Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.

Slides:



Advertisements
Similar presentations
What do you think? 1.Removal of water loving species like sycamore and willow or aquatic plants is the best way to increase stream flow. True or False.
Advertisements

NITROGEN & PHOSPHORUS REMOVAL FROM SHALLOW GROUNDWATER.
Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
DINGMANS CREEK RIGHT BANK RIPARIAN VEGETATION PLANTINGS, WITH SOME SOIL CHOKE & PLANTING OF EXISTING Rt. 209 DELAWARE WATER GAP NATIONAL RECREATION.
Tree Planting MMXI.
MONKEY RUN, ARCADE, NY. HISTORIC RAILROAD PROTECTION & DEMONSTRATION PROJECT, 41 METHODS AND TECHNIQUES IN COMBINATION.
THE BENT WILLOW POLE METHOD. BIOENGINEERING: The use of living plant materials to stabilize streambanks Most bioengineering gives Mother Nature a jump.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
SAND THE FOOT OF KANOPOLIS DAM, KANSAS Let’s build Engineered Rocked Riffle #5 the most upstream of the five riffles that will be constructed.
RIPARIAN TREE PLANTING City Stream Watch SAWMILL CREEK Phase II Rehabilitation Project.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
PLANTING ADVENTITIOUS ROOTING PLANTS BY MACHINE AND HAND (PROSPECT CLASS)
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
THE ENGINEERED FLOODPLAIN BENCH. Conceptually, for an incised system you can: raise the stream, lower the floodplain, or a little of both Lower either.
PLANTING ADVENTITIOUS ROOTING PLANTS BY MACHINE AND HAND (PROSPECT CLASS)
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
TRADITIONAL WINDROW & TRENCH-FILL REVETMENTS, & A NEW INVENTION, VEGETATED TRENCH-FILL REVETMENT {All 3 are classified as “Setback Revetments”}
THOUGHTS & PHILOSOPHY ACCORDING TO DERRICK
SITE 6 – DELAWARE RIVER RIGHT BANK BLOW-OUT UP THE HILL FROM THE DELAWARE RIVER (SWIRLING RIVER EROSION & GROUNDWATER PIPING) DELAWARE WATER GAP NATIONAL.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
New Adventures in Bioengineering, Willow Curtains & Willow Poles Note: REM put out an album a few years called “New Adventures in Hi-Fi” and I firmly believe.
ONONDAGA CREEK, NEAR SYRACUSE, NY. SITE 5-D & OTHER REACHES {Engineered Rocked Riffles (with all stones in compression), Traffic Control Stones, LPSTP,
STONES DRILLED & PINNED TO BEDROCK WITH METAL RODS (Two case studies) by Dave Derrick.
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.  Bank erosion is threatening a farm road  NRCS –Environmental Quality Incentives Program {EQIP} cost.
BASIC INSTALLERS COURSE. SHARED RESPONSIBILITY  SOIL TESTER SITE EVALUATION ○ PERCOLATION ○ OTHER  PUBLIC HEALTH ENVIRONMENTALIST PLAN REVIEW INSPECTION.
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
RANDOM BOULDER FIELDS {RBF} (For bank protection) 2 EXAMPLES
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
MISSOURI RIVER INNOVATIVE BANK STABILIZATION & AQUATIC & RIPARIAN HABITAT LEWIS & CLARK REGIONAL WATER SYSTEM, VERMILLION, SD.
SOIL-CHOKED STONE KEYS WITH VEGETATION
RACKET ELK CITY LAKE NEAR INDEPENDENCE, KANSAS PROJECT CONSTRUCTED DECEMBER 7-9, 2008.
BIG SISTER HERMAN PARK, ANGOLA, NY
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
The Ottawa Hills Dam Decommissioning Project. Constructed: August 2008.
Big Pipeline Crossing Protection Project for Williams on the Guadalupe River, South of Victoria, TX. (near the harbor) 1.3 Million Dollars Took 3 crews.
DEAD DIKES. DEAD DIKES USING DEAD POSTS IS A DAVE DERRICK DISCOVERY (DDD)
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
Little Blue River, Kansas: Over Nine Miles of River Stabilization & 166 Acres of Riparian Corridor Establishment By Phil Balch, with a little help from.
GRADE CONTROL: the VIFFLE {Combo of the cross- Vane & rocked rIFFLE}
McKinstry Creek NYS DOT Mitigation Project STREAM & RIPARIAN COORIDOR RESTORATION, WETLAND REWETTING, VERNAL POOLS, “RPM” PLANT EXPERIMENTAL TEST PLOTS,
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
BUSTING MYTHS VEGETATION TAKES A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
ONONDAGA CREEK, NEAR SYRACUSE, NY
Black Creek Streambank Stabilization Projects
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
Guadalupe Williams Pipeline Crossing, South of Victoria, TX
Presentation transcript:

Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone was removed the week before. All stone placement & planting occurred on Tuesday May 15, 2007.

Onondaga Nichol Road Bridge, LaFayette, NY – project planted THE LAYOUT & THE PLAN

Looking US Flow

Blue lines denote water’s edge at base flow Sketch from Mark Schaub bar Nichol Road Bridge

Top layer of stone will be removed from red areas. The US section of the left bank will then be sloped & all areas planted.

Removed stone will be then placed in the brown areas using the trenchfill technology to provide a “funnel” effect to prevent the stream from flanking the existing project.

100 Black Willow, 2,000 Streamco Willow, 500 Red Osier Dogwood & 100 Sycamore were planted using the Slit Trench & Slit Brush Layering bioengineering methods. 40 RPM container plants (7 species of trees & shrubs) were planted in the green oval areas. Black Willow & Sycamore Extreme Instant Shade shown by the orange lines. Note: Plantings form a grid to flow

Onondaga Nichol Road Bridge, LaFayette, NY – project planted PHASE 1: RIGHT FLOODPLAIN REVEGETATION- TWO-STAGE SLIT TRENCH & RPM ROOTED-STOCK PLANTS

Onondaga Nichol Road Bridge, LaFayette, NY – project planted PHASE 1: RIGHT FLOODPLAIN REVEGETATION- TWO-STAGE SLIT TRENCH & RPM ROOTED-STOCK PLANTS

Onondaga Nichol Road Bridge, LaFayette, NY – project planted PLANT PLANTS WITH LARGE YELLOW MACHINES

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Looking US at right bank. Pix by Derrick

TWO-STAGE SLIT TRENCH TECHNIQUE Sketches by Derrick Dig the trench down into the capillary (vadose) zone {moist area above the permanent water table} Mini-Case study: 1 of 16 Spoil

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Rubber tired backhoe digs 4-5 ft deep trench with a narrow bucket. Pix by Bill Frederick Mini-Case study: 2 of 16

TWO-STAGE SLIT TRENCH TECHNIQUE Water table Mini-Case study: 3 of 16

TWO-STAGE SLIT TRENCH TECHNIQUE Vadose zone {moist area} is shown in pink Mini-Case study: 4 of 16 Water table

TWO-STAGE SLIT TRENCH TECHNIQUE Take the last scoop of soil dug from the trench & place it back into the trench. Mini-Case study: 5 of 16

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Rubber tired backhoe digs trench (narrow bucket). Pix by Derrick Mini-Case study: 6 of 16

TWO-STAGE SLIT TRENCH TECHNIQUE Place willows & other water-loving species into loose soil at bottom of trench. They are then less likely to fall over when trench is backfilled. Mini-Case study: 7 of 16

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Many hands get things done quickly, 2,740 plants planted in about 6 hours. That’s why they call it a workshop. Pix by Derrick

TWO-STAGE SLIT TRENCH TECHNIQUE Partially backfill the trench. Mini-Case study: 9 of 16

TWO-STAGE SLIT TRENCH TECHNIQUE Plant other species that require less water than the willow. In this case Sycamore & Red Osier Dogwood Mini-Case study: 11 of 16

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Partially backfill, then plant species that require less water (Red Osier Dogwood & Sycamore). Pix by Derrick Mini-Case study: 10 of 16

TWO-STAGE SLIT TRENCH TECHNIQUE Completely backfill trench & water plants in Mini-Case study: 13 of 16 DONE

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Backfill using either the bulldozer…..Pix by Derrick Mini-Case study: 14 of 16

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Or the backhoe………. Pix by James Bennett Mini-Case study: 15 of 16

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Pix by Derrick ONE TRENCH DONE, MORE TO GO Mini-Case study: 16 of 16

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Digging trenches on a grid. Nice mix of Streamco Willow, Sycamore and Red Osier Dogwood in foreground. Pix by Kathy Blaisure

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Slit Trenches on the grid pattern. Pix by Derrick

Onondaga Nichol Road Bridge, LaFayette, NY – project planted LET’S SEE HOW IT GROWS

Onondaga Nichol Road Bridge, LaFayette, NY – project planted BEFORE :00am. Pix by Derrick

Black Willow, Streamco Willow, Red Osier Dogwood & Sycamore were planted using the Slit Trench bioengineering method. 40 RPM container plants (7 species of trees & shrubs) were planted in the green oval areas. Plantings form a grid to flow. No matter how water flows through the project, it encounters rows of vegetation (Living Dikes)

Onondaga Nichol Road Bridge, LaFayette, NY – project planted AFTER NOON. Pix by Derrick

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Aug 3, 2007 Less than 3 months after installation. Looking US at right bank floodplain. Pix by Mark Schaub

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Aug 3, 2007 {less than 3 months after installation}. Looking US at right bank floodplain. Pix by Mark Schaub

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Aug 3, 2007 {less than 3 months after installation}. Looking US at right bank floodplain. Pix by Mark Schaub

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Sept 10, 2007 {less than 4 months after installation}. Looking US at right bank floodplain. Pix by Mark Schaub

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Oct 16, 2007 {5 months after installation}. Looking US at right bank floodplain. Pix by Mark Schaub

Onondaga Creek-Year 2 July 10, {middle of second growing season} Looking at Slit Brush Layering (right bank). Pix by Derrick

Onondaga Creek-Year 2 July 10, {middle of second growing season} Right overbank lush growth, average height is 7 to 9 ft tall. Pix by Derrick

2 YEARS & 1 MONTH AFTER PROJECT COMPLETION Photos by Derrick JUNE 18, 2009

2 YEARS & 1 MONTH LATER-Looking the planted floodplain (Mark hidden in plants). Very lush growth, dense as desired from a hydraulic point of view. 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

2 YEARS & 1 MONTH a lush Slit Trench planting. 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

2 YEARS & 1 MONTH LATER-Close look at willow & dogwood. Lush growth, low mortality. 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

2 YEARS & 1 MONTH LATER-Beaver browsing results in multi-stem grow back characteristics. 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

2 YEARS & 1 MONTH LATER-Deer browse has not had much effect on project function either. 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

2 YEARS & 1 MONTH LATER-The US row of Slit Brush Layering with many willow in the ft range. 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

2 YEARS & 1 MONTH LATER-Mark with ft tall willow. 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

3 YEARS AFTER PROJECT COMPLETION Photos by Derrick JULY 21, YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

3 YEARS LATER-Looking robust floodplain bench growth 3 YEARS LATER-Onondaga Nichol Rd Bridge-DERRICK

3 YEARS LATER-Close-up of floodplain bench plantings 3 YEARS LATER-Onondaga Nichol Rd Bridge-DERRICK

3 YEARS LATER-Robust streamside growth!!! 3 YEARS LATER-Onondaga Nichol Rd Bridge-DERRICK

Onondaga Nichol Road Bridge, LaFayette, NY – project planted PHASE 3: TRENCHFILL REVETMENT US END OF PROJECT ON THE LEFT DESCENDING BANK

Onondaga Nichol Road Bridge, LaFayette, NY – project planted PROJECT COMPLETE. Looking DS at left side floodplain. This is what water sees. Pix by Derrick

Onondaga Creek-Year 2 July 10, {middle of second growing season} Looking at left overbank poles (Slit Trench & Trenchfill poles). Pix by Derrick

2 YEARS & 1 MONTH LATER- Looking at left overbank 8-12 ft tall poles (Slit Trench & Trenchfill poles). 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

Onondaga Nichol Road Bridge, LaFayette, NY – project planted PHASE 4: LEFT BANK REVEGETATION-SLIT BRUSH LAYERING, EXTREME INSTANT SHADE, SLIT TRENCH, & RPM ROOTED-STOCK PLANTS

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Two rows of Slit Brush Layering located along black lines. Pix by Derrick

Onondaga Nichol Road Bridge, LaFayette, NY – project planted TWO LAYERS OF “SLIT” BRUSH LAYERING

Onondaga Nichol Road Bridge, LaFayette, NY – project planted This is almost a Live Siltation retrofit. Pix by James Bennett

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Slit Brush Layering the Streamco Willow close to water surface. Pix by Kathy Blaisure

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Looking US at both layers of completed Slit Brush Layering. Pix by Bill Frederick

Onondaga Nichol Road Bridge, LaFayette, NY – project planted Looking US at both layers of Slit Brush Layering. Pix by Bill Frederick

Onondaga Creek-Year 2 July 10, Looking at Slit Brush Layering. Pix by Derrick

Onondaga Creek-Year 2 July 10, Looking at Slit Brush Layering. Pix by Derrick

2 YEARS & 1 MONTH AFTER PROJECT COMPLETION Photos by Derrick JUNE 18, 2009

2 YEARS & 1 MONTH LATER-Left bank & overbank vegetation is robust & lush & fully functioning. 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

2 YEARS & 1 MONTH left bank Slit Brush Layering. Vegetation is robust & lush & fully functioning. Red Osier Dogwood is dominating the Slit Brush Layering on the bank 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

2 YEARS & 1 MONTH LATER-Looking 2 rows of Slit Brush Layering. 2 YEARS & 1 MONTH LATER-Onondaga Nichol Rd Bridge-DERRICK

Site – soil conditions are not ideal. Fill soil is a clay fragipan, when dry is like concrete. (Extremely dry summer -2007) Slit-Trench Black Willow-low mortality & outstanding growth, many 9 to 10 ft tall. When planted most 2-3 ft tall. Slit-Trench Streamco Willow-low mortality & outstanding growth, many 9 to 14 ft tall. Slit-Trench red osier dogwood – medium mortality, very good growth Slit-Trench & Slit Brush Layering Sycamore – high mortality, few if any survived Extreme Instant Shade Sycamore – all dead. Slit Brush Layering Willow – med mortality, decent growth, not very tall. Slit Brush Layering Red Osier Dogwood – low to medium mortality- dominating with lush growth. Pole Plantings in existing stone bank – low mortality, ~6-8 ft growth. RPM rooted stock trees – outstanding shrub growth, beaver browse on several trees, mixed performance on remainder of trees, many surviving not thriving, with a couple showing fast growth, ft tall. RESULTS AFTER TWO GROWING SEASONS

CLEOPHUS SPEED ELVIS DERRICK, AT REST It’s time to relax and watch the project grow even more {The Luxury of Time}