Rapid Project Identification and Conceptual Design for Green Infrastructure Dan Cloak, P.E.April 8, 2015.

Slides:



Advertisements
Similar presentations
Lec 25: Ch2.(T&LD): Site planning
Advertisements

Project Background and Objectives
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Analette Ochoa, P.E., QSD/P, ToR, WRECO May 22, 2013.
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
Roger Williams Park Ponds Restoration Project. Project Update Concept Plans Developed for Structural and Non- Structural Best Management Practices Draft.
Cost Estimation System Tool
1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Preliminary Design of Galvez Estates Subdivision.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Where are the regulations going? Dan Cloak Environmental Consulting May 23, 2011.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Stormwater Management
Dean Marriott Environmental Services Director Janet Gillaspie Oregon ACWA Executive Director.
Why and How; What’s Working and What Isn’t.  How Low Impact Development can mitigate effects of urban drainage  Applying design criteria for bioretention.
Outfall Reconnaissance Monitoring The why and how of testing direct sources into watersheds … Chris Jones, Richard Dewitt, & Leslie Schick.
Sanitary Engineering Lecture 16
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
Northwest hydraulic consultants 2NDNATURE Geosyntec Consultants September 11, 2007 Urban Upland / Groundwater Source Category Group (UGSCG) Overview Presentation.
Brownfields Odell Zeigler, Katie Dilbeck, Shirley Green, Genarde Garnica.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Dan Cloak, P.E. 18 September 2007 to achieve water quality benefits in Contra Costa County Implementing Low Impact Development.
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Leila Talebi (3/28/2012).  The existing land use of Cincinnati Zoo consists of various types including parking lot, open space areas, and steep wooded.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
Stormwater Treatment and Flow Control Dan Cloak, P.E. Presentation to the San Diego Region Co-permittees Hydromodification Workgroup December 6, 2006 Contra.
Making the Connection Between Water and Land Use Judy Corbett, Executive Director Local Government Commission Smart Growth gets Water-wise.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
Bernie Engel, Larry Theller, James Hunter Purdue University.
38th ½ Street Improvements (between Grayson and Airport) Group 10: Jordan Alvarez Emily Tat Charles Yamashiro.
VOLUME CONTROL using Inter-Event Dry Periods Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye.
Post-Construction Requirements Design Challenges Dan Cloak, P.E.
LEQ: How can I determine watershed patterns and their divides on a map? Lesson Key terms: watershed, drainage basin, tributary, dendritic, elevation,
PCBs and Mercury Source Identification Study Jon Konnan - EOA, Inc. October 15, 2015.
San Diego’s Watershed and and Examination of Land Cover in Relation to Pollution Tamera Ashcraft 30 November 2000.
A Traditional vs. Ecosystem Services Approach to Surface Water Management September 16, 2010 PRESENTED BY Carol Murdock, Clackamas County WES Mark Anderson,
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Complete Streets Training
Caltrans Trash Reduction Workplan. SF Bay Trash Control Requirements Permit Driver  CT Permit Attachment V – SF Bay Region-Specific Requirements Requirements.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
Aaron Cosentino City of Elgin Rob Linke, P.E., CFM Trotter & Associates, Inc. Lord Street Basin CSO Green Infrastructure Retrofit Project November 14,
Transportation System Comments Santolina Level ‘A’ Master Plan.
Christopher Brown, Planner II December 4th, 2014 Case No. 14ZONE1036 La Grange Road Office Louisville Metro Planning Commission Public Hearing.
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
ULI Presentation – Shifting Suburbs OLDE TOWN ARVADA TOD August 29, 2013.
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
San Diego County Dept. of Public Works - Capital Improvements Program (CIP) Tom Hart, PE, QSD/QSP - San Diego County Public Works Hello 10/2/16.
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
WENDELL PARK STORMWATER IMPROVEMENTS
SE 12th Street Roadway Improvements February 8, 2005.
Application for Zoning Amendment
Downtown Streetscape Project Routes 5&20 Corridor Reconfiguration
115-Unit Mixed-Use Project (711 E
Presentation transcript:

Rapid Project Identification and Conceptual Design for Green Infrastructure Dan Cloak, P.E.April 8, 2015

Topics Using Google Maps to identify projects Desktop screening and conceptualization using Street View Project investigation –Utility information –Site reconnaissance and measurements Conceptual design process –Example and preliminary insights 8 Projects: Status and Next Steps

Watershed Scale (Map View) Old Urban –Street Grid Arterial Streets Old Industrial –Near water and rail –Large parcels

Subwatershed Scale (Satellite)

Desktop Screening (Street View)

Utilities

Site Reconnaissance

Conceptual Design

Alum Rock Ave. at Birch Lane 30 x x x x x x 290

Calculations Bioretention at low end30 x 30 =900 Tributary area X 25 =22,500 Alum Rock Avenue385 x 30 =11550 Frontage Street85 x 30 = Total Tributary Area14100 Next upgradient bioretention facility Birch Lane50 x Frontage Street43 x Total Tributary Area37470 Bioretention Area Required37470 x Length along 10-foot-wide median1500/10150

Alum Rock at Pleasant Ridge

Alum Rock At Pleasant Ridge 400 x x x x 500

Alum Rock at Pleasant Ridge

Summary: Alum Rock About 50,000 SF (1.1 acres) arterial roadway Additional 72,000 SF (1.6 acres) residential streets Plus portion of residential lots draining to street 3 bioretention facilities totaling about 5230 SF Need for traffic calming and pedestrian access

Some preliminary insights This is a craft Potential sites are easy to find –But are not available in all areas Subtle differences in elevation determine feasibility and cost Creating changes to surface drainage will be a key part of many projects –Overlays –Removing catch basins –Using trench drains

Eight Projects LocationType 1Alum Rock Ave.Arterial Street/Residential Streets 2Commercial St.Old Industrial Street and Facility Entrance 3Hedding StreetArterial - Disperse runoff to airport approach area 4San Felipe RoadSuburban Arterial 5N. 5 th St.Bioretention facilities in residential parkway strips 6St. James AlleywaysPermeable Pavement and Infiltration Trenches 7South Grant St., San Mateo Curb extensions/bulb outs in mixed-use area 8River Oaks Pump Station Divert dry weather and low flows to bioretention

Format for Work Product Rapid Project Identification & Conceptual Design –Methods and Applicability Section for each of eight projects –Detailed narrative description of design Issues, opportunities, potential conflicts Design considerations. proposed solutions Issues to be resolved in next design stage –Marked-up satellite photos Tributary areas (with dimensions) Facility footprints (with dimensions) Direction of flow, storm drain connections –Calculations for treatment or dispersal area –Site photographs –Concept-level cost estimates