1 ANSI/ANS-3.11-2005 American National Standard for Determining Meteorological Information at Nuclear Facilities R. Brad Harvey, CCM Physical Scientist.

Slides:



Advertisements
Similar presentations
21M062007D The Shaw Group Inc. ® An Analytical Screening Technique to Estimate the Effect of Cooling Ponds on Meteorological Measurements – A Case Study.
Advertisements

CURRENT METEOROLOGICAL HAPPENINGS THE SITING AND ACCIDENT CONSEQUENCES BRANCH DIVISION OF SITE AND ENVIRONMENTAL REVIEWS OFFICE OF NEW REACTORS Brad Harvey,
Determining a Backup Source of Meteorological Data for Dispersion Characteristics (Wind and Stability) Mark T. Carroll Heather A. McDonald Andrew J. Lotz.
Case Study: Impact of Above Ground Spent Fuel Storage on Nearby Meteorological Systems Jim Holian SAIC NUMUG Meeting Charlotte, NC June 2008.
THE OKLAHOMA MESONET: EVOLUTION FROM REAL-TIME WEATHER NETWORK TO CLIMATE NETWORK Christopher Fiebrich and Kevin A. Kloesel Oklahoma Climatological Survey.
11th NUMUG Meeting - St. Louis 10/13/061 Preliminary Dispersion Modeling for the NuStart Plant at Bellefonte Doyle E. Pittman and Kenneth G. Wastrack Tennessee.
Temporal Comparison of Atmospheric Stability Classification Methods
01/14/2001Temperature and Humidity1 Temperature and Humidity Paul M. Fransioli, CCM AMS Short Course on Introduction to Measurements and Observation Techniques.
Meteorological Monitoring System Surveys Past, Present, and Future Kenneth G. Wastrack Tennessee Valley Authority & John Ciolek AlphaTRAC, Inc. 1Met Monitoring.
Meteorological Data Issues for Class II Increment Analysis.
Weather and X/Q 1 Impact Of Weather Changes On TVA Nuclear Plant Chi/Q (  /Q) Kenneth G. Wastrack Doyle E. Pittman Jennifer M. Call Tennessee Valley Authority.
Sonic vs. Cup/Vane Data Comparison at the Cooper Nuclear Station Jim Holian SAIC Jim Holian SAIC NUMUG Meeting St. Louis, MO October 2006 NUMUG Meeting.
The ANSI/ANS 2.15 Standard for Modeling Routine Radiological Releases from Nuclear Facilities John Ciolek AlphaTRAC, Inc.
Using ARCON96 for Control Room Radiological Habitability Assessments
Meteorological Measurement Error Analysis based on ANSI/ANS-3.11 (2005) Kenneth G. Wastrack Tennessee Valley Authority NUMUG 2005.
CEREA – Group « Meteorological Measurements » 15 September METEOROLOGICAL MEASUREMENTS IN THE ATMOSPHERIC BOUNDARY LAYER E. Dupont – D. Demengel.
Rapid Update Cycle Model William Sachman and Steven Earle ESC452 - Spring 2006.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
George C. Howroyd, Ph.D., P.E. CH2M HILL Paul B. Snead, R.E.M.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques Wind Measurements Short Course on Introduction to Meteorological.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Strategies for the Selection of Substitute Meteorological Data Ken Sejkora Entergy Nuclear Northeast – Pilgrim Station Presented at the 14 th Annual RETS-REMP.
NUMUG Survey (Second Edition) Kenneth Wastrack Tennessee Valley Authority.
01/14/2001Standards1 Introduction to Standards Paul M. Fransioli, CCM AMS Short Course on Introduction to Measurements and Observation Techniques January.
Identifying Non-Linear Flow for Modeling of Routine Releases from TVA Nuclear Facilities Toree M. Cook Kenneth G. Wastrack Doyle E. Pittman Tennessee Valley.
European Metrology Research Program (EMRP) MeteoMet Project (October 2011) WP3. Traceable measurements methods and protocols for ground based meteorological.
Tower SystemsJanuary AMS Short Course on Instrumentation 1 Installation and Use of Meteorological Tower Systems Melanie A. Wetzel Desert Research.
NRC Endorsement of Standards
Investigation of Meteorological Tower Siting Criteria Ken Sejkora Entergy Nuclear Northeast – Pilgrim Station Presented at the 15 th Annual RETS-REMP Workshop.
Proposed revision of ITU-R Recommendation providing EESS (active) Performance and Interference Criteria May 13, 2015 Committee On Radio Frequencies Thomas.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
DMCC AV Program2006 NUMUG Meeting DOE METEOROLOGICAL COORDINATING COUNCIL (DMCC) ASSIST VISIT PROGRAM 2006 NUMUG Meeting St. Louis, MO October 12, 2006.
A NEW STANDARD IN METEOROLOGICAL MONITORING SYSTEMS INSTALLED AT THE PERRY NUCLEAR POWER PLANT Jim Holian (SAIC) and Jamie Balstad (First Energy Corp)
ESP / COL Applications Meteorological Data Requirements and Regulatory Conformance Issues Ping Wan Bechtel Power Corporation The Eleventh Nuclear Utility.
13 th Nuclear Utility Meteorological Data Users Group Meeting Lessons Learned From Establishing Design- and Operating-Basis Regional Meteorological Conditions.
NUMUG History & Survey 1 History and Accomplishments of NUMUG Kenneth G. Wastrack Tennessee Valley Authority Presented at the 11 th NUMUG Meeting St. Louis,
© TAFE MECAT 2008 Chapter 6(b) Where & how we take measurements.
Meteorological Program Self Assessment Presented at NUMUG San Francisco, CA 2009.
NRC Materials Program Cyber Security Organization of Agreement States Annual Meeting August 2015 Adelaide Giantelli Office of Nuclear Material Safety and.
BFN Sigmas1 EVALUATING METEOROLOGICAL MONITORING SITES USING SIGMA-THETA Kenneth G. Wastrack Doyle E. Pittman T ENNESSEE V ALLEY A UTHORITY.
ANSI/ANS-3.11 Determining Meteorological Information at Nuclear Facilities Stanley L. Marsh, CCM, Southern California Edison 8th NUMUG Meeting St. Charles,
2011 National Air Quality Conferences March , 2011 Development of the USEPA Quality Assurance Guidance for the Collection of Meteorological Data.
Ping Zhu, AHC5 234, Office Hours: M/W/F 10AM - 12 PM, or by appointment M/W/F,
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
Comparison of the AEOLUS3 Atmospheric Dispersion Computer Code with NRC Codes PAVAN and XOQDOQ 13th NUMUG Conference, October 2009, San Francisco, CA.
Environmental Business Council December 17, 2009
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
Quality management, calibration, testing and comparison of instruments and observing systems M. Leroy, CIMO ET on SBII&CM.
1 Review of Specifications for Digital Upgrades NHUG Summer Meeting July 17, 2008 Tim Mitchell Component Engineering Palo Verde Nuclear Generating Station.
Evapotranspiration Estimates over Canada based on Observed, GR2 and NARR forcings Korolevich, V., Fernandes, R., Wang, S., Simic, A., Gong, F. Natural.
ANSI/ANS-3.11(2000) Determining Meteorological Information at Nuclear Facilities Update Stanley L. Marsh, CCM Southern California Edison Carl Mazzola,
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
NUMUG - Oct Atmospheric Stability – Methods & Measurements Robert F. Yewdall PSEG Nuclear LLC.
A Dual Elevator Meteorological System at the Cooper Nuclear Station Jim Holian/Russ Southerland SAIC June 2005 NUMUG Meeting.
Instruments. In Situ In situ instruments measure what is occurring in their immediate proximity. E.g., a thermometer or a wind vane. Remote sensing uses.
Quality Assurance National Nuclear Standards C. H. Moseley, Jr. 33 rd National Energy & Environmental Conference August 28, 2006.
Stephen A. Vigeant: Shaw E&I Carl A. Mazzola: Shaw E&I H. Wesley Nance: Washington TRU Solutions Consideration of Micrometeorological Trends Consideration.
New & Improved Meteorological Data Archives Kenneth G. Wastrack Jennifer M. Call D. Sherea Burns Tennessee Valley Authority.
May 2002[NUMUG] Listening to the Wind1 of 17 LISTENING TO THE WIND TVA Experience with Installation and Operation of Ultrasonic Wind Sensors Kenneth G.
ANSI/ANS-3.11(2005) Determining Meteorological Information at Nuclear Facilities Update Kenneth Wastrack Tennessee Valley Authority 10th NUMUG Meeting.
Recent Developments Regarding Control Room Habitability Assessment
Some Thoughts about Meteorological Monitoring Program Reviews
Prescriptive vs Performance-Based Regulatory Approaches
Calculation and Re-calculation of 60-minute Sigma Theta and Stability
The Role of Meteorology in the Nuclear Power Industry
Handbook on Meteorological Observations
TRTR Briefing September 2013
XOQDOQ Calculation Method, Tools and Pitfalls
NATS 101 Lecture 3 Climate and Weather
NATS 101 Lecture 3 Climate and Weather
Presentation transcript:

1 ANSI/ANS American National Standard for Determining Meteorological Information at Nuclear Facilities R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission

2 Presentation Topics History of U.S. NRC Meteorological Monitoring Guidance History of U.S. NRC Meteorological Monitoring Guidance ANS/ANSI ANS/ANSI Potential Updates to U.S. NRC Meteorological Monitoring Guidance Potential Updates to U.S. NRC Meteorological Monitoring Guidance –3 rd Proposed Revision 1 to RG 1.23

3 Safety Guide 23 (RG 1.23) Issued in Feb 1972 Issued in Feb 1972 Guidance Topics Guidance Topics –Parameters Minimum 2 levels of wind speed, wind direction, temp Minimum 2 levels of wind speed, wind direction, temp Dew point or humidity where there is an potential for increased fogging/icing Dew point or humidity where there is an potential for increased fogging/icing –Siting Tower at same elevation as plant Tower at same elevation as plant Avoid influence of nearby structures Avoid influence of nearby structures Measurements at Measurements at –10m –Vent release height –Stack height (if applicable)

4 Safety Guide 23 (RG 1.23) Guidance Topics (cont’d) Guidance Topics (cont’d) –Data recording Dual recorders (2 digital or 1 analog/1 digital) Dual recorders (2 digital or 1 analog/1 digital) –Instrument Accuracy Wind direction: ±5° (instantaneous values) Wind direction: ±5° (instantaneous values) Wind speed: ±5mph (time average) Wind speed: ±5mph (time average) Temperature: ±0.5°C (time average) Temperature: ±0.5°C (time average) Delta-temperature: ±0.1°C (time average) Delta-temperature: ±0.1°C (time average) Dew point: ±0.5°C (time average) Dew point: ±0.5°C (time average)

5 Safety Guide 23 (RG 1.23) Guidance Topics (cont’d) Guidance Topics (cont’d) –Maintenance and Servicing 90% data recovery goal 90% data recovery goal Semiannual calibrations Semiannual calibrations –Data reduction and compilation Data averaged over 15–60 min Data averaged over 15–60 min Compiled into annual Joint Frequency Distributions Compiled into annual Joint Frequency Distributions Stability based on delta- T or sigma-theta Stability based on delta- T or sigma-theta

6 Safety Guide 23 (RG 1.23) Guidance Topics (cont’d) Guidance Topics (cont’d) –Special Considerations Additional monitoring in complex terrain Additional monitoring in complex terrain Precipitation and Solar Radiation may be desirable Precipitation and Solar Radiation may be desirable –Documentation Describe program in FSAR Describe program in FSAR

7 (1 st ) Proposed Rev. 1 to RG 1.23 Issued in Sept 1980 (post-TMI) Issued in Sept 1980 (post-TMI) Additional Guidance Additional Guidance –Siting Avoiding structure influences Avoiding structure influences Instrument boom length/orientation Instrument boom length/orientation Aspirated temperature shields Aspirated temperature shields 10m & 60m measurement heights, higher for stacks 10m & 60m measurement heights, higher for stacks Additional monitoring for coastal & valley sites Additional monitoring for coastal & valley sites

8 (1 st ) Proposed Rev. 1 to RG 1.23 Additional Guidance (cont’d) Additional Guidance (cont’d) –Data Recording Sampling rates Sampling rates CR/TSC/EOF displays CR/TSC/EOF displays –System Accuracy –Data Reduction & Compilation Hourly averages Hourly averages Hourly database submittal Hourly database submittal –Quality Assurance 10 CFR Part 50 Appendix B 10 CFR Part 50 Appendix B

9 (1 st ) Proposed Rev. 1 to RG 1.23 Additional Guidance (cont’d) Additional Guidance (cont’d) –Special Considerations for Emergency Preparedness Independent 10m backup tower Independent 10m backup tower Remote interrogation Remote interrogation

10 ANSI/ANS Approved in September 1984 Approved in September 1984 Many aspects in common with Proposed Rev. 1 to RG 1.23 Many aspects in common with Proposed Rev. 1 to RG 1.23 –Did not include “Special Considerations for Emergency Preparedness” No references to 10m backup tower or remote interrogation No references to 10m backup tower or remote interrogation Reaffirmed in 1990; withdrawn in 2000 Reaffirmed in 1990; withdrawn in 2000

11 2 nd Proposed Rev. 1 to RG 1.23 Issued in April 1986 Issued in April 1986 Endorsed ANSI/ANS Endorsed ANSI/ANS –Took exception to ANSI/ANS QA program guidance

12 ANSI/ANS Approved in February 2000 Approved in February 2000 Expanded Applicability to Nuclear Facilities in Public Sector (e.g. National Labs) Expanded Applicability to Nuclear Facilities in Public Sector (e.g. National Labs) Cooperative Effort Cooperative Effort –NUMUG –DMCC Moved ANS Subcommittees Moved ANS Subcommittees –From:ANS-2 Site Evaluation –To:ANS-3 Reactor Operations

13 ANSI/ANS Guidance Topics Guidance Topics –Meteorological Measurements –Siting of Meteorological Instrumentation –Data Acquisition –Data Base Management –System Performance –Appendixes (for information only)

14 ANSI/ANS Approved by ANS December 2005 Approved by ANS December 2005 –Awaiting approval by ANSI before publishing Updates/Enhancements Updates/Enhancements –System calibration methods –System accuracy calculations –Editorial and clarity changes

15 ANSI/ANS Meteorological Monitoring System Meteorological Monitoring System –Basic Meteorological Measurements Wind speed, wind direction, temp, precip Wind speed, wind direction, temp, precip –Supplemental Meteorological Measurements Moisture, solar/net radiation, pressure, mixing height, etc. Moisture, solar/net radiation, pressure, mixing height, etc. –Remote Sensing Technologies Sodar, radar wind profilers, NEXRAD, satellite data, etc. Sodar, radar wind profilers, NEXRAD, satellite data, etc. –Sources of Other Surface Observations –Meteorological Observation Towers –Stability Class Determination Delta-T, sigma theta, sigma phi, Monin-Obukhov length, etc. Delta-T, sigma theta, sigma phi, Monin-Obukhov length, etc.

16 ANSI/ANS Instrument Siting Instrument Siting –Topographic Effects Flat terrain, mountain, and shoreline sites Flat terrain, mountain, and shoreline sites –Instrument Orientation Aerodynamic effects of obstacles, diabatic effects Aerodynamic effects of obstacles, diabatic effects –Optional Site Selection Techniques Remote sensing, tracer studies, numerical modeling, physical modeling, etc. Remote sensing, tracer studies, numerical modeling, physical modeling, etc.

17 ANSI/ANS Data Acquisition Data Acquisition –Recording Mechanisms Primary system: digital Primary system: digital Optional backup system: analog or digital Optional backup system: analog or digital –Sampling Frequencies Averaging: At least 30 samples at intervals no longer than 60 sec spaced over not less than 10 min period Averaging: At least 30 samples at intervals no longer than 60 sec spaced over not less than 10 min period Standard Deviation: more frequent sampling Standard Deviation: more frequent sampling –Data Processing min averages for display in CR/TSC/EOF min averages for display in CR/TSC/EOF Hourly averages for climatic and dispersion analyses Hourly averages for climatic and dispersion analyses

18 ANSI/ANS Data Base Management Data Base Management –Representative Site Data Bases 3-5 yrs of onsite data for dispersion calculations 3-5 yrs of onsite data for dispersion calculations –Data Validation Techniques Compare to expected range of values, redundant sensors, other tower levels, other data sources, etc. Compare to expected range of values, redundant sensors, other tower levels, other data sources, etc. –Data Substitution From redundant sensors, other tower levels (adjusted for change in height), linear interpolation for short periods of missing data, etc. From redundant sensors, other tower levels (adjusted for change in height), linear interpolation for short periods of missing data, etc.

19 ANSI/ANS Data Base Management (cont’d) Data Base Management (cont’d) –Data Recovery Rates 90% annually, individual channels and composite WS/WD/DT joint frequency distributions 90% annually, individual channels and composite WS/WD/DT joint frequency distributions –Data Archiving Retain raw data for 5 years, valid hourly data for life of facility Retain raw data for 5 years, valid hourly data for life of facility –Data Reporting Annual joint frequency distributions Annual joint frequency distributions

20 ANSI/ANS System Performance System Performance –System Accuracy Wind Speed: ±0.2 m/s or 5% of observed; Wind Speed: ±0.2 m/s or 5% of observed; Wind Direction: ±5° Wind Direction: ±5° Temperature: ±0.5°C Temperature: ±0.5°C Delta-T: ±0.1°C Delta-T: ±0.1°C Dew Point: ±1.5°C Dew Point: ±1.5°C Time ±5 min Time ±5 min Etc. Etc.

21 ANSI/ANS System Performance (cont’d) System Performance (cont’d) –System Calibrations Encompass entire channel (from sensor to display/recorder) Encompass entire channel (from sensor to display/recorder) Preoperational and 6-month intervals thereafter Preoperational and 6-month intervals thereafter Document “as-found” and “as-left” results Document “as-found” and “as-left” results Field versus laboratory calibrations Field versus laboratory calibrations –System Protection, Maintenance & Service Protect against electrical faults, severe environmental conditions, etc. Protect against electrical faults, severe environmental conditions, etc. –Quality Assurance and Documentation

22 ANSI/ANS Appendixes (for information only) Appendixes (for information only) –Supplemental Measurements –Tower Siting in Complex Terrain –Stability Class Determination –Optional Site Selection Techniques –Wind Computations –Calibration Practices

23 3 rd Proposed Rev. 1 to RG 1.23 Part of ongoing overall effort to update regulatory guidance to support expected new reactor applications Part of ongoing overall effort to update regulatory guidance to support expected new reactor applications May include consideration of guidance provided in ANSI/ANS May include consideration of guidance provided in ANSI/ANS –Tower and instrument siting criteria –System accuracy –Data processing, recording, and displays