July 2007 egeplast Werner Strumann GmbH & Co. KG Robert-Bosch-Straße 7

Slides:



Advertisements
Similar presentations
HYDROCLICK SYSTEM.
Advertisements

Presented by : Bhavesh P. Thakkar (Managing Director)
Alireza Mahdizadeh - Jamaledin Borzouie
SEMI FINISHED PRODUCTS
Manufacturing Processes Lab I, MET 1321 Inspection and Testing Welds
Important features for industrial pipes and fittings out of polypropylene PP - Homopolymer and PP - Copolymer.
S URE FIT ® / R.TEC ® CLOSE-FIT-LINER AGRULINE. CONTENTS  Introduction – current situation  Production  Installation  Advantages  Quality assurance.
Pipe Cutting System The evolution of Patented products Designed in Finland pipe cutting.
CONSTRUCTION OF SOIL NAILING WALLS
Carpentry Skilled Trades 1201 Footings and Foundations.
Foundations and basements
Jan Bremert Technical Director Tba International GmbH & Co. KG Fabersweg Norderstedt Germany Phone.: Fax:
Student Book © 2004 Propane Education & Research CouncilPage Installing Buried Distribution Lines Using Polyethylene Tubing and Mechanical.
TRENCHLESS INSTALLATION AGRULINE. HORIZONTAL DIRECTIONAL DRILLING (HDD)  Diameters up to OD 600  Length up to 500 m  Drilling to the target pit  Fixing.
C F MACHINERY Trade & Services – Import & Export Steel Welded Pipes and Shapes.
SOLVAY PVC : the long term building material Joël Fumire Research & Technology SBU Vinyls São Paulo, 2005.
Subsurface Investigation Building structure system.
About Us Company established in 1990 Technology developed for uranium heap leaching on depths up to 800 meters Production facility is located in Yekaterinburg,
Foundation Engineering CE 483
TRENCHLESS TECHNOLOGY
Compressed Air Piping Systems by Asahi/America
1 Design and drawing of RC Structures CV61 Dr. G.S.Suresh Civil Engineering Department The National Institute of Engineering Mysore Mob:
13.4. GENERAL DESIGN CONSIDERATIONS: PRESSURE VESSELS
Robert Gleim Oct. 27 th,  Pipe is designed to handle the following load conditions: ◦ A minimum design life of 20 years at MAOP and MAOT ◦ Hydro.
The process of Machining and Assembly of Engine 刘洋 Liu Yang
WELDING EQUIPMENT WELDING EQUIPMENT BRAZING GAS FUSION WELDING GAS FUSION WELDING ELECTRIC ARC WELDING ELECTRIC ARC WELDING INDUSTRIAL TECHNOLOGY- METAL.
Working Metals Depending on the application, the process used to work a metal may vary. Common processes include: Casting Forging / Pressing Fabricating.
DVGW certification of products in contact with drinking water Dipl.-Ing. Anton Wohlgemuth DVGW CERT GmbH, Bonn.
My septic system is working just fine! New State Wide Rules Began 1 st of 2015 replacing the 1977 code Goals Update system designs to currently available.
Department of Civil Engineering,
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
TRENCHLESS REHABILITATION AGRULINE & AGRUSAFE. OVERVIEW  Relining with AGRULINE  Slip-lining  Close-fit-lining  Burst-lining  Relining with AGRUSAFE.
Gandhinagar Institute of Technology
City Gas Distribution: A Network Analysis
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
The environmental performance of plastic pipe systems An assessment based on Environmental Product Declarations (EPDs) V-TEPPFA 1N/2012.
Muoviteknologia Teppo Vienamo Joints / attachments Principles of joining plastics parts Mechanical joints / attachments Adhesives Welding.
ICORR Technologies, Inc.
Drilling Interlocked O-Pile Walls with DTH + PPV FINLAND.
Reactor pressure vessels of WWER (materials and technology) Janovec, J
EIFELWERK Präzisionsgusstechnik GmbH, Thomas Croy (11) © 2011 Eifelwerk-Gruppe 1 Quality out of one hand.
Steel Wire Mesh Reinforced HDPE Pipe Roobuck Pty Ltd.
FLUID FLOW FOR CHEMICAL ENGINEERING Dr Mohd Azmier Ahmad Tel: +60 (4) EKC 212 CHAPTER 8 (PART 1) TRANSPORTATION SYSTEM.
Service is the difference MEA Roundtable October 30, 2007.
1 Investigation of vibration properties of the KEKB tunnel after the Great East Japan Earthquake Contents Situations after the earthquake Geological survey.
New High Strength Bainitic Steel 20MnCrMo7 for Automobile Applications in Powertrains Dr.-Ing. Serosh Engineer, Dipl.-Ing. Charlotte Merkel EZM EdelstahlZieherei.
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
DIAPHRAGM WALLS.
A level Product Design Unit 2
5. FERROCEMENT.
J.PRATHYUSHAG.TEJASRI DEPARTMENT OF CIVIL ENGINEERING.
Structural Slab Analysis
DRY TREATMENT STANDARD
27-28 April 2015 Eng. Mubarak Yusuf Al-Kawari Presented by:
NANOSILICATES AND POLYMER COMPOUNDS BASED ON THEM
Extending the life of essential sub surface assets
TRENCHLESS TECHNOLOGY
BROCHURE & PRODUCT DETAILS
WATER MAIN REHABILITATION
EARTHING.
Arch205 Materials and building construction 1 foundation
Arch205 building construction foundation
NEXOR HDPE PIPING SYSTEM
The evolution of pipe cutting Patented products Designed in Finland Pipe Cutting System.
Welcome! Drafting 2323: Pipe Drafting
Govt. Polytechnic,Manesar
UKRAINE, KYIV REGION, BARYSHIVKA plant was put into operation in 2007
Presentation Thermopex
Presentation transcript:

July 2007 egeplast Werner Strumann GmbH & Co. KG Robert-Bosch-Straße 7 48268 Greven

The new factory Commissioned: January 2001 Size of grounds: 150,000 m² Production facilities: approx. 18,000 m² Extrusion hall: 90 m wide, 150 m long Extrusion lines: 14 Dimensional range: DA 7 – 1200 mm Pipe raw materials: PE and PP Rated capacity/year: 55.000 tonnes

Pipe Installation back then…. and today! Strong growth in non-conventional installation techniques over the past 20 years Quelle: Fiedler, Göttinger AWT 2006 Open Installation only 10% pipe material Civil works up to 90% Up to 50% cost for surface restoration Trenchless by Relining Quelle: Gelsenwasser Quelle: A. Hügging in 3R international (2000) Non-conventional pipelaying saves money – however, requirements towards pipe material are higher!

Development of PE-HD as a Material for Pipes PE100 RC PE 100 3rd Generation Perfomance PE 80 2nd Generation PE 63 1st Generation 1970 1980 1990 2000 Year

Polyethylene : Molecular Structure HDPE: filamentary macromolecule with a few branches Polyethylene molecule crystalline structure branches

Influence on Materials Properties PE-molecule Property short molecules without branches long molecules with branches Structure high stiffness high strength crystalline high ductility high crack resistance high resistance against scratches and notches amorphous crystalline amorphous

Increase of Resistance against Slow Crack Growth SCG by Comonomer Branches without Comonomer with Comonomer

Today: 3rd Generation PE 1. Generation: monomodale - without comonomer 2. Generation: monomodale - with comonomer 3. Generation: bimodale - with comonomer Chain length Content [%] monomodale bimodale Increasing the crack resistance: Comonomer branch in longest macromolecules By bimodal distribution strength and ductility were equally increased

The Right Pipe System for every Application Trench Installation in Sand Bed egelen® Trench Installation without Sand Bed egeplast 90 10® Trenchless Installation/ Renewal egeplast SLM® 2.0

The Right Pipe System for every Application egeplast SLM® 2.0DCT Detection of embedded pipelines and checking the integrity Protecting drinking water in Contaminated Soil egeplast SLA® 2.0 Environmental safety through permanent leakage monitoring egeplast 3L/SLA®

Trench Installation without Sand bed Sand bedding unnecessary thanks to modern materials • Use of excavated soil allows quicker and more cost-effective installation. • In Rural regions modern techniques like ploughing and milling decrease the contracting time • Additional point loads are exert on the pipe during its live time by stones • Pipe system need to be stable against these point loads, so that these do not result in stress-induced cracking Scoring Point load Ploughing Milling Special Quality Control of the slow crack properties guarantees the long lifetime of these pipes !

PE 100 RCplus Resistance to Slow Crack Growth Testing Full Notch Creep-Test FNCT (ISO/DIS 16770) Point Load Test acc. Dr. Hessel Notch-Test (DIN EN ISO 13479) > 5000 h acc. KRV Richtlinie R 14.6.36

Resistance to Crack Correlation between FNCT and Pipe Pressure Test PE 100 RCplus (Resistence to Crack) > 3300 h DVGW GW 323 „Berstlining“ PE 100+ PE 100 PE 80 PE 63 Source: HESSEL Ingenieurtechnik

Materials in Comparison

PE 100 RC in accordance with KRV Standard R 14.6.36 Testing time Notched Pipe Test according to DIN EN ISO 13479: Material Temperature Pressure Time [°C] [bar] [h] PE 100 RC 80 9,2 > 5000 Additionally egeplast PE 100 RCplus: Point Load Test as a type test: > 8760 h at 80°C, Arkopal N-100, s=4,0 N/mm² Testing time FNCT (ISO/DIS 16770 ) each lot: > 3300 h bei 80°C, Arkopal N-100, s=4,0 N/mm² Acc. Dr. Hessel in 3R international 4/2001 und 6/2001

Trench Installation without Sand bed Reducing Costs without forfeiting safety The ideal combination: Modern crack-resistant Materials and intelligent pipe structure egeplast 90 10® A 10% coloured outer layer is isometrically integrated to allow an exact evaluation of the pipe surface pursuant to DVS, DVGW, KRV and EN standards. Max. 10% damaging are permissible. Pressure pipe manufactured from PE 100 RC plus (Resistance to Crack) 90 % of the standard wall thickness PE 100 RC black 10 % of the standard wall thickness PE 100 RC coloured =100 % safety

Signing out the Scratch Depth One Layer Pipe Control of Scratch Depth is impossible! egeplast 90 10® Scratch Depth is Controllable!

Geometry of the pipe wall Trench Installation without Sand Bed 5.740 m DA 315 x 18,7 mm; SDR 17 660 m DA 315 x 28,6 mm; SDR 11 3.060 m DA 250 x 14,8 mm; SDR 17 Geometry of the pipe wall Installation without Sand Bed is possible

Welding of two layer pipe: Standard Butt Welding Electro Fusion Coupler Different layers are welded together, the welding process follows typical standards like DVS 2207, part 1.

Preoperational Cleaning of a new Pipeline Cutting the but weld Cutting Process Preoperational Cleaning of a new Pipeline

Trenchless Installation and Renovation Techniques Pipe is pulled through undefined bore hole (black box) Relining Horizontal Drilling Pipe Bersting

egeplast 90 10® - SLM® 2.0 Pressure pipe manufactured from PE 100 RC (Resistance to Crack) According DVGW standard GW 335 A2 Pressure pipe manufactured from PE 100 RC (Resistance to Crack) according DVGW standard GW 335 A2 Isometrically integrated, 10% coloured outer layer, to allow an exact scratch evaluation Additional extremely robust protective coating made of reinforced polypropylene

Unprotected PE-Pipe vs. Coated Pipe after No-Dig Technology [mm] 1 2 3 Unprotected PE Pipe [mm] 1 egeplast SLM® 2.0 Coextruded Multilayer Pipe e.g. egeplast 9010® No-Dig Technology Scratches penetrate polyethylene pipes 3 times deeper than coating No Damages under the coating

Protective Function Safety Welding Conditions after No-Dig Technologies

Projects: Relining Relining of Cast Iron Pipe 200m SLM® 2.0 280 x 25,4mm, PN 10

Berstlining for renovation of cast iron pipes Projects: Berstlining Berstlining for renovation of cast iron pipes Bore hole for tapping valve Bersting of the cast iron pipe Pulling rod GG-Pipe (Gas)

Projects: Drilling Drilling through Karst rock in Austria SLM® 2.0 OD 180mm SDR 7.4 sewage pipe with an overall length of 516m Drilling length about 400m

Projects Berstlining of a cast iron pipe House connections

Thank you for your attention!