FINITE ELEMENT ANALYSIS OF SEISMIC INDUCED DEFORMATION OF BREAKWATER The CRISP Consortium Ltd/South Bank University London 15th CRISP User Group Meeting.

Slides:



Advertisements
Similar presentations
1 MAJOR FINDINGS OF THE PROJECT AND THEIR POSSIBLE INCLUSION IN EUROPEAN STANDARD -Major findings -Major findings suitable for inclusion in European Standard.
Advertisements

Numerical analysis of the effect of preloading on the seismic risk of buildings on liquefaction-susceptible sites F. Lopez-Caballero, A. Modaressi and.
Educational Resource Library
JP Singh and Associates in association with Mohamed Ashour, Ph.D., P.E. Gary Norris, Ph.D., P.E. March 2004 COMPUTER PROGRAM S-SHAFT FOR LATERALLY LOADED.
Liquefaction, Kobe Earthquake Matt Greaves, Tom Baker.
Geological response to Mexico, 1985 Bruce Ashcroft And Amanda Chapman.
GEO-MECHANICS (CE2204) Soil Stress and Pore Water Pressure
10. In-Situ Stress (Das, Chapter 9)
Impacts of Seismic Stress on Pore Water Pressure in Clayey Soil By: Qazi Umar Farooq Lecturer Civil Engineering Dept Univ of Engg & Tech Taxila.
Chapter (1) Geotechnical Properties of Soil
Advanced Site Monitoring and Characterization of Site Dynamic Properties Mourad Zeghal, Tarek Abdoun and Vicente Mercado Department of Civil and Envir.
Features of POLLUSOL Flow model Flow model Homogeneous, Isotropic, Heterogeneous and Anisotropic medium Homogeneous, Isotropic, Heterogeneous and Anisotropic.
Earthquake induced LIQUEFACTION by Jimmy McLauchlan Peat Nicholas Case study: Mexico City, 1985.
Time-dependent increase in CPT tip resistance following explosive compaction. Time-dependent increase in V s following explosive compaction, as measured.
ANALYSES OF STABILITY OF CAISSON BREAKWATERS ON RUBBLE FOUNDATION EXPOSED TO IMPULSIVE WAVE LOADS Burcharth, Andersen & Lykke Andersen ICCE 2008, Hamburg,
Lecture 8 Elements of Soil Mechanics
Modeling of CNT based composites: Numerical Issues
Advanced Simulation of Gas Meter Components Muhammad Arsalan Farooq University of Heidelberg, Heidelberg, Germany.
Finite Element Method in Geotechnical Engineering
CE 486 DEEP COMPACTION Name : Ali Hamood Al-teeb. ID :
GEOTECHNICAL PROPERTIES (CE1203)
GEO-MECHANICS (CE2204) Shear Strength of Soils
Direct Shear Test CEP 701 PG Lab.
Introduction to virtual engineering László Horváth Budapest Tech John von Neumann Faculty of Informatics Institute of Intelligent Engineering.
8. Permeability (Das, chapter 7)
UNIFORM FLOW AND DESIGN OF CHANNELS
Objectives Identify the conditions of simple harmonic motion.
Liquefaction Analysis For a Single Piled Foundation By Dr. Lu Chihwei Moh and Associates, Inc. Date: 11/3/2003.
Tunnel Engineering for Indian Railways
1 Interpretation and Visualization of Model Test Data for Slope Failure in Liquefying Soil Bruce L. Kutter Erik J. Malvick R. Kulasingam Ross Boulanger.
Department of Civil Engineering,
14th Crisp user meeting at UCL1 Numerical analysis of a piled foundation in granular material using slip element Yongjoo Lee Soil Mechanics Group Department.
1. 2 CE-312 Engineering Geology and Seismology Instructor: Dr Amjad Naseer Lecture#15 Department of Civil Engineering N-W.F.P University of Engineering.
Section 1 Simple Harmonic Motion
Daily Challenge, 10/2 Give 3 examples of motions that are periodic, or repeating.
AMML Effect of rise, peak and fall characteristics of CZM in predicting fracture processes.
Dynamic Behaviour of Unsaturated CH soil under Cyclic Loading in Unconsolidated Undrained Conditions 5th Tongji-UBC Symposium on Earthquake Engineering,
Chapter 11 Preview Objectives Hooke’s Law Sample Problem
Liquefaction Liquefaction occurs where ground water is near the surface in soils composed of sands and silts. The soil temporarily loses strength and behaves.
Illustration of FE algorithm on the example of 1D problem Problem: Stress and displacement analysis of a one-dimensional bar, loaded only by its own weight,
Limit Load Analysis of suction anchors for cohesive materials By Dr Amir Rahim The CRISP Consortium Ltd/South Bank University 14 th CRISP User Group Meeting.
SOME NOTES ON MORPHODYNAMIC MODELING OF VENICE LAGOON Gary Parker, Spring, 2004 Venice Lagoon was formed by the action of deposition of mud and sand from.
Section Review 12-1 Page #300: #1 Describe elastic rebound. The sudden return of deformed rock back.
Chapter 11 Preview Objectives Hooke’s Law Sample Problem
Two loading Conditions
High Rise Design High Rise Design (Notes prepared by A. Hira – modified by N. Haritos) Department of Civil and Environmental Engineering, The University.
Consolidation By Attila Bukholcz, Michael Tse, Tong Haibin.
Soil Stress and Pore Water Pressure
PILE FOUNDATIONS UNIT IV.
Lecture 8 Elements of Soil Mechanics
BUILDING CONSTRUCTION ( ). 1. BHOL SUFIYAN [ ] 2. CHAVDA KRUNAL [ ] YEAR: 2 ND SEM: 3 RD CIVIL ENGINEERING DEPARTMENT PRESENTED.
Liquefaction Mitigation using GeoComposite Vertical Drains
Lecturer: Dr. Frederick Owusu-Nimo
Direct Shear Test.
Presentation Overview
FE: Geotechnical Engineering
Section 1 Simple Harmonic Motion
Finite Element Method in Geotechnical Engineering
EAG 345 – GEOTECHNICAL ANALYSIS
DARSHAN INSTITUTE OF ENGINEERING & TECHNOLOGY
For updated version, please click on
Ground improvement techniques
POSTPROCESSING Review analysis results and evaluate the performance
Consolidation Theories of Soils
Stress-strain behaviour
on soft clay using finite element method Road & Highway Engineering
WHAT IS LIQUEFACTION.
EAG 345 – GEOTECHNICAL ANALYSIS
Earthquake resistant buildings
lectures Notes on: Soil Mechanics
Presentation transcript:

FINITE ELEMENT ANALYSIS OF SEISMIC INDUCED DEFORMATION OF BREAKWATER The CRISP Consortium Ltd/South Bank University London 15th CRISP User Group Meeting Thursday 19 th September 2002 UNIVERSITYCOLLEGE LONDON DEPARTMENT OF CIVIL & ENVIRONMENTAL ENGINEERING In association with

This FE study was carried out for Mouchel Consulting Ltd by Amir Rahim and Andrew Chan. Software used is CRISP and SWANDYNE II This FE study was carried out for Mouchel Consulting Ltd by Amir Rahim and Andrew Chan. Software used is CRISP and SWANDYNE II

A breakwater is to be constructed in an area where earthquake is likely to occur. A breakwater is to be constructed in an area where earthquake is likely to occur. The breakwater core consists of sand which is dredged from seabed The breakwater core consists of sand which is dredged from seabed The breakwater lies above a layer of sand varying from few meters up to about 20m. The in-situ sand overlays bedrock The breakwater lies above a layer of sand varying from few meters up to about 20m. The in-situ sand overlays bedrock

Criteria for liquefaction We check for liquefaction by checking whether excess pore pressure has reached vertical effective stress for a period of time after the end of the earthquake We check for liquefaction by checking whether excess pore pressure has reached vertical effective stress for a period of time after the end of the earthquake

Coast Section 7-7 Section 9-9 Port side Sea side Round head L2 U9 U12 U5 Plan of Breakwater

Earthquake Record used El-Centro earthquake (May 1940, Southern California). This was factored to a maximum acceleration or 0.3g.

Sand Breakwater (rock) Accropode 22 m 20 m Bed rock 25 m Section 9-9 at the roundhead

FE Mesh for Breakwater

Material Properties Mg is slope of critical state line and is found by using Phi Mg is slope of critical state line and is found by using Phi Mf, controls unloading modulus. We use the relationship which is based on the Relative Density. Mf=Mg x Dr Mf, controls unloading modulus. We use the relationship which is based on the Relative Density. Mf=Mg x Dr Other parameters are chosen for typical loose sand as detailed in the book by Zienkiewicz, Chan, Pastor and Shiomi Other parameters are chosen for typical loose sand as detailed in the book by Zienkiewicz, Chan, Pastor and Shiomi The armour materials were considered to be elastic with the following properties E= KPav=0.15 E= KPav=0.15 The permeability coefficient for the breakwater core material was initially taken as 5x10-5 m/s. The permeability coefficient for the breakwater core material was initially taken as 5x10-5 m/s.

Test 1 FE results with following properties: Dr=35% for breakwater sand For rock armour E= KPav=0.15 For breakwater sand k= 5x10 -5 m/s.

Excess pore pressure at various nodes in section 9-9 for duration of quake of 53 seconds and further consolidation time up to 439 seconds. Excess pore pressures at nodes 23 and 25 are zero (free drainage)

Test 2 (effect of increasing sand permeability) FE results with following properties: Dr=35% for breakwater sand For rock armour E= KPav=0.15 For breakwater sand k= 5x10 -3 m/s.

Excess pore pressure at various nodes in section 9-9 for duration of quake of 53 seconds and further consolidation time up to 439 seconds. Excess pore pressures at nodes 23 and 25 are zero (free drainage)

Test 3 (effect of stiffness of surrounding rock armour) FE results with following properties: Dr=35% for breakwater sand For rock armour E=150.0 KPav=0.15 For breakwater sand k= 5x10 -5 m/s. Here we reduced stiffness of rock armour

Deformed mesh plot of section 9-9, with smaller stiffness for rock armour

Excess pore pressure at various nodes in section 9-9 for duration of quake of 53 seconds and further consolidation time up to 439 seconds. Excess pore pressures at nodes 23 and 25 are zero (free drainage)

Test 4 (effect of compaction of breakwater material) FE results with following properties: Dr=70% for breakwater sand For rock armour E= KPav=0.15 For breakwater sand k= 5x10 -5 m/s. Here we have doubled the relative density of breakwater sand

Excess pore pressure at various nodes in section 9-9 for duration of quake of 53 seconds and further consolidation time up to 439 seconds. Excess pore pressures at nodes 23 and 25 are zero (free drainage)

Test 5 Introducing rock filter at bottom of breakwater FE results with following properties: Dr=35% for breakwater sand For rock armour E= KPav=0.15 For breakwater sand k= 5x10 -5 m/s. 3 meter layer rock filter is placed at bottom of breakwater. This has Dr=70% and k=1x10 -3 m/s

Excess pore pressure at various nodes in section 9-9 for duration of quake of 53 seconds and further consolidation time up to 439 seconds. Excess pore pressures at nodes 23 and 25 are zero (free drainage)

Conclusions This Finite Element study concentrated on four factors linked to liquefaction. These are: Effect of using more permeable material for breakwater core. The permeability was increased from 5x10-5 to 5x10-3,as detailed in test 1 and 2. Although the results show some variation in deformation and excess pore pressure, overall deformation remains the same. It can therefore be concluded that changing the permeability will only allow excess pore pressure to escape from the in-situ sand and move into the breakwater core material thus causing more liquefaction in this zone. Using more permeable material, therefore, may not reduce the effect of liquefaction. Effect of using more permeable material for breakwater core. The permeability was increased from 5x10-5 to 5x10-3,as detailed in test 1 and 2. Although the results show some variation in deformation and excess pore pressure, overall deformation remains the same. It can therefore be concluded that changing the permeability will only allow excess pore pressure to escape from the in-situ sand and move into the breakwater core material thus causing more liquefaction in this zone. Using more permeable material, therefore, may not reduce the effect of liquefaction.

Conclusions Effect of using stiffer material for rock armour. The rock armour stiffness was changed to a small value as in test 3. The results show considerable displacement and the analysis had to be limited to a short period of time (only 63 seconds) as severe deformation would cause numerical ill- conditioning. Effect of using stiffer material for rock armour. The rock armour stiffness was changed to a small value as in test 3. The results show considerable displacement and the analysis had to be limited to a short period of time (only 63 seconds) as severe deformation would cause numerical ill- conditioning.

Conclusions Effect of compaction. The relative density (Dr) specified for the breakwater core material below the water level is 35%. If this is to be increased to say twice as much, as in test 4, the settlement reduces by nearly half as much. Therefore, compaction (increase in Dr) is likely to reduce the effect of liquefaction. The most critical material parameter for the densification model is the unloading parameter Mf which is linked to the relative density of the sand (Dr). Effect of compaction. The relative density (Dr) specified for the breakwater core material below the water level is 35%. If this is to be increased to say twice as much, as in test 4, the settlement reduces by nearly half as much. Therefore, compaction (increase in Dr) is likely to reduce the effect of liquefaction. The most critical material parameter for the densification model is the unloading parameter Mf which is linked to the relative density of the sand (Dr).

Conclusions Effect of using a rock filter. Adding a 3m rock filter at the bottom of the breakwater would have two main advantages which help reduce liquefaction. These are higher density associated with such rock material, and higher permeability, allowing excess pore pressure to dissipate more quickly. Effect of using a rock filter. Adding a 3m rock filter at the bottom of the breakwater would have two main advantages which help reduce liquefaction. These are higher density associated with such rock material, and higher permeability, allowing excess pore pressure to dissipate more quickly.