Hargrave Street Pumpstation – Site Preparation July 2014.

Slides:



Advertisements
Similar presentations
As one of the first steps in the retrofitting process, workers removed the existing concrete floor.
Advertisements

Neo Hungary Kft. Project: Construction of the Production Facility in ISD Dunaferr, Dunaújváros, Hungary Beginning of the construction: June 2010 Finish.
Berwickshire High School Presentation compiled 15 th October 2009.
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
Foundation Systems.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering WFP Slideshow Photos from Water For People Projects Courtesy of Jody Camp Photos from.
Chicas, este calendario si es pa' nosotras !!!!!.
NCSX NCSX DCT Project Meeting Raki Slide 1 Electrical Power Systems (WBS 4) S. Ramakrishnan NCSX PROJECT – D TO C Site DC Transmission PROJECT MANAGEMENT.
John Osborne GS/SE March 2013
Eco-$mart, Inc Pre-panelized, steel reinforced, super insulated, poured concrete wall system.
Problem: surface ponding. Solution: surface or subsurface drainage.
Lakes Creek Road Waste Transfer Station Construction highlights.
CAISSON FOUNDATION.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Community of Aspendell (Elev. 8400) Bishop Creek Area, Inyo County, CA MAIN PROJECT OBJECTIVES Replace existing sewer pipe and install new PVC sewer pipe.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Wates CBE Learning Build: Plant interactive.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
FACET Exp Area Christine Clarke 3 rd October 2013.
Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Joints for Diaphragm Walls
Foundation Loads Dead Load Live Load Wind Load
Route 1 Olden Avenue & Mulberry Street Hyperbuild Project.
1 TT10 Remedial works What is happening. 2 Compression failure in crown (some cases) Tension/Shear failure in shoulders (typical) Compression Tension.
Xenon Detector Installation schedule Satoshi MIHARA.
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
BUILDING CONSTRUCTION
CAISSON FOUNDATION.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
WBS Experiment Infrastructure: LArTF GPP Project Status Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 11/02/12.
Construction Methodology for Suramadu Main Bridge.
Underground Pipelines Module #8 Prepared by Dr. Randy R. Rapp July 2005.
Plaistow BOS Meeting 7/24/2017
SX1 manipulation VERSION 1 Version
The LHCb Installation Story
Designing a Commercial Shopping Center
A. Datum Corporation Bid package overview
Perforated Casing Pipe. Stainless Steel Perforated Casing.
A. Datum Corp. Bid package overview.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Organics Waste Processing Facility Construction Progress Update December 15, 2010
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Pier Foundations Piers Suspended floor Ground beam Next slide.
McDonald’s Kalender 2009.
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Problem Gambling Clicks to Opgr.org
Customer Care Center Root Cause Analysis
McDonald’s calendar 2007.
Teacher name August phone: Enter text here.
Tropical cyclones movement
February 2007 Note: Source:.
Two-beam Test-stand Design and Construction Status
McDonald’s calendar 2007.
One Coil Gun Magnet February 2, 2016.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Hargrave Street Pumpstation – Site Preparation July 2014

Hargrave Street Pumpstation – Pile breaking August 2014

Hargrave Street Pumpstation – Piling August 2014

Hargrave Street Pumpstation – Pile breaking August 2014

Hargrave Street Pumpstation – Pile Breaking August 2014

Hargrave Street Pumpstation – Guide Trench Removal August 2014

Hargrav e Street Pumpstat ion – Steel fixing to pilecap beam Septemb er 2014

Hargrave Street Pumpstation – Pilecap Beam Concrete Pour September 2014

Hargrave Street Pumpstation – Pilecap Beam Concrete Pour September 2014

Hargrave Street Pumpstation – Pilecap Beam Formwork September 2014

Hargrave Street Pumpstation – Pump Chamber Excavation September 2014

Hargrave Street Pumpstation – Pump Chamber Excavation September 2014

Hargrave Street Pumpstation – Pump Chamber Excavation September 2014

Hargrave Street Pumpstation – Pump Chamber Excavation october 2014

Hargrave Street Pumpstation – Steel outlet pipe installation October 2014

Hargrave Street Pumpstation – Steel outlet pipe installation October 2014

Hargrave Street Pumpstation – Pump Chamber Excavation October 2014

Hargrave Street Pumpstation – Pump Chamber Excavation October 2014

Hargrave Street Pumpstation – Pump Chamber Excavation October 2014

Hargrave Street Pumpstation – Steel outlet pipe installation October 2014

Hargrave Street Pumpstation – Steel outlet pipe installation October 2014