HEIS INSTALLATION PROCESS 1
DEMARCATION IN FIELD 2
POND CONSTRUCTION 3
CONSTRUCTION OF PLATE FORM 4
ERECTION OF HEAD UNIT 5
HEAD UNIT 6
7
SHADE OVER HEAD UNIT 8
INSTALLATION OF FERTIGATION PUMP 9
PIPE LAYING 10
PIPES JOINING 11
PIPE LAID IN TRENCH 12
INSTALLATION OF VALVES 13
DRILLING FOR GROMETS 14
HOLES MADE WITH DRILL 15
PLACING GROMETS 16
COVERING HOLES 17
PUTTING TAKEOFF 18
LATERAL JOINING WITH TAKEOFF 19
LATERAL LAYING 20
END STOP 21
LATERALS LAID IN FIELD 22
PUNCHING OF LATERAL 23
INSTALLATION OF ONLINE DRIPPERS 24
INSTALLED DRIPPER 25
PRESSURE CHECK 26
FARMER TRAINING 27
FARMER TRAINING 28