Do-It-Your Self Inflatable Gid-ur-dun!. Materials Time : 1-2 days (approx 12 hours to install) Materials Needed: most of this can be bought at HomeDepot.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Jennifer Wolfe NAEA CONVENTION Baltimore, MD 2010.
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
HVAC523 Soldering.
Agricultural Mechanic and Technology Cluster
Jody Stouffer & Brian Wohleben – Lee County High School.
Dog and Cat Handling.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Growing Fish in a Recirculating System: Advanced Teacher’s Workshop An Inexpensive Recirculating System Blan Page & PJ Waters.
Pin Cushion Assignment HNC3CI Crowell Adapted from Fairy Face Designs.
BIODIGESTORES. Materials 1.1 PVC macho adaptor ½” 2.2 five gallon buckets with the bottoms removed 3.1 PVC hembra adaptor ½” 4.2 non-corrosive washers.
Split Sole 45 Degree Raker
BalloonSat Construction Ideas and Suggestions. What is a BalloonSat? Functional Model of a Satellite Carried by Balloon to at Least 60,000 Feet Operates.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
How to Sew a Button Step by Step Instructions. Thread the Needle If you like, you can double the thread to make this job quicker. Simply pull it through.
PAPER ROCKET LAUCNHER Bob Galliher Hobart Middle School 705 e.4 th St. Hobart, In
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Matt Petrie KEPA 119 4/16/09. If there is a situation where a shelter is going to be needed then it should be one of first things to taken care of. People.
Unit 204: Common plumbing processes
Bezel Ring.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Concrete
Specification section 3.3
Foundation Systems.
ROCKET MANIA Challenge Create one bottle rocket that will fly straight with a parachute that will create air friction (drag) and slow velocity to reduce.
Dr. Sophia Hassiotis.  Laboratory set up  Personal Protective equipment  Directions for mixing  Slump test  Cylinder casting  Cleaning up your station.
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
Installation. Indoor Unit Installation Typical Installation.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Parts list 1 – 8’ 2” OD stainless steel pipe, chamfered at both ends 1 –7’ 4” PVC pipe 2 – 4” PVC end caps, with appropriate holes 1 – heater (model#=Omegalux.
CONSTRUCTING A FIVE CABIN LATRINE
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Intro to Concrete 18.0 & 19.0 Class notes.
QUAD Field Painting. 1. Knife Rolls of 800-ft line Large spikes yd tape measure.
STATE WIDE SIGN GUIDE This guide will demonstrate various sign mounting products and procedures for construction and maintenance.
Drywall Theory. Dry Wall Saw Dry wall T-Saw Dry Wall Lift.
Hard Floor Care VCT floor finish application This presentation is available for review at:
Parts list 1 – 8’ 2” OD stainless steel pipe, chamfered at both ends 1 –7’ 4” PVC pipe 2 – 4” PVC end caps, with appropriate holes 1 – heater (model#=Omegalux.
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3- Develop Solutions Unit 4- Implement A Solution Unit 5- Test and Evaluate.
The Chuck Norris of snow shelters
Growing a container garden. Navigation To navigate this presentation, you can click on the user interface icons below. Click on this image to get back.
How to Sew a Button Step by Step Instructions. Thread the Needle For buttons, you should double the thread to make the job quicker. Pull it through the.
How to Sew on a Button. Types of Buttons Two Hole Button Four Hole Button Shank Button.
STEP BY STEP INSTRUCTIONS Basic Hand Sewing. Thread the Needle If you like, you can double the thread to make this job quicker. Simply pull it through.
Make a Gas Cylinder Cooker. © G. Norris 2011 Copyright This document and the information contained within is copyright to © G. Norris Reproduction.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
 Step 1: Digging the Hole  First dig yourself a good hole. I had a look at pond liners that were available first and knew that I could get one that.
1A. STRETCHES SCORPION STRETCH STRAIGHT LEG DEADLIFT
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
VIEW SERIES with Sliding Door
Learning for Water wehelptwo.com
BASTING QUILTS USING POOL NOODLES
Sewing Basics: How to Sew on a Button
Hot-Air Balloons.
Step by Step Instructions
Garden Installation Rebecca Wolf and Nguyen Le
BIODIGESTORES.
Step by Step Instructions
Step by Step Instructions
Sewing Basics: How to Sew on a Button
Step by Step Instructions
Clay Canteen Project.
Presentation transcript:

Do-It-Your Self Inflatable Gid-ur-dun!

Materials Time : 1-2 days (approx 12 hours to install) Materials Needed: most of this can be bought at HomeDepot pieces 2”x12” treated lumber, 16’ long sticks 3/8” cold role steel rod 20’ long 3. Carpet padding: get the cheapest stuff (4 or 6 lbs)* 4. Air blower (Grainger item: 7C447) – there are other, cheaper, blowers available 5. 2 pieces 3” diameter pvc 10’ long degree PVC elbows 7. Electrical power 110V 8. Drain collection box x 3/8” eye bolt harden steel. Granger item # 3ZHJ7 or 5ZU18. At least 6” in total length, nuts, and fender washers. The quality of the steel is very important ’ of 9/16 webbing REI.com Item # FOLLOW THE DIRECTIONS IN ORDER!! READ ALL INSTRUCTIONS BEFORE STARTING

#1 Mark the Ground The Rule of 3,4,

Mark the Ground Mark the outline of the inflatable on the ground. Your dimension (inside wall of the trench) are going to be: 65’2” x 37’8”. Be sure to think it over twice when deciding where to place your inflatable. Take in consideration drainage, utility lines, and underground power gas or pipes. A simple way of finding a 90 degree angle is the rule of 3,4,5. Sides measuring 3, 4, and 5 will result in a 90 degree angle. How to use the rule of 3,4,5: Note: these instructions use meters, but you can also use feet: To set out right angles in the field, a measuring tape, two ranging poles, pegs and three persons are required. The first person holds together, between thumb and finger, the zero mark and the 2 meter mark of the tape. The second person holds between thumb and finger the 3 meter mark of the tape and the third person holds the 8 meter mark. When all sides of the tape are stretched, a triangle with lengths of 3 m, 4 m and 5 m is formed (see Fig. 20), and the angle near person 1 is a right angle. NOTE: Instead of 3 m, 4 m and 5 m a multiple can be chosen: e.g. 6 m, 8 m and 10 m or e.g. 9 m, 12 m and 15 m.

#2 Dig the Trench

Dig the Trench Dig a trench on the out side of your rectangle, 12” wide and at least 24” deep. It is ok If you go down to 26”. Take care to dig a straight line and that the floor of the trench is smooth and flat. By following the outline you have already marked on the ground you will be able to dig straight and consistent. I cannot imagine doing this task by hand with shovels. You are going to need a backhoe. The typical bucket is 12”x 24” so finding your depth will come relatively natural. If you are familiar with a backhoe then you will be able to dig this trench in 3-6 hours. Digging the trench is the most difficult part of the job, the most time consuming, and one of the most critical steps. Take your time and dig straight. You want the bottom of the trench as flat as possible so you do not leave hollow spaces under the boards. Note: Place the excavated dirt on the outside of the trench and NOT on the inside where your inflatable will be! Also, place your tarp inside the area before you dig the trench. It weighs about 500 lbs. so you don’t want to lift it over the trench after it is dug. Take your time and dig a clean straight trench

Cross section of the Trench 12” 24”

#3 Dig PVC trench 4’

PVC Trench Dig a small trench in a corner for the PVC pipe. Decide where you want you the blower. It doesn’t matter which corner just make it convenient for you. I placed ours close to our power supple. This trench only needs to be deep enough to bury it a few inches under the canvas and anchoring system.

#4 Install PVC plumbing 6’

PVC Piping After you finish digging the trench you will install the piping. You will need 6x90 degree elbows and 20 feet of 3” PVC pipe. Prime and glue the connections. Then, bury the system so as you can cover the area with the canvas and the anchoring system. When you have finished it will look like you are back to step 2.

#5 Lay down carpet padding

Carpet Padding Place 4 or 6 lbs carpet padding over the edges. This padding will act as a buffer between the canvas and the earth. It will also provide padding as people walk on or off of the inflatable. 4 lbs padding is cheaper but sometimes harder to find. It is more economical to buy from a wholesaler then from Home Depot. Regardless of where you get the padding buy the cheapest stuff you can

#6 Lay down canvas, and insert steal rods

Canvas and Rods A. Spread the canvas over the area. The canvas weighs 500lbs so you will need two or three people to help. It is very important to keep the canvas straight. You want all of the edges straight. If the lines are straight the INFLATABLE will look good and you will have equal anchoring all around. Pull the canvas tight. Pull it as tight as you can by hand. It will seem that the canvas is too tight and will not inflate. This is not the case. It will inflate and it will be perfect. The excess material at the corners can be tucked under its self. Like the way your mama wants you to make your bed. B. Insert the steel rods into the pockets that have been stitched around the edges of the canvas. After you insert the first rod overlap the last 12” with the second rod. If you tape the two rods together with duct tape you will be able to push the first rode by the second rod. Continue to insert the rods until all of the pockets are filled.

#7&8 Prepare the boards and use the webbing to tie down canvas

Step 7- Eye bolts Drill twelve 3/8 holes down the center of each 2”x12”. By starting 14” from one end this will place your last hole about 2” from the opposite end. Place an eye bolt in each hole. Use the washer and nut on the backside to anchor the eye bolt into the board. Place the 2”x12”s end-to-end on the bottom of the trench, so that there is an eyebolt every 16”. Be sure the boards lay flat and that there are no voids under them.

Step 8- webbing You will first need to cut the webbing into 3-foot lengths. I have supplied extra feet, so don’t worry if you make a few mistakes. Remember to melt the ends. Use the provided webbing to tie the canvas to the 2”x12” by threading the webbing through the eyebolt and around the 3/8” rod in the pocket of the canvas. In order to loop the webbing around the rod you inserted in the pocket of the canvas you will have to cut a vertical slit in the pocket with a good pair of scissors. This will allow you to loop the webbing around the rod, and through the eyebolt on the 2”x12” and then pull the webbing tight and tie it with a square knot. Repeat this process around the entire pillow tying the webbing every 16 inches. (I recommend tying the knot close to the canvas, so that if you ever have to remove slack in the canvas you will only have to dig down to the knot.) If you dug your trench a few more inches deeper than 24” than you can tie the webbing tight enough that it allows the boards to float 1” over the bottom of the trench. Then when you back fill the dirt it will then push down the board making your canvas even tighter.

Step 9 Back fill the trench. Use a water hose to wet the dirt so that it will more tightly pack into the trench. The more water you use the better. Pack the dirt as tight as you can! Backfill in LAYERS, packing as you go. As soon as you have all the trenches back filled you can plug the blower into the PVC and fill it up. Allow for a few good rains to settle and pack the dirt. You can add the sand whenever you want, but I would recommend waiting for a few good rains so that the dirt is more heavily packed, and if you have any small problems you will be able to fix them without having to excavate the sand.

Step 10 Call us before you install. We are positive you can manage it on your own, but we have found that it is better if you are able to talk it through once or twice. Congratulations! You just installed an “inflatable” and saved thousands of dollars. Take your wife out to eat and let the kids jump until they are too tired to move