA 96 Basic Wind Speed: 90 mph -IBC 2000 Basic Wind Speed: 110 mph -Five second gust required by IBC Wind base shear increased by ~30% -Include Pressure and shear profiles-

Residence Inn by Marriott Stamford, Connecticut Effects of Code Change: Seismic -Include shear tables- -Describe code differences-

Residence Inn by Marriott Stamford, Connecticut Structural Design Depth Study Original Design Flat plate concrete gravity system Concrete moment frame lateral system Foundation system modifications Miscellaneous structural items Design Code change Conclusions

Residence Inn by Marriott Stamford, Connecticut Flat Plate Concrete System -Include sections, plans- -Describe design assumptions- -Describe design results-

Residence Inn by Marriott Stamford, Connecticut Flat Plate Concrete System -System cost, schedule-

Residence Inn by Marriott Stamford, Connecticut Flat Plate Concrete System -System advantages, disadvantages table-

Residence Inn by Marriott Stamford, Connecticut Structural Design Depth Study Original Design Flat plate concrete gravity system Concrete moment frame lateral system Foundation system modifications Miscellaneous structural items Design Code change Conclusions

Residence Inn by Marriott Stamford, Connecticut Concrete Moment Frames -Describe design assumptions- -Describe design results-

Residence Inn by Marriott Stamford, Connecticut Concrete Moment Frames -Table of advantages and disadvantages-

Residence Inn by Marriott Stamford, Connecticut Structural Design Depth Study Original Design Flat plate concrete gravity system Concrete moment frame lateral system Foundation system modifications Miscellaneous structural items Design Code change Conclusions

Residence Inn by Marriott Stamford, Connecticut Foundation System -Describe changes- loss of mats… etc.- -Include figure of typical spread ftg.-

Residence Inn by Marriott Stamford, Connecticut Structural Design Depth Study Original Design Flat plate concrete gravity system Concrete moment frame lateral system Foundation system modifications Miscellaneous structural items Design Code change Conclusions

Residence Inn by Marriott Stamford, Connecticut Balconies and Mezzanine -Describe design results- -Include figure/diagrams-

Residence Inn by Marriott Stamford, Connecticut Structural Design Depth Study Original Design Flat plate concrete gravity system Concrete moment frame lateral system Foundation system modifications Miscellaneous structural items Design Code change Conclusions

Residence Inn by Marriott Stamford, Connecticut Conclusions -Conclusions- -Include overall comparison chart-

Residence Inn by Marriott Stamford, Connecticut Topics Project Background Structural Design Depth Study Breadth Study 1 : Construction Management Breadth Study 2 : Mechanical Design Questions? Final Conclusions

Residence Inn by Marriott Stamford, Connecticut Benefits of Delayed Construction -Describe benefits for delaying-

Residence Inn by Marriott Stamford, Connecticut Costs of Delayed Construction -Describe costs for delaying-

Residence Inn by Marriott Stamford, Connecticut Conclusions on Decision to Delay -Conclusions/Recommendation-

Residence Inn by Marriott Stamford, Connecticut Topics Project Background Structural Design Depth Study Breadth Study 1 : Construction Management Breadth Study 2 : Mechanical Design Questions? Final Conclusions

Residence Inn by Marriott Stamford, Connecticut Original Mechanical System -Describe original system, including cost and performance-

Residence Inn by Marriott Stamford, Connecticut Redesigned Mechanical System -Describe new system, including cost and performance-

Residence Inn by Marriott Stamford, Connecticut Recommendation -Advantages and disadvantages chart- -Include recommendation-

Residence Inn by Marriott Stamford, Connecticut Topics Project Background Structural Design Depth Study Breadth Study 1 : Construction Management Breadth Study 2 : Mechanical Design Questions? Final Conclusions

Residence Inn by Marriott Stamford, Connecticut Final Conclusions -Recap recommendations/conclusions-

Residence Inn by Marriott Stamford, Connecticut Topics Project Background Structural Design Depth Study Breadth Study 1 : Construction Management Breadth Study 2 : Mechanical Design Questions? Final Conclusions

Residence Inn by Marriott Stamford, Connecticut Questions?

Residence Inn by Marriott Stamford, Connecticut Thank you to:……