doc.: IEEE /863r0 Submission June WG Slide 1 Liaison presentation to SC6 regarding IEEE m(b) Date: Authors:
doc.: IEEE /863r0 Submission June WG Agenda Overview of TGmb project Overview of amendment and revision status Revision Requirements Interpretation Requests Next steps References Slide 2
doc.: IEEE /863r0 Submission June WG IEEE mb Project Overview Revision to IEEE Standard Project is to incorporate –accumulated maintenance changes (editorial and technical corrections) into , and –roll up of approved amendments into the standard Project Authorization (4 years) –approved 10 Dec 2008 expires 31 Dec 2012 Slide 3
doc.: IEEE /863r0 Submission June WG IEEE Standards Process – Revision Requirements The Sponsor (IEEE 802) shall initiate revision of a standard –whenever any of the material in the standard (including all amendments, corrigenda, etc.) becomes obsolete or incorrect, or –if three or more amendments to a base standard exist three years after its approval or most recent reaffirmation The Sponsor may initiate revision of a standard –when new material becomes available and normal evaluation of need and feasibility indicates revision is warranted The procedure for revising a standard is the same as for developing a new standard A revision shall encompass the cumulative scope of the project (including all approved amendments and corrigenda) Reference: Slide 4
doc.: IEEE /863r0 Submission June WG IEEE mb Project Overview IEEE Draft P REVmb™ is the Revision of IEEE Std ™-2007 as amended by – IEEE Std k™-2008, Radio Resource Measurement of Wireless LANs –IEEE Std r™-2008, Fast BSS Transition –IEEE Std y™-2008, 3650 to 3700 MHz Operation in USA (Contention Based Protocol) –IEEE Std w™-2009, Protected Management Frames –IEEE Std n™-2009, Enhancements for Higher Throughput –IEEE Std p™-2010, Wireless Access in Vehicular Environments –IEEE Std z™-2010, Extensions to Direct-Link Setup (DLS) –IEEE Std v™-2011, Wireless Network Management –IEEE Std u™-2011, Interworking with External Networks, and –802.11s (Mesh Networking ) prior to publication Publication expected early 2012 Slide 5
doc.: IEEE /863r0 Submission June WGSlide 6 IEEE Revisions k RRM r Fast Roam a 54 Mbps 5GHz b 11 Mbps 2.4GHz d Intl roaming v Network Management s Mesh u WIEN y MHz Contention Based Protocol n High Throughput (>100 Mbps) w Management Frame Security z TDLS p WAVE mb Revision PHY MAC aa Video Transport ae QoS Mgt Frames ah <1GHz ac Very High Throughput 5GHz ai FILS ad Very High Throughput 60GHz af TV Whitespace g 54 Mbps 2.4GHz e QoS i Security h DFS & TPC j JP bands
doc.: IEEE /863r0 Submission June WG IEEE Standards Pipeline PHY Sponsor Ballot MAC Study groups k RRM r Fast Roam (’99) 2.4GHz Published Standard g 54 Mbps 2.4GHz e QoS i Security h DFS & TPC V Network Management s Mesh u WIEN Y Contention Based Protocol WG Letter Ballot aa Video Transport ac VHT 5GHz ad VHT 60GHz TG without draft Discussion Topics Published Amendment ae QoS Mgmt Frm n High Throughput (>100 Mbps) W Management Frame Security z TDLS p WAVE af TVWS Smart Grid ai Fast Initial Link Setup ah Sub 1GHz mb Revision WNG j JP bands a 54 Mbps 5GHz b 11Mbps 2.4 GHz d Slide 7
doc.: IEEE /863r0 Submission June WG Interpretation Request Requirements IEEE is responsible for responding to any received interpretation requests IEEE mb generates proposed interpretation responses Reference: Reference: Slide 8
doc.: IEEE /863r0 Submission June WG Next steps after publication of IEEE Standard Forward Standard to ISO/IEC for ratification –Plan to use PSDO Process, as previously indicated in 6N14152 Approval of a new revision PAR (P802.11) – likely early 2013 –Revision PAR, required after 3 additional amendments are published mc is the expected internal naming during the revision process –Address interpretation requests –Address accumulated maintenance changes –Roll-up of published amendments Slide 9
doc.: IEEE /863r0 Submission June WG References IEEE Standards Board Operations Manual, see – Available interpretations, see – Slide 10