4 mai 2015 New Gas Works Concepts: The examples of minimal trenching Franck Groeschl ( DVGW – Bonn) - Hartmut Reichenbach (S&P - Stuttgart) Jean-Pierre.

Slides:



Advertisements
Similar presentations
Best Available Techniques (BAT)
Advertisements

Federal Highway Research Institute Bundesanstalt für Straßenwesen (BASt) Federal Highway Research Institute.
CONSTRUCTION DRILLING INC.
Sustainable Construction
1/47 Better infrastructure for motorcyclists Roadside barrier campaign Maurice Anderson BVDM Germany Member of the FEMA Board of Directors.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES.
An initiative of UDIA EnviroDevelopment. EnviroDevelopment Overview Independent certification of sustainability credentials Breadth of coverage - energy,
PAVEMENT DESIGN. Introduction Pavement design is the major component in the road construction. Nearly one-third or one-half of the total cost of construction,
DEPARTMENT OF CIVIL ENGINEERING ENVIRONMENTAL GEOTECHNOLOGY 2011
The INTERREG IVB NWE Programme: an overview. NWE Eligible Area Ireland UK Belgium Luxembourg Switzerland* Parts of France Germany Netherlands.
THE ROLE OF STAKEHOLDERS IN A DEVELOPING REFERENCE MODEL OF CITY LOGISTICS Jarosław Witkowski Wroclaw University of Economics, Poland Maja Kiba-Janiak.
Environmental life cycle assessment. Why Sustainable Construction?  Social progress, which recognises the needs of everyone  Effective protection of.
INTRODUCTION Course on Cleaner Production Middle East Technical University Department of Environmental Engineering Ankara 31 March 2008.
Life Cycle Analysis and Resource Management Dr. Forbes McDougall Procter & Gamble UK.
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
TRENCHLESS TECHNOLOGY
Chapter 2b Foundations Shallow & Deep Foundations.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
The WWF’s ne Planet Living campaign - Moscow, Russian Federation, 14/11/08 Gaël Léopold Manager, Corporate Partnerships Coordinator, OPL Francophone Europe.
Adaptation & Technology Gaps Anne Olhoff Head of Programme Climate Resilient Development UNEP Risø Centre UNEP Adaptation Knowledge Day V, Bonn, 9 June.
Save the Nature The environmental problems in Silesia (Poland)
PROGRESS REVIEW POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,
ROAD TRANSPORT RESEARCH, TECHNOLOGICAL DEVELOPMENT AND INTEGRATION (2003 Call)
Urban Design Goals: Produce a high quality living environment for all residents. Clarify and enhance the relationship between new housing development and.
Confidencial © 2011 TECNALIA 1 TECNALIA. 2 Tecnalia R&I 1st. Research and Technology Organisation in Spain and 5th. in Europe.
Problem: surface ponding. Solution: surface or subsurface drainage.
Environmental Business Support in the UK : Providing Added Value to Business Progress Towards Sustainability? Frances Hines BRASS Cardiff University.
1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2015 Reforms, Challenges and Safety Treacys West County Hotel, Ennis, May 2015.
Gandhinagar Institute of Technology
Why Sustainable Construction?  Social progress, which recognises the needs of everyone  Effective protection of the environment  Prudent use of natural.
DR O.S ABIOLA DEPARTMENT OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA. CVE 505 HIGHWAY & TRANSPORTATION ENGINEERING I.
Soil and Earth Works Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 3 - Week 2 2 nd Semester 2008/2009 UP Copyrights.
Waste Management. Early Concepts of Waste Disposal Start of Industrial Revolution, the volume of waste produced in the US was relatively small. Factories.
4. GEOMETRIC DESIGN OF HIGHWAYS
The ORFEUS Project: a step change in Ground Penetrating Radar technology to locate buried utilities Guido Manacorda Engineering Manager IDS Ingegneria.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
High Modulus Asphalt (EME)
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Traffic engineering Építés- és környezetföldtan 4. Engineering and Environmental Geology.
Objective of an efficient materials management. The objective of an efficient materials management is to provide the right materials (tools, work tools,
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Nigel Hannam and David Phillips Parish Conference – 11th September 2013 Balancing Development.
DARSHANA RAGHU MANAGEMENT. Risk Management Risk management is the identification, assessment, and prioritization of risks followed by coordinated and.
RE-USE and RECYCLING of CONSTRUCTION WASTES in FRANCE By Jean Paul Michaut.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
Lessons and Learning from ‘Special’ Henk van der Kamp IPI/Vice-President ECTP-CEU.
DIAPHRAGM WALLS.
Life Cycle Assessment Assessing local impacts María del Mar Pintor
MIT University Skopje Ass. Prof. Oliver Andonov, PhD
Julija Šommet J.-R. PASTARUS, Y. SYSTRA, I. VALGMA, V. VÄIZENE
WASTEMENEGEMENT IN BUILDINGS
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Food Production for Space Exploration: Essentials and Challenges
An ETP Studentship with University of Strathclyde and TNO (NL)
Excavation.
Govt. Polytechnic,Manesar
TREMTI 2005 ___ LIME TREATMENT FEED BACK ______
PIPE LIFTING KIT HAMMER MULETRAX 2300 C
IMPLEMENTATION OF ARTICLE 9
BET403 Cost Engineering Individual Assignment & Group Report
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
Presentation by: Ajay Kumar KC
Table 3. The needed requirements of the Concrete Sustainability
CR-GR-HSE-419 Safety of excavation works
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Presentation transcript:

4 mai 2015 New Gas Works Concepts: The examples of minimal trenching Franck Groeschl ( DVGW – Bonn) - Hartmut Reichenbach (S&P - Stuttgart) Jean-Pierre Capdevielle ( Gaz de France – Saint Denis)

Diapo 219/04/ Improve the safety of gas networks Facilitate identification of existing structures Improve passive protection of networks Limit the impact of works for neighbours Hindrance to traffic (car and pedestrians) Works duration - Reduce the environmental impact Reduce the environmental impact Reduction in volumes of waste Reduction in borrow quantities Improve economic efficiency Direct cost during laying Indirect cost, reducing risks to third parties Improve safety and quality of urban works: with a global approach to the works function

Diapo 319/04/ Consideration of the site typology Optimisation of the trench geometry Suburban or rural Few traffic constraints Possibility of bringing in large construction machinery Few obstacles in the soil Urban environment High traffic density Construction machinery adapted to town centres Large number of obstacles in the soil (particularly under the pavement) Laying at shallow depth (Gaz de France /ETDE project) Placement in narrow trench with recycling of material (DVGW / Gaz de France project)

Diapo 419/04/ Minimal intrusion into roadways while ensuring optimum quality and reduction of costs Aim of the research project «Minimal Trenching »: Determine the construction methods for minimal intrusion Optimise quality assurance for street works and pipe laying Professional guideline with a view to harmonisation of French-German standards

Diapo 519/04/ Essential aspects of the research project Comparison of guide lines and required performances in France and in Germany

Diapo 619/04/ Essential aspects of the research project Treatment of excavated soils for re-employment as backfill material

Diapo 719/04/ Essential aspects of the research project Long term study of the behaviour of recycled materials Study of the « re-excavability »

Diapo 819/04/ Essential aspects of the research project Quality control ( Q.C)

Diapo 919/04/ Facilitate laying conditions in suburban environment Definition of technical-economic recycling conditions Narrow trench site – depth according to regulation Study of self compacting materials based on recycled excavated materials (Germany)

Diapo 1019/04/ Facilitate laying conditions in urban environment with new self-compacting concrete in shallow trenches PATENTED WITH ETDE

Diapo 1119/04/ A technique in service already tested internationally (Switzerland, U.K.) 1 km done in narrow trench – 50 cm deep « Just-in-time & short » site minimising nuisance to neighbours Reopen for traffic at the end of the day

Diapo 1219/04/ Knowledge of the soil before the work GIGA and ORFEUS : Two european projects with PCRD to federate the best skills Objectives: to characterise the performances of existing radar systems and develop new systems capable of satisfying user needs

Diapo 1319/04/ Tests in controlled environment An environment adapted to performance tests  20 to 160 mm diameter tubes (PE, steel, cast iron)  20 cm to 2 meters deep (positioned with precision)  4 different types of soil (sand, earth, clay-lime, fill)  2 surface types (coated chippings,soil) Knowledge of the soil before the work GIGA and ORFEUS : Two european projects with PCRD to federate the best skills

Diapo 1419/04/ Conclusions with these 3 R&D GERG Projects : Placement in narrow trench with recycling of material Laying at shallow depth with new self compacting concretes Optimised GPR to find every distribution networks under the streets Opportunities to use, in Europe, new technologies with evolutions of laying rules for the distribution gas pipes + +