1 Note from eLCOSH Division of Safety, Florida Department of Labor and Employment Security FDLES/CARE These materials were produced by the Division of.

Slides:



Advertisements
Similar presentations
Excavation, Trenching, and Soil Mechanics
Advertisements

Safety in Excavation.
Excavation and Trenching
UNIVERSITY of NORTHERN COLORADO Trenching and Shoring.
29 CFR and Appendices A - F Excavations 29 CFR and Appendices A - F.
Excavation, Trenching, and Soil Mechanics
TRENCH RESCUE No need to click to advance, the show will automatically advance.
Subpart X Ladders and Stairways 29 CFR Presented By: Joshua C. Rohrig
TRENCH RESCUE AWARENESS
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~Eleanor Everet.
1 Excavations Module 14. 2Objectives After this module you should be able to – identify the most common excavation hazards – take the steps necessary.
Trenching & Shoring Safety
EXCAVATION AND TRENCH PROTECTION
TRENCHING AND EXCAVATIONS
1 Excavations Best Practice Excavations. 2 Agenda - Introduction Statistics Excavations - Best Practices Question Period.
1 Risk Management Services State of Georgia Risk Management Services Trenching Safety Training Department of Administrative Services Loss Control Services.
Excavations 1926 Subpart P EXCAVATION ◦ Any man-made cut, cavity, trench, or depression in an earth surface that is formed by earth removal. ◦ Cave-ins.
OSHAX.org - The Unofficial Guide to the OSHA
OSHA Office of Training and Education
Developed under an OSHA Susan B. Harwood Grant, #46F4-HT01, by the Associated Builders and Contractors-Central Texas Chapter 1 Excavation Safety for Residential.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 9 Excavators.
OSHA Office of Training and Education1 Excavations – Subpart P.
Trenching and Excavating Safety. Asphyxiation Each time a breath is exhaled the weight of the load restricts inhalation of the next breath. Slow suffocation.
Excavation Review 1.  OSHA began because, until 1970, there were no national laws for safety and health hazards.  On average, 12 workers die every day.
Trench Awareness Training For safety is not a gadget but a state of mind. ~ Eleanor Everet.
Trenching and Excavation Safety.  About 400 workers die in the U.S. every year and about 6500 are seriously injured in trenching and excavation related.
Risk Management Department
Soils and Foundations.
EXCAVATION & TRENCHING AWARENESS FOR THE CONSTRUCTION INDUSTRY
Excavations 1293 Airport Road Beaver, WV Phone: (304) Fax: (304) Vincent J. Giblin, General President.
OSHA Office of Training & Education
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Safety : Excavations l Introduction to Industrial Technology l Spring 2014 l Mr. Shubert 1.
Earthwork: Use of Fine Grained & Granular Material.
Trenching and Shoring 29 CFR A Trenching Tragedy False sense of security Knew they were out of compliance Thought the soil was stable Conditions.
Susan Harwood Program Grant – The University of Texas at Arlington Thanks to the Susan Harwood Program Grant.
CORPORATE SAFETY TRAINING
S afety Excellence. Excavations Subpart P One-hour.
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
EXCAVATION. Excavation 1Excavation activity involves use of manual and mechanical means and interaction of both. Hence, safety aspect to plan involvement.
MNM Fatal Falling/Sliding Material Falling/Sliding Material December 13, 2013 (Georgia) December 13, 2013 (Georgia) Industrial Sand Mine Industrial.
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~Eleanor Everet.
Copyright © Excavations, Subpart P.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Module 13 Excavations.
Excavations & Trenching 1 OSHA 1926 Subpart P Bureau of Workers’ Comp PA Training for Health & Safety (PATHS) PPT
This material was produced under grant number SH F-18 from the Occupational Safety and Health Administration, U.S. Department of Labor. It.
Office of Safety & Health Consultation Office of Safety & Health Consultation presents Excavations & Trenching.
TRENCH OPERATIONS For safety is not a gadget but a state of mind. ~ Eleanor Everet.
TRENCHING & EXCAVATION
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
OSHA Office of Training and Education
Excavation & Trench Safety
COFFERDAMS.
SOIL MECHANICS AND CLASSIFICATION. FACTORS WHICH HOLD SOIL TOGETHER o Cohesion  Internal Friction.
Trenching & Excavation (Subpart P). People die in excavations! Regulations 29 CFR 1926, Subpart P People die in excavations! Regulations 29 CFR 1926,
TRENCHING AND EXCAVATION: Safety Principles
Excavations & Trenching
COMPETENT PERSON TRAINING for TRENCHING OPERATIONS
GENERAL REQUIREMENTS CFR paragraphs (a) through (l) The Competent Person has responsibility to evaluate all hazards in the vicinity of the work.
Excavation & Trenching Awareness Plus
Trenching Competent Person
1 2 EXCAVATIONS STOP WORK !!! 3 Regulations OSH Standards Rule 1410 –Construction Safety OSH Standards Rule 1413-Excavation 29 CFR 1926 Sub Part P -
Trench Hazards Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 3.
Types of Protection Introduce the module. Trenching & Excavations Continuing Education Third Quarter 2017 Session 2.
Objectives Upon completion of this module you should be able to:
OSHA Office of Training and Education
Excavations Subpart P One-hour. Excavations Subpart P One-hour.
Presentation transcript:

1 Note from eLCOSH Division of Safety, Florida Department of Labor and Employment Security FDLES/CARE These materials were produced by the Division of Safety, Florida Department of Labor and Employment Security, as part of a special OSHA program to reduce work-related deaths in construction in California, Florida, and Texas. Because Florida's funding for the program - CARE, or Construction Accident Reduction Emphasis - ended in June 2000, the materials will not be updated. The materials should be reviewed yearly for any needed changes.

2 Excavation Safety

3 Objectives §To provide students with: l An introduction to 29 CFR 1926, Subpart P-Excavation Standard l An overview of soil mechanics l An introduction to trenching and excavation hazard recognition

4 29 CFR 1926, Subpart P § Scope, application, and definitions applicable to this subpart § General requirements § Requirements for protective systems

Scope, Application, and Definitions §Scope and application §Definitions §Competent Person

Scope & Application, Definitions §Accepted engineering practices §Aluminum hydraulic shoring §Bell-bottom pier §Benching §Cave-in §Competent person §Cross braces §Kick-out §Protective systems §Ramp §Registered professional engineer §Sheeting §Shield §Shoring

Scope & Application, Definitions §Excavation §Faces or sides §Failure §Hazardous atmospheres` §Sloping §Stable rock §Structural ramp §Trench

8 Definitions §"Excavation" means any: § 1. Man-made cut § 2. Cavity § 3. Trench § 4. Depression in an earth surface, formed by earth removal.

9 Definitions §Confined space is a space that, by design and/or configuration has: § 1. Limited openings for entry and exit § 2. Unfavorable natural ventilation § 3. May contain or produce hazardous substances § 4. Is not intended for continuous employee occupancy.

10 Definitions Cont. §"Trench (Trench excavation)" means a narrow excavation (in relation to its length) made below the surface of the ground. § 1. In general, the depth is greater than the width, but the width of a trench (measured at the bottom) is not greater than 15 feet (4.6 m).

11 Definitions Cont.

12 Definitions Cont. § 2. If forms or other structures are installed or constructed in an excavation so as to reduce the dimension measured from the forms or structure to the side of the excavation to 15 feet (4.6 m) or less (measured at the bottom of the excavation), the excavation is also considered to be a trench.

13 Definitions Cont.

14 Definitions Cont. §Accepted engineering practices are procedures that are compatible with the standard practice required of a registered professional engineer. §Adjacent structure stability refers to the stability of the foundation(s) of adjacent structures whose location may create surcharges, changes in soil conditions, or other disruptions that have the potential to extend into the failure of the excavation or trench.

15 Definitions Cont. §A competent persons is one who is capable of identifying existing and predictable hazards in the surroundings, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to eliminate them.

16 Definitions Cont. §A competent person must have specific training in, and be knowledgeable about, l soils analysis l the use of protective systems l requirements of this standard »Preamble page 45909

17 Definitions Cont. §Protective systems refers to a method of protecting employees from cave-ins, material that could fall or roll from an excavation face into an excavation, and from the collapse of adjacent structures. §Protective systems include support systems, sloping and benching systems, shield systems, and other systems that provide the necessary protection.

18 Definitions Cont.

19 Definitions Cont.

20 Definitions Cont.

General requirements §Surface encumbrances §Underground installations §Access and egress §Exposure to vehicular traffic §Exposure to falling loads §Warning system for mobile equipment §Stability of adjacent structures §Protection of employees from loose rock or soil §Inspections §Fall protection §Hazardous atmospheres §Protection from hazards associated with water accumulation

(c)(2) Means of egress §Means of egress from trench excavations: § 1. A stairway, ladder, ramp or other safe means of egress shall be located in trench excavations that are 4 feet (1.22 mm) or more in depth. § 2. A means of egress should require no more than 25 feet (7.62 m) of lateral travel for any employee to reach.

(k)-Inspections §Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in: § 1. Possible cave-ins § 2. Indications of failure of protective systems § 3. Hazardous atmospheres § 4. Other hazardous conditions.

(k)-Inspections Cont. §An inspection shall be conducted by the competent person: § 1. Prior to the start of work and as needed throughout the shift. § 2. After every rainstorm or other hazard increasing occurrence. § 3. These inspections are only required when employee exposure can be reasonably anticipated.

Requirements for protective systems §Protection of employees in excavations §Design of sloping and benching systems §Design of support systems, shield systems, and other protective systems §Materials and equipment §Installation and removal

(a)-Protection of employees in excavations §(1) Each employee in an excavation shall be protected from cave-ins by an adequate protective system designed in accordance with paragraph (b) or (c) of this section except when: l (i) Excavations are made entirely in stable rock; or l (ii) Excavations are less than 5 feet (1.52 m) in depth and examination of the ground by a competent person provides no indication of a potential cave-in.

27

(d)-Materials and equipment §(1) Materials and equipment used for protective systems shall be free from damage or defects that might impair their proper function.

(d)-Materials and Equipment Cont. §(3) When material or equipment that is used for protective systems is damaged, a competent person shall examine the material or equipment and evaluate its suitability for continued use.

(d)-Materials and Equipment Cont. §If the competent person cannot assure the material or equipment is able to support the intended loads or is otherwise suitable for safe use. § 1. Such material or equipment shall be removed from service. § 2. Such material or equipment shall be evaluated and approved by a registered professional engineer before being returned to service.

31 Worker Protection Systems §Appendix A Soil Classification §Appendix B Sloping & Benching §Appendix C Timber Shoring §Appendix D Aluminum Hydraulic Shoring

32

33 Soil Testing

34 OBJECTIVES §Provide the student with: A brief overview of 29 CFR 1926 Subpart P Excavation Standard A Brief Introduction into Soil mechanics A Brief overview of tests they can use in determining soil conditions

35 Overview: Soil Mechanics §Soil Mechanics §A number of stresses and deformities can occur in an open cut or trench. §For example, increases and decreases in moisture content can adversely affect the stability of a trench or excavation.

36 Soil Mechanics Cont. §Following are some of the more frequently identified causes of trench failure. §Tension Cracks: Usually form at a horizontal distance of.5 to.75 times the depth of the trench, measured from the top of the vertical face of the trench. §Sliding or Sluffing: May occur as a result of tension cracks.

37

38 Soil Mechanics Cont. §Toppling: In addition to sliding, tension cracks can cause toppling. § 1. Toppling occurs when the trench’s vertical face shears along the tension crack line and topples into the excavation.

39

40 Soil Mechanics Cont. §Subsidence and Bulging: § 1. An unsupported excavation can create unbalanced stress in the soil, which in turn, causes subsidence at the surface and bulging of the vertical face of the trench. § 2. If uncorrected, this condition can cause face failure and entrapment of workers in the trench.

41 Soil Mechanics Cont. §Heaving or Squeezing: §Bottom heaving or squeezing is caused by the downward pressure created by the weight of adjoining soil. This pressure causes a bulge in the bottom of the cut. §Heaving and squeezing can occur even when shoring or shielding has been properly installed.

42 Soil Mechanics Cont. §Boiling is evidenced by an upward water flow into the bottom of the cut. § 1. A high water table is one cause of boiling. §Boiling produces a “quick” condition in the bottom of the cut, and occur even when shoring or trench boxes are used.

43

44 Soil - Composition §What is Soil ?

45

46 Soils - Types §Gravel l larger than 2 millimeters §Sand l Smaller than 2 millimeters but larger than millimeters §Silt l Smaller than millimeters but larger than millimeters §Clay l Smaller than millimeters

47 Determination of Soil Type §OSHA categorizes soil and rock deposits into four types. Each type is briefly described below. §Stable rock is natural solid mineral matter that can be excavated with vertical sides and remain intact while exposed.

48 ROCK!

49 Black Pine Mine Slide - Idaho

50 Determination of Soil Type §Type A soils are cohesive soils with an unconfined compressive strength of 1.5 tons per square foot or greater. §Examples of type A soils are: clay, silty clay, sandy clay, clay loam, and in some cases silty clay loam and sandy clay loam.

51 Determination of Soil Type §No soil is type A if it is fissured, is subject to vibration of any type, has previously been disturbed, is part of a sloped, layered system where the layers dip into the excavation on a slope of 4H to 1V or greater, or has seeping water.

52 Determination of Soil Type §Type B soils are cohesive soils with an unconfined compressive strength greater than 0.5 tons per square foot, but less than 1.5 tons per square foot. §Examples are: angular gravel, silt, silt loam, previously disturbed soils unless otherwise classified as type C soil.

53 Determination of Soil Type §Soils that meet the unconfined compressive strength or cementation requirements of type A soils but are fissured or subject to vibration; dry unstable rock; layered systems sloping into the trench at a slope less than 4H to 1V ( only if the material would be classified as a type B soil).

54 Determination of Soil Type §Type C soils are cohesive soils with an unconfined compressive strength of 0.5 tons per square foot or less and include granular soils such as gravel, sand and loamy sand, submerged soil, soil from which water is freely seeping, and submerged rock that is not stable.

55 Determination of Soil Type §Type C soils also include in this classification material in a sloped, layered system where the layers dip into the excavation or have a slope of 4H to 1V or greater.

56 1 cubic ft.

57 Soils - Volume 1 cubic ft. = 83 lbs. = 31 lbs. Total = 114

58 1 cubic yd. 27 X 114 = 3078 lbs. Average soil Soils - Cubic Yard Weight

59

60 Field Tests §Documenting field tests §Sedimentation §Ribbon §Torvane §Pocket Penetrometer §Thumb imprint

61 Documenting Field Tests OSHA

62 §All Tests l Representative sample l Spoil pile l Inside the trench l Diagram l Site map l Record reading l Soil rating Documenting Field Test (continued )

63

64 Soil sample 1/4 Mix it - Quarter it Ribbon test Wet shaking Sedimentation Test

65 Documenting Field Test (continued) Torvane Pocket penetrometer Thumb imprint

66 Test # 1 - Field Sedimentation Test §Determines sand content §Used only on sandy soils §Sample taken from the spoil pile §Representative of soil in the excavation

67 Field Sedimentation Test (Continued) §Fill glass jar §5 inches of water on top of soil §1 1/2 inches of soil §Flat bottom container - at least 7 inches high

68 Field Sedimentation Test (Continued) §Place lid on jar and shake l Set jar down l Rotate slightly l Larger particles settle out immediately l Wait 30 seconds l Mark jar l Silt after several minutes l Fine clays in an hour l Make second mark

69

70 20% clay 80% sand

71 Test # 2 - The Ribbon Test

72 The Ribbon Test §Run only on that part of the soil which passes # 40 sieve §Test shows clay material §Run on disturbed soil §Representative sample from spoil pile

73 The Ribbon Test (continued) §Mix soil + water to make into plastic mass §Roll mass into cylindrical shape 1/2 to 3/4 inch diameter §Lay across palm of hand §Press between thumb and second joint of index finger

74 §Pass through thumb §Squeeze until it takes the shape of a 1/8 to 1/4 inch thick strip §Allow to hang freely from hand The Ribbon Test (continued

75 The Ribbon Test (continued) §Clay loam will barely ribbon and break easily §Clay = relatively long ribbon 6 to 8 inches or more §More clay = longer and stronger ribbon §Silt has tendency to produce short ribbon with broken appearance

76 Penciling

77 Test # 3 Torvane Shear Test

78 Torvane Shear §Designed to be used on saturated cohesive clay soil §Vanes are inserted into soil §Twist and shear soil at base and around circumference of vanes

79 Torvane Shear Test (continued) §Select fresh clod or block of undisturbed soil from spoil pile §Cut a smooth surface on the clod §Insert vanes of device into the soil §Retract vanes to show foot imprint §Set indicator at zero §Hold device firmly against soil and twist in clockwise manner until soil fails in shear

80

81 Test # 4 - Pocket Penetrometer

82 Pocket Penetrometer §Read the unconfined compressive strength at bottom of the red slip ring §The reading may be 2.0 tons per square foot shear strength §Which indicate the boundary between stiff and very stiff

83 Pocket Penetrometer Test §Device is designed to work on saturated clay soil §Measures unconfined compressive strength of soil §Twice the value of shear strength of same soil §Note machine ring about a quarter of an inch

84 Pocket Penetrometer (Continued) §Push red ring on the barrel all the way toward the handle §Push shaft into the soil up to the red ring §Hold barrel so as to not to interfere with the spring inside the barrel §NOTE slip ring moved on the barrel as barrel was pushed back into the handle

85

86 Hazard Recognition Slides

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

112

113

114

115

116