Digging out the trenches, experience in Russey, August 2003, version 27.10.03 1.Delineate 3 independent contiguous trenches on a surface of 11 x 4(5) meters.

Slides:



Advertisements
Similar presentations
Leave No Trace. Leave No Trace Principles 1. Plan ahead and prepare. 2. Travel and camp on durable surfaces. 3. Dispose of waste properly. 4. Leave what.
Advertisements

Chapter 3: Elements of Design Transition Design Controls (p
Pot in Pot Nursery Production
Cairo Metro Line3 / Medinah Car Park II
Tree Planting Techniques Mark J. Platten CSU Extension Director, Teller County.
Locating the GreenlineLocating the Greenline  Define the greenline  Sampling using a monitoring frame  Greenline rules  Examples.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
3-D Figures Surface Area and Volume
Measuring Devices:. MEASURING MASS There are various types of laboratory balances. The triple beam beam balance you use may look somewhat different from.
Measuring Instruments
Field Hydrologic Cycle Chapter 6. Radiant energy drives it and a lot of water is moved about annually.
Design of Open Channels and Culverts
CONTOUR LINES.
Maps.
John Porter Why this presentation? The forms data take for analysis are often different than the forms data take for archival storage Spreadsheets are.
What's New in the CVS-EEP Data Entry Database This document helps point out some the new features and improvements we've made in recent versions. versions.
CONSTRUCTING A FIVE CABIN LATRINE
By Catherine Fontenot LTEC /29/ Preparations for your tree Preparations for your tree The tools you will need for the job The tools you.
Information from
Finding Area Part 1: Rectangles Math 6. Objectives: 1.Find the area of right triangles, other triangles, special quadrilaterals, and polygons by composing.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
. Introduction Rice crop is sensitive to water stress causing reduction in quality and quantity of yield. Therefore management of irrigation is of uttermost.
Lecture 5 Method of images Energy stored in an electric field Principle of virtual work 1.
- Water beneath the Earth’s surface in sediment and rock formations.
What is a map? A Map is a two or three-dimensional model or representation of the Earth’s surface. 2-Dimensional map.
Leave No Trace Peter and Matt. Plan ahead and prepare – Know the regulations and special concerns for the area you'll visit. – Prepare for extreme weather,
Lecture Notes Applied Hydrogeology
Woody Plant Installations to Ensure Survival Lync Training (12 March 2013) Dr. William M. Fountain Extension Professor of Arboriculture UK College of Agriculture.
Subsurface Water unit volume of subsurface consists of soil/rock, and pores which may be filled with water and/or air total porosity= volume voids/total.
Context, tests and considerations for field measurements (WP I) … RECIPE.
BOX PLOTS (BOX AND WHISKERS). Boxplot A graph of a set of data obtained by drawing a horizontal line from the minimum to maximum values with quartiles.
UNIVERSAL DESIGN- BARRIER FREE ENVIRONMENTS
Chapter 34 Water On Our World. Hydrologic Cycle.
1 Home Gardening and Nutrition Training Material GROW FOOD AT HOME Homestead gardening for food security in Lesotho.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
DAY 2. Mean is the Average. How do you find the average ? Median = number in the middle. How do find the median? Mode is the number that shows up the.
Prairie Lab Tips for revising your lab. General Carefully read the instructions in: –The Prairie Lab handout –The Lab Grading, Lab Reports, & Worksheets.
Groundwater Water that soaks into the ground as it enters tiny air spaces in the soil and rocks.
Atomic Absorption Spectroscopy
1 Structural Control Practices ©2002 Dr. Bradley C Paul.
Get the Ground Water Picture. Individual Questions The horizontal scale of the cross section is 1 inch = 1 mile. The vertical scale is 1 inch = 50 ft.
1 2 Measurement of Volume Volume is the amount of space an object takes up.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
Grid Pix Field Simulations and precision needed for a module Peter Kluit, Jan Timmermans Prepared 16 May 2016.
1. CHAPTER 3 SUB-SURFACE DRAINAGE THEORY ERNST EQUATION 2.
In Practical Terms… It’s land that is regularly covered or soaked with water for part or all of the year and has a presence of wet- adapted species.
EXERCISE: A 0.04ha pond has to be built in clayey soil with dikes 1.50m high and 1m wide at the top. If SD = 1.5: 1 and SW = 2:1. Calculate the base width.
Garden design and layout
HOME COMPOSTING OPTIONS
Comparing and Ordering Decimals
ECF Arbiter Seminar - Materials by CAA
Get out your notes we previously took on Box and Whisker Plots.
The Household Hunger Score Project
Isolines An isoline is a line connecting points of equal value.
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
Maintenance of the On-Lot Sewage System
Why might this map be useful?
Reading Data on a Graph Do Now 1 LP 1 start.
Terrestrial Marine (LAND) (OCEAN)
Roots and Planting Trees
Internal Assessment IB Geography
“Ground Water Movement”
Comparing and Ordering Decimals
SETTING UP OF AQUARIUM.
Leave No Trace.
North Carolina's Selective Vegetation Removal.
Ground Water Infiltration
Presentation transcript:

Digging out the trenches, experience in Russey, August 2003, version Delineate 3 independent contiguous trenches on a surface of 11 x 4(5) meters each. 2.Remove the new vegetation down to the old brown peat which was earlier exposed (if this applies). 3.Check the ground water level with piezometers: what is the lowest expected level, the highest expected level and the median level? 4.The geometry of the trenches is indicated on the figure below. It is designed so as to have a gentle slope which gives enough space to install the pots. A double line of pots needs about 3 meters along the slope (space for pots, for trampling, etc.). Depending on your ground water dynamics, you will have to adapt the trench geometry, in particular its length, to keep a gentle slope! 5.Level and indicate with sticks the desired level zero. 6.In our case, because of the observed and expected water levels, we had to refill 50 cm peat, at least on the side of the upper part of the slope (it might not be necessary on the opposite side), and therefore we had to dig out relatively few peat. 7.In order to allow for a horizontally mowing ground water level, dig out the trench to the lowest level and refill the slope with porous peat. Otherwise, if the peat in place has a low conductivity, we might end up with a water level parallel to the slope … and no hydrologic gradient! 8.Hoe and crush the peat to obtain an homogeneous and aerated surface along the slope. 9.Under summer conditions (H min), one should see the free water in the lowest part of the trench. 10.Put 2 rows of more than 3 piezometers per trench. Sometimes, the slope might not be perfectly continuous in order to reach the expected water level. 11.We decided not to cover the slope with a textile mat, in order to avoid the release of external decomposing products (later we will have to put wood boards to prevent from trampling). 12.If, because of the ground water dynamics, the trench fills up, put a lateral drain to empty (regulate) the water when the level gets to high (preferably later in order to measure the highest water level).

The trenches in Russey H = max. = old surface peat H = mediane H(water level) = min. = -33 cm Filing up 50 cm Buffer zone of 3.50 cm between trenches Low water level: upper part of the pot 30 cm above the highest H Intermediate water level High water level: upper part of the pot 10 cm above the median H Scale 100% Scale 200% 11 m Peat in place Free water If necessary, put a lateral drain to evacuate the water if the trenches fills up 50 cm 85cm cm Level zero This part has to be filled up with porous peat in order to allow for a horizontally mowing ground water level

Assignment of tubes 10 cm 30 cm 5 cm 15 cm L 1 L 2 L 3 Sp 1 Sp 2Sp 3Sp 0 L 0 Year 1Year 2 Sp 1Sp 2 Sp 3 Sp 1 Sp 2Sp 3Sp 0 Spare species; litter should not be a problem over two years chamber tube Enough space for handling the corer by two persons 1.2 m Slope Water level I Water level II Water level III Total = 15 pots x 3 water levels x 3 replicates = 135 pots, from which only 72 will be analysed! If, in some site we decide not to do the WPIII, than one could allow for 4 keystone species in WP II, which would give 3 trenches x 3 water levels x (5+5+4) = 126 pots, among them 45 to measure during the year (gaz, biometry of plants) We would decide to continue for another year looking at some plant-pots. 3 m 1 out of 3 trenches (= replicates) WP 2: Species WP3: Litter