Excavations 1926 Subpart P EXCAVATION ◦ Any man-made cut, cavity, trench, or depression in an earth surface that is formed by earth removal. ◦ Cave-ins.

Slides:



Advertisements
Similar presentations
Excavation, Trenching, and Soil Mechanics
Advertisements

Safety in Excavation.
Excavation and Trenching
UNIVERSITY of NORTHERN COLORADO Trenching and Shoring.
29 CFR and Appendices A - F Excavations 29 CFR and Appendices A - F.
Excavation, Trenching, and Soil Mechanics
TRENCH RESCUE No need to click to advance, the show will automatically advance.
Excavation & Trenching Presented by Name Title Date.
TRENCH RESCUE AWARENESS
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~Eleanor Everet.
1 Excavations Module 14. 2Objectives After this module you should be able to – identify the most common excavation hazards – take the steps necessary.
Trenching & Shoring Safety
EXCAVATION AND TRENCH PROTECTION
TRENCHING AND EXCAVATIONS
1 Excavations Best Practice Excavations. 2 Agenda - Introduction Statistics Excavations - Best Practices Question Period.
1 Risk Management Services State of Georgia Risk Management Services Trenching Safety Training Department of Administrative Services Loss Control Services.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
1 Note from eLCOSH Division of Safety, Florida Department of Labor and Employment Security FDLES/CARE These materials were produced by the Division of.
Developed under an OSHA Susan B. Harwood Grant, #46F4-HT01, by the Associated Builders and Contractors-Central Texas Chapter 1 Excavation Safety for Residential.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 9 Excavators.
OSHA Office of Training and Education1 Excavations – Subpart P.
Trenching and Excavating Safety. Asphyxiation Each time a breath is exhaled the weight of the load restricts inhalation of the next breath. Slow suffocation.
Trench Awareness Training For safety is not a gadget but a state of mind. ~ Eleanor Everet.
Trenching and Excavation Safety.  About 400 workers die in the U.S. every year and about 6500 are seriously injured in trenching and excavation related.
Risk Management Department
EXCAVATION & TRENCHING AWARENESS FOR THE CONSTRUCTION INDUSTRY
Excavations 1293 Airport Road Beaver, WV Phone: (304) Fax: (304) Vincent J. Giblin, General President.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Safety : Excavations l Introduction to Industrial Technology l Spring 2014 l Mr. Shubert 1.
Trenching and Shoring 29 CFR A Trenching Tragedy False sense of security Knew they were out of compliance Thought the soil was stable Conditions.
Susan Harwood Program Grant – The University of Texas at Arlington Thanks to the Susan Harwood Program Grant.
CORPORATE SAFETY TRAINING
S afety Excellence. Excavations Subpart P One-hour.
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
EXCAVATION. Excavation 1Excavation activity involves use of manual and mechanical means and interaction of both. Hence, safety aspect to plan involvement.
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~Eleanor Everet.
Preparing Foundations for Cylinders & ASME Tanks
Copyright © Excavations, Subpart P.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Module 13 Excavations.
Retaining Walls I. *Introduction
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
This material was produced under grant number SH F-18 from the Occupational Safety and Health Administration, U.S. Department of Labor. It.
Office of Safety & Health Consultation Office of Safety & Health Consultation presents Excavations & Trenching.
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~ Eleanor Everet.
TRENCHING & EXCAVATION
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
OSHA Office of Training and Education
Excavation & Trench Safety
COFFERDAMS.
SOIL MECHANICS AND CLASSIFICATION. FACTORS WHICH HOLD SOIL TOGETHER o Cohesion  Internal Friction.
Trenching & Excavation (Subpart P). People die in excavations! Regulations 29 CFR 1926, Subpart P People die in excavations! Regulations 29 CFR 1926,
TRENCHING AND EXCAVATION: Safety Principles
Excavations & Trenching
COMPETENT PERSON TRAINING for TRENCHING OPERATIONS
Excavation & Trenching Awareness Plus
Trenching Competent Person
1 2 EXCAVATIONS STOP WORK !!! 3 Regulations OSH Standards Rule 1410 –Construction Safety OSH Standards Rule 1413-Excavation 29 CFR 1926 Sub Part P -
Confined Spaces and Trenching A PowerPoint Presentation keyed to Chapter 6 of Materials for Teaching Agricultural Safety in the College Classroom by Carol.
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
Substructure Groundworks - Hazards
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
Objectives Upon completion of this module you should be able to:
WELCOME NEW MEXICO TECH TRENCHING AND SHORING SAFETY
OSHA Office of Training and Education
Trenching – Competent Person
Excavations Subpart P One-hour. Excavations Subpart P One-hour.
lectures Notes on: Soil Mechanics
Presentation transcript:

Excavations 1926 Subpart P EXCAVATION ◦ Any man-made cut, cavity, trench, or depression in an earth surface that is formed by earth removal. ◦ Cave-ins are much more likely to result in worker fatalities than other excavation-related accidents. TRENCH ◦ A narrow excavation (in relation to its length) made below the surface of the ground. ◦ The depth of a trench is greater than its width, and the width (measured at the bottom) is not greater than 15 ft (4.6 m).

Soil Mechanics A number of stresses and deformations can occur in an open cut or trench. For example, increases or decreases in moisture content can adversely affect the stability of a trench or excavation. The following diagrams show some of the more frequently identified causes of trench failure.

TENSION CRACKS. Tension cracks usually form at a horizontal distance of 0.5 to 0.75 times the depth of the trench, measured from the top of the vertical face of the trench. Soil Mechanics

SLIDING or sluffing may occur as a result of tension cracks, as illustrated below. Soil Mechanics

TOPPLING. In addition to sliding, tension cracks can cause toppling. Toppling occurs when the trench's vertical face shears along the tension crack line and topples into the excavation. Soil Mechanics

SUBSIDENCE AND BULGING. An unsupported excavation can create an unbalanced stress in the soil, which, in turn, causes subsidence at the surface and bulging of the vertical face of the trench. If uncorrected, this condition can cause face failure and entrapment of workers in the trench. Soil Mechanics

HEAVING OR SQUEEZING. Bottom heaving or squeezing is caused by the downward pressure created by the weight of adjoining soil. This pressure causes a bulge in the bottom of the cut, as illustrated in the drawing above. Heaving and squeezing can occur even when shoring or shielding has been properly installed. Soil Mechanics

BOILING is evidenced by an upward water flow into the bottom of the cut. A high water table is one of the causes of boiling. Boiling produces a "quick" condition in the bottom of the cut, and can occur even when shoring or trench boxes are used. Soil Mechanics

UNIT WEIGHT OF SOILS refers to the weight of one unit of a particular soil. The weight of soil varies with type and moisture content. One cubic foot of soil can weigh from 110 pounds to 140 pounds or more, and one cubic meter (35.3 cubic feet) of soil can weigh more than 3,000 pounds. Soil Mechanics

Excavations (b) ◦ Locate underground utilities and installations

Means of Access/Egress (c) ◦ Required in excavations 4 feet or deeper ◦ Provide means of egress ◦ Maximum lateral travel distance in 25 feet

Hazardous Atmospheres (g) ◦ Excavations 4 feet or deeper where hazardous atmospheres can reasonably exist ◦ Oxygen deficiency, oxygen enriched ◦ Toxic gases, flammable vapors ◦ Provide ventilation and/or PPE

Emergency Rescue Equipment Emergency rescue equipment is required when a hazardous atmosphere exists or can reasonably be expected to exist. Requirements are as follows: ◦ Respirators must be of the type suitable for the exposure. Attended (at all times) lifelines must be provided when employees enter bell-bottom pier holes, deep confined spaces, or other similar hazards. Employees who enter confined spaces must be trained.

Control of Water (h) ◦ PROTECT EMPLOYEES FROM THE ACCUMULATION OF WATER ◦ MONITOR WATER REMOVAL EQUIPMENT

Protection of Employees (a) ◦ Protect employees in the excavation from cave-ins in excavations 5 feet and deeper  Protection could be required at depths less than 5 feet if there is an indication of a potential cave-in, work activities warrant protection, etc.  Not required for excavations made entirely in stable rock

Protection Systems Sloping and benching Shielding, support, or other protective system

Stable Rock Stable rock is natural solid mineral matter that can be excavated with vertical sides and remain intact while exposed. It is usually identified by a rock name such as granite or sandstone.

TYPE A SOILS Examples of Type A cohesive soils are often: clay, silty clay, sandy clay, clay loam. Compressive forces of 1.5 tsf or greater

TYPE B SOILS Type B soils are: angular gravel; silt; silt loam; previously disturbed soils unless otherwise classified as Type C Compressive forces greater than.5 tsf but less than 1.5 tsf

TYPE C SOILS Type C soils include granular soils such as gravel, sand and loamy sand, submerged soil, soil from which water is freely seeping, and submerged rock that is not stable. Compressive forces.5 tsf or less

Soil Field Tests Thumb test Plasticity Pocket penatrometer Torvane shear Sedimentation

Thumb Penetration Test ASTM test designation D 2488 Retrieve a large clump of undisturbed spoil Attempt to penetrate the soil with the tip of the thumb Type A soil can be penetrated only with great force Type B will penetrate to the full length of the thumb nail Type C will penetrate easily several inches and can be molded by light finger pressur

Plasticity Test Roll a moist sample of spoil into a ball Roll the ball out into a 1/8" by 2 " thread If this can be done, hold it on end If it remains suspended without tearing the soil is cohesive

Pocket Penetrometer POCKET PENETROMETER. Penetrometers are direct- reading, spring-operated instruments used to determine the unconfined compressive strength of saturated cohesive soils. Once pushed into the soil, an indicator sleeve displays the reading. The instrument is calibrated in either tons per square foot (tsf) or kilograms per square centimeter (kPa). However, Penetrometers have error rates in the range of ± 20-40%.

Torvane Shear Select fresh clod or block of undisturbed soil from spoil pile Cut a smooth surface on the clod Insert vanes of device into the soil Retract vanes to show foot imprint Set indicator at zero Hold device firmly against soil and twist in clockwise manner until soil fails in shear

Consistency Term Shear Strength, psf Unconfined Compressive Strength, psf Soil Type Very Soft Soft Medium Stiff Very Stiff Hart < >4000 < >8000 TYPE “C” TYPE “B” TYPE “A”

Sedimentation Test Flat bottom container at least 7 inches high Fill glass jar 5 inches of water on top of soil 1 1/2 inches of soil Place lid on jar and shake –Set jar down –Rotate slightly –Larger particles settle out immediately –Wait 30 seconds –Mark jar –Silt after several minutes –Fine clays in an hour –Make second mark

Sloping Options NO STEEPER THAN 1 1/2 HORIZONTAL TO 1 VERTICAL (34 DEGREES) OSHA TABULATED DATA (SOIL CLASSIFICATIONS) OTHER TABULATED DATA REGISTERED PROFESSIONAL ENGINEER DESIGN

Slopes for Types of Soil Stable Rock (Vertical) 90 degrees TYPE A - (3/4 Horiz. TO 1 Deep) (53 degrees) TYPE B - (1 Horiz. TO 1 Vertical)(45 degrees) TYPE C - (1 1/2 Horiz. TO 1 Deep)(34 degrees)

Soil type Height/Depth ratio Slope angle Stable Rock Vertical 90° Type A ¾:1 53° Type B 1:1 45° Type C 1½:1 34° Type A (short-term) ½:1 63° (For a maximum excavation depth of 12 ft) SLOPING. Maximum allowable slopes for excavations less than 20 ft (6.09 m) based on soil type and angle to the horizontal are as follows:

Shoring Provision of a support system for trench faces used to prevent movement of soil, underground utilities, roadways, and foundations. Shoring or shielding is used when the location or depth of the cut makes sloping back to the maximum allowable slope impractical.

Types of Shoring There are two basic types of shoring, timber and aluminum hydraulic Shoring systems consist of posts, wales, struts, and sheeting.

Hydraulic Shoring Hydraulic shoring provides a critical safety advantage over timber shoring because workers do not have to enter the trench to install or remove hydraulic shoring.

Hydraulic Shoring Hydraulic shoring provides a critical safety advantage over timber shoring because workers do not have to enter the trench to install or remove hydraulic shoring. Other advantages of most hydraulic systems are that they: ◦ are light enough to be installed by one worker; ◦ are gauge-regulated to ensure even distribution of pressure along the trench line; ◦ can be adapted easily to various trench depths and widths.

Installing/Removing Shoring All shoring should be installed from the top down and removed from the bottom up Hydraulic shoring should be checked at least once per shift for leaking hoses and/or cylinders, broken connections, cracked nipples, bent bases, and any other damaged or defective parts

Shielding Trench boxes are different from shoring because, instead of shoring up or otherwise supporting the trench face, they are intended primarily to protect workers from cave-ins and similar incidents. The space between the trench boxes and the excavation side are backfilled to prevent lateral movement of the box.

Trench Boxes The box should extend at least 18 in above the surrounding area if there is sloping toward excavation. This can be accomplished by providing a benched area adjacent to the box. Earth excavation to a depth of 2 ft below the shield is permitted, but only if the shield is designed to resist the forces

Trench Boxes The box should extend at least 18 in above the surrounding area if there is sloping toward excavation. This can be accomplished by providing a benched area adjacent to the box. Earth excavation to a depth of 2 ft below the shield is permitted, but only if the shield is designed to resist the forces

Spoil Pile There is also a hazard from excavated material and equipment outside of the excavation falling or rolling down into the trench. Temporary spoil must be placed no closer than 2 ft from the surface edge of the excavation

Materials and Equipment Employees must also be protected from excavated materials or equipment that could pose a hazard by falling or rolling into the excavation This is achieved by placing and keeping materials and equipment at least 2 feet back from the edge of the excavation.

Competent Person Employers are required to have a competent person on site when trenching and excavation work is in progress. This person should be knowledgeable of the cave-in hazards and have sufficient authority to act when necessary. The designated competent person should have and be able to demonstrate the following: ◦ Training, experience, and knowledge of: - soil analysis, - use of protective systems ◦ Ability to detect: - conditions that could result in cave-ins, - failures in protective systems, - hazardous atmospheres, and - other hazard ◦ Authority to take prompt corrective measures

Inspections Daily inspections of the excavation, adjacent areas and protective systems should be made by a competent person. The inspections should be made at the start of the work shift and as deemed necessary throughout the shift.

Inspection Frequency The following guide specifies the frequency and conditions requiring inspections: ◦ Daily and before the start of each shift. ◦ As dictated by the work being done in the trench. ◦ After every rain storm. ◦ After other events that could increase hazards, e.g., snowstorm, windstorm, thaw, earthquake, etc. ◦ When fissures, tension cracks, sloughing, undercutting, water seepage, bulging at the bottom, or other similar conditions occur. ◦ When there is a change in the size, location, or placement of the spoil pile. ◦ When there is any indication of change or movement in adjacent structures.