H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G PIPE EXPRESS ®. New method for environmetally-friendly.

Slides:



Advertisements
Similar presentations
NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
Advertisements

CONSTRUCTION DRILLING INC.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Close Fit Pipe Lining. Overview Close Fit Pipe Lining is an internationally recognised technique which involves inserting a compact pipe or sleeve into.
Drainage Management to Improve Water Quality and Enhanced Agricultural Production Don Pitts Agricultural Engineer NRCS USDA Champaign, IL by.
1 Dredging Phases 4 phases –excavation –lifting –transportation –disposal Guide 4: Machines, Methods and Mitigation; Chapter 2: Phases of a Dredging Project;
Airport planning.
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
WASH Cluster – Emergency Training DR 1 DR3 1 DRAINAGE Session 3 Site Conditions.
Study on Wave calculation of an air cushion surge chamber
Connecticut Department of Energy and Environmental Protection.
TRANS ALASKA PIPELINE 800 mile Trans Alaska Pipeline system (TAPS) stretches from Prudhoe Bay to Valdez in North America Pipeline Transports crude oil.
Basic Coring Device: Components: Head Tube Cable Piston The Head attaches to the top of the tube. The piston is inside the tube and attaches to the cable.
Candor Construction Group & Alternative Energy Associates Presents Geothermal Heating & Cooling
+ Careers in Electricity. + Outcome for today: Outcome EL6.1: Assess personal, societal, economic, and environmental impacts of electricity use in Saskatchewan.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
TRENCHLESS TECHNOLOGY
PROGRESS REVIEW POLANNARUWA Presented By: Eng. Vijayabalan, J. Engineer (RWS) Mannar/Vavuniya Prepared By: Rural Water and Sanitation Unit,
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Field instrumentation Crop and Environmental Sciences Division International Rice Research Institute Los Baños, Philippines.
Department of Civil Engineering,
Gandhinagar Institute of Technology
How Do Californians Get the Water They Need?. California Science Standard 3.e Students know the origin of the water used by their local communities.
World Water Day Presentation By Emma Formosa 5x. Why water is important? Water is important to us, to plants and animals. Without water we will be dehydrated.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Drilling Waste Management Regulation. What is Drilling Waste? produced by any well or pipeline drilling operation contains drilling fluid and drill cuttings.
TRENTON Casing Filler Presentation
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
STRONG PARTNERS FOR SMALL DIAMETERS Process technology for lying a drainage piping under ground water BOHRTEC PROCESS TECHNOLOGY.
Construction Projects in Turkmenistan Ashgabad Drainage – Communication Tunnel
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
PROF. DR. FEVZİ YILMAZ Fatih Sultan Mehmet Vakıf University, Faculty of Engineering, İstanbul ICSG ISTANBUL 2015, APRIL.
Drilling Interlocked O-Pile Walls with DTH + PPV FINLAND.
IMCO’s excavations in the vicinity of Olympic’s pipeline.
Speeds and Feeds. Spindle speeds given in RPM Revolutions Per Minute.
Table 1. Environmental impacts associated with upstream and downstream petroleum operations Aniefiok E. Ite et al. Petroleum Exploration and Production:
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
DIAPHRAGM WALLS.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Ts. Mirtskhulava Water Management Institute of Georgian Technical University THE FIELD STUDY OF THE COMBINE THREE TIER DRAINAGE Givi Gavardashvili Director.
Animal, Plant & Soil Science Animal, Plant & Soil Science E4-9 Drainage.
Hybrid Poplar Demonstration at the Repellier Mine in the Schuylkill River Headwaters Philadelphia Water Department Waste Management & Processors, Inc.
J.PRATHYUSHAG.TEJASRI DEPARTMENT OF CIVIL ENGINEERING.
BY MOHANA.V CIVIL ENGINEERING FINAL YEAR - VII SEM.
Underground Pipelines Module #8 Prepared by Dr. Randy R. Rapp July 2005.
Trenchless Pipeline Crossings
Substructure Groundworks - Hazards
TRADITIONAL ENERGY Key Vocabulary: -Energy -Wood -Oil -Coal Mining
M.E. CONSTRUCTION ENG. & MANAGEMENT
TRENCHLESS TECHNOLOGY
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Asexual Propagation by
Asexual Propagation by
INTRODUCTION TO TRENCHLESS TECHNOLOGY
Written by: Stacy Bodin
ROCK - A NATURALLY FORMED COLLECTION OF DIFFERENT MINERALS MINERAL
TRENCHLESS TECHNOLOGY (TT) IN SMART CITIES
Earths Natural Resources/Minerals/Mining
Numfon Eaktasang ,Ph.D Thammasat University
A PRESENTATION ON “TRENCHLESS TECHNOLOGY” Presented by S.Mounika N.V.Prasad (132U5A0112) (122U1A0157) IIIyr-Civil IIIyr-Civil.
Ground Water Revised 12/16/09.
Govt. Polytechnic,Manesar
Parkland/Brookdale Interceptor Replacement
Point Source vs Nonpoint Source Pollution
ENVIRONMENTAL ASPECT Element of an organization’s activities or products or services that can interact with the environment A significant environmental.
TRENTON Casing Filler Presentation
Ground Water Revised 12/16/09.
Investigation of pipeline failure
SPECIAL ECONOMIC ZONES.
1.5.1 Broad overview of a selected Ecosystem
Presentation transcript:

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G PIPE EXPRESS ®. New method for environmetally-friendly and economic pipeline installation. Herrenknecht AG, May 16, 2013.

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G Open-trench projects with special requirements: Environmentally sensitive areas Swampy areas with high groundwater level Areas with unstable ground conditions Areas with water-bearing layers HERRENKNECHT AG | PIPE EXPRESS.Page 2 PIPE EXPRESS ®. APPLICATION FIELDS. NEAR SURFACE PIPELINE INSTALLATION.

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G Drive length: up to 2,000m Pipeline diameter: 32“- 60“ Overburden:0.5 – 2.5m Advance rates of up to:1.2m/min | 500 – 1,000m/day HERRENKNECHT AG | PIPE EXPRESS.Page 3 PIPE EXPRESS ®. APPLICATION FIELDS. PROJECT CONDITIONS.

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G Operator vehicle Launch pit with Pipe Thruster Excavation unit HERRENKNECHT AG | PIPE EXPRESS.Page 4 PIPE EXPRESS ® TECHNOLOGY. COMPONENTS OF EQUIPMENT.

H E R R E N K N E C H T A G | U T I L I T Y T U N N E L L I N G | T R A F F I C T U N N E L L I N G HERRENKNECHT AG | PIPE EXPRESS.Page 5 Working under groundwater, no lowering of ground water table Simultaneous trenching and pipe laying Minimum impact on flora and fauna No components & cutting transport inside the pipeline No drilling fluid for transport of cuttings -> no separation plant necessary Less pipe-laying equipment needed on jobsite PIPE EXPRESS ® TECHNOLOGY. THE BENEFITS.