1 Overview about the PTB Ex Proficiency Testing Scheme - Status Report - Lisa Zater, Tim Krause, Uwe Klausmeyer 26 th of August 2014 ExTAG WG 10.

Slides:



Advertisements
Similar presentations
September 9, Electrical Safety Division Testing and Evaluation of Electrical Equipment Independent Laboratory Part 6 Workshop.
Advertisements

ispark 'i' Explosionprotection made by PTB:
Compliance With Resolution 0859 – Safety of Persons Underwriters Laboratories Inc. March 2008 Refrigerators, Freezers and Combination of Refrigerator-Freezers.
VSD AND SS DRIVING ATEX MOTORS February Introduction to ATEX 2 ATEX motor designation 3 VSD Sample Solutions 4 SS descriptions.
Bidding Protocols for Deploying Mobile Sensors Reporter: Po-Chung Shih Computer Science and Information Engineering Department Fu-Jen Catholic University.
Brian A. Harris-Kojetin, Ph.D. Statistical and Science Policy
HABEEB HATTAB HABEEB Office: BN-Block, Level-3, Room Ext. No.: 7292 H/P No.:
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
FTP Biostatistics II Model parameter estimations: Confronting models with measurements.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
EMODNet Chemistry Steering Committee January 2014 Rome Giordano Giorgi
Twinning Project RO2006/IB/EN/09 1 Saxony-Anhalt State Environmental Protection Agency Wolfgang GarcheBukarest Wolfgang Garche Saxony-Anhalt.
NEW TECHNOLOGY IN MINE SURVEYING AND ITS IMPACT ON SAFETY IN THE UNDERGROUND WORKINGS OF A MINE.
Mr. Harethe El Ouadhane IEC member for IEC MT14. |Infrastructure Business | Germany | Test Engineer & Expert (Internal Arc, Making, Breaking.
Proposal of Fire Resistance Test
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Volkmar Schröder BAM, D Berlin Folie 1 International Conference on Hydrogen Safety, Pisa, September 8-10, 2005 Explosion Characteristics of Hydrogen-Air.
Uncertainty analysis is a vital part of any experimental program or measurement system design. Common sources of experimental uncertainty were defined.
ISO 28580: Information on Rolling Resistance (RR)
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
1 EXPERIENCE AND RELIABILITY. 2 Short circuit loop measurements EN EN
COMPETENCY CERTIFICATION WITHIN THE INDUSTRY Hazardous Area Standardisation - A case study from Australia 3 What is Competency Competency comprises the.
Manfred Kochsiek Wilfried Schulz Physikalisch-Technische Bundesanstalt Braunschweig und Berlin Modernisation of Legal Metrology in Germany.
V. Rouillard  Introduction to measurement and statistical analysis ASSESSING EXPERIMENTAL DATA : ERRORS Remember: no measurement is perfect – errors.
ISO/IEC A review of the new standard for laboratory accreditation
Determination of System Equivalency – Starting note for WLTP IWG Meeting #8 in Pune, India Audi, EA-52, V2.0 WLTP-08-09e.
Slide 1 of 19 Lessons from the Foundation Learning provision for the new 16 to 19 Study Programmes Discussion materials Issue 1: Attendance, retention,
Development of An ERROR ESTIMATE P M V Subbarao Professor Mechanical Engineering Department A Tolerance to Error Generates New Information….
Pro-Science 4 th International Conference of Hydrogen Safety, September 12-14, 2011, SAN FRANCISCO, USA EXPERIMENTAL STUDY OF IGNITED UNSTEADY HYDROGEN.
© BA Electrical Machines - 1 M3000 Ex-motors August 2002 M3000 Low Voltage Motors for Hazardous Areas.
INTERNATIONAL SEED TESTING ASSOCIATION (ISTA) The International Seed Testing Association GMO PT Program Design and Analysis AIEC Fall.
1 Introduction to Estimation Chapter Concepts of Estimation The objective of estimation is to determine the value of a population parameter on the.
American Association for Laboratory Accreditation Practical Solutions to Traceability and Uncertainty in Accreditation Presented to CITAC-NCSLI Joint Workshop.
Hot Work Procedure Training
Fundamentals of Data Analysis Lecture 10 Management of data sets and improving the precision of measurement pt. 2.
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
Basic Awareness Training for all Staff
United Nations Statistics Division Registry of national Classifications.
Standards Certification Education & Training Publishing Conferences & Exhibits 1Copyright © 2006 ISA ISA-SP99: Security for Industrial Automation and Control.
1 PED: equivalent overall level of safety PED Annex 1, clause 7: The following provision apply as a general rule. However, where they are not applied,
A Theoretical Framework for Adaptive Collection Designs Jean-François Beaumont, Statistics Canada David Haziza, Université de Montréal International Total.
Toulouse Aeronautical Test Centre (CEAT)
Company Confidential 1 © 2005 Nokia Thermal_Requirements_Guideline_v10.ppt / / OS Thermal Requirements and Uses Cases for SPR Guideline to SPR.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
CHEN 4470 – Process Design Practice Dr. Mario Richard Eden Department of Chemical Engineering Auburn University Lecture No. 2 – Contents of Reports January.
Experimental and numerical studies on the bonfire test of high- pressure hydrogen storage vessels Prof. Jinyang Zheng Institute of Process Equipment, Zhejiang.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
1 Discussion paper on Current Status on TF5 test items Xiao Chengwei.
Introduction to Revision of GTR 7
RMC Auditor Workshop Charleston, SC July 2015 Registration Management Committee Company Confidential RMC Auditor Workshop Charleston, SC
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Establishing by the laboratory of the functional requirements for uncertainty of measurements of each examination procedure Ioannis Sitaras.
Improvement in the Reliability and Comparability of pH and Electrolytic Conductivity Measurement Results San Diego, 06 August 2002 Petra Spitzer, Ralf.
European standardisation of emission testing:
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Structural Fire Engineering, October 2015, Dubrovnik, Croatia
Jim Munro Chairman IECEx Panel of Assessors
PTB Ex Proficiency Testing Scheme
National Laboratory Association
Michel BRENON IEC ExTAG Secretary
OD021 Prior to the 2004 IECEx meetings in Slovenia it was reported that their appeared to be a difference in interpretation of the requirements of the.
Session 2 “Plug Discharge” Test
Working Group on Rail Transport Statistics
”Electrochemical protection of metals”
EXPERIMENTAL DETERMINATION OF MINIMUM IGNITION CURRENT (MIC) FOR HYDROGEN /METHANE MIXTURES FOR THE DETERMINATION OF THE EXPLOSION GROUP CORRESPONDING.
ESS elliptical cryomodule
ECMA-287 Safety of Electronic Equipment Safeguards to reduce harmful exposure to energy sources Ecma TC12 Rue du Rhône CH-1204 Geneva - T: +41.
Changes in EN
Revised Art 12 reporting format
Developing Standards and Linkage to IECEx
Presentation transcript:

1 Overview about the PTB Ex Proficiency Testing Scheme - Status Report - Lisa Zater, Tim Krause, Uwe Klausmeyer 26 th of August 2014 ExTAG WG 10

2 Progress report Status of programs “EP”, “SI”, “FT” and “TC” A total of 63 participating laboratories from 30 countries! Program 3 “Flame Transmission” Number of participating laboratories: 49 Program 4 “Temperature Classification” Number of participating laboratories: 46 Program 1 “Explosion Pressure” Number of participating laboratories: 47 Program 2 “Spark Ignition” Number of participating laboratories: 45

3 Progress report Status of programs “EP”, “SI”, “FT” and “TC”

4 Progress report Status of current programs “FT” & “TC” Coverage: 82 % Coverage: 40 %

5 Proficiency Testing Scheme

6 Program 1 “Explosion Pressure”Program 2 “Intrinsic Safety” Program 3 “Flame Transmission”Program 4 “Temperature Classification”

7 Status Number of participating laboratories: 48 (1 straggler) Uploaded results in Phase I: 45 Uploaded results in Phase II: 14 (two laboratories provide their results only in Phase II) Program “Flame Transmission - FT”

8 Normative background: IEC Characteristic of interest: Property of flame transmission for three different nozzles (ø 0.7 mm, ø 0.8 mm, ø 0.9 mm) Principle: The gas-air mixture filled chambers are connected via flange with three exchangeable nozzles. After ignition in Pipe A the participant observes if there is a flame transmission into Pipe B or not. Gas-air mixture: (27.5 ± 1.5) % Hydrogen (IIC) Tests: 10 ignitions per nozzle

9 Production quality and tolerance of a nozzle Drill hole diameters of the nozzles: [(0.7 / 0.8 / 0.9) ± 0.01] mm Visual check of the quality/condition of the nozzle countersink at the inlet and outlet (before and after ignitions) Homogeneity

10 Test results and evaluation of the results Bar-charts of the participants’ results of Phase I compared to Phase II with the assigned value

11 Test results and evaluation of the results Bar-charts of the participants’ results of Phase I compared to Phase II with the assigned value

12 Test results and evaluation of the results Bar-charts of the participants’ results of Phase I compared to Phase II with the assigned value

13 Test results and evaluation of the results Bar-charts of the participants’ results of Phase I compared to Phase II with the assigned value

14 Test results and evaluation of the results Proficiency assessment It is not intended to perform the proficiency assessment at this stage of the program. The assessment criteria are to be defined by discussion with the community. A common proposal is to use the standard deviation for the proficiency assessment (according to Standard ISO 13528; clause )... but... The use of spread parameters like variance or standard deviation for describing the results doesn’t make sense in this program due to the small number of ignitions n (small number of independent yes/no experiments). Statistically the statement of the spread parameters would not make sense.

15 Test results and evaluation of the results Proficiency assessment (without statistical basis!)

16 Test results and evaluation of the results Bar chart of the comparison of total bias (absolute) for all participants between Phase I and Phase II

17 Status Number of participating laboratories: 46 Uploaded results of Phase I: 45 (a ExTL will only take part in Phase II.) Program “Temperature Classification - TC”

18 Program “Temperature Classification” Normative background: IEC Measurand of interest: maximum surface temperature Principle: Determination of the hotspot and measuring the maximum surface temperatures at different surfaces (glass, plastic, copper and steel) Scope: three power levels for different temperature classes at four surfaces

19 Program “Temperature Classification - TC” Additional hardware – Power supply controller The same effective wattage of each heating cartridge can be ensured. The effective wattage of heating cartridge remains constant by changing of a local power supply.  to ensure homogeneity

20 Test results and evaluation of the results Determination of hotspots – assigned value and participants’ results Copper: homogeneous temperature distribution

21 Test results and evaluation of the results Glass surface at level 3 Determination of temperature – participants’ results 9 test results are under the range!!!

22 Test results and evaluation of the results Plastic surface at level 3 Determination of temperature – participants’ results 10 test results are under the range!!!

23 Test results and evaluation of the results Copper surface at level 3 Determination of temperature – participants’ results 10 test results are under the range!!!

24 Test results and evaluation of the results Steel surface at level 3 Determination of temperature – participants’ results 7 test results are under the range!!!

25 Test results and evaluation of the results Temperature classification

26 Test results and evaluation of the results Temperature classification

27 Further activities concerning „TC“ Phase II: Testlaboratories, whose results were significantly lower than range, have been contacted and offered suggestions to improve performance procedures They now have the chance to repeat tests and upload new results Updating of new assigned value with repeated test results Final report Reporting phase:

28 Feedback of participants of PT programs FT/TC Results of the survey * out of 10 possible points The evaluation consists of 9 results, that have been received by August 21 st 2014.

29 Feedback of participants + Programs are well managed, well supported + Participation quite beneficial + We are particularly grateful for the level of support that our explosiontest lab personnel received in troubleshooting and fixing fundamental issues with our test equipment. This has made a dramatic improvement in the quality and consistency of test results. + Participation has given us greater confidence in the technical work developed in our testing laboratory + Congratulations to all members and supporters of the PTB Ex PT scheme; we reaffirm our desire to encourage and to take part in new proficiency programs conceived with similar format and organization. + Very useful comparison of practice - Reports are using too much of mathematics for the value of information Comments about the programs (pos. +/neg. -)

30 Feedback of participants of the Workshops Results of the survey * out of 10 possible points The evaluation consists of 9 results, that have been received by August 21 st 2014.

31 Feedback of participants Future program ideas - testing for purged/pressurized enclosures, such as purge effectiveness - Flameproof motor test - [ 10 ] Overpressure test (IEC , cl ). - [ 09 ] Measurement of capacitance (IEC , cl ). - [ 08 ] Clearances, creepage distances and separations (IEC , cls. 43 and 4.4; IEC , cl. 6.3; IEC , cl. 6.4). - [ 07 ] Spark ignition and surface temperature of cells and batteries (IEC , cl ). - [ 06 ] Surface resistance test (IEC , cl ). - [ 05 ] Tests for apparatus containing piezoelectric devices (IEC , cl. 10.7). (10 = highest priority – 0 = lowest priority) - Thermal endurance followed by IP test - Segregation measurement of terminals - Temperature class determination of Ex-e terminal boxes according to IEC Annex E (Power dissipation and temperature calculations) Test according to Comformity assessment of Ex-d equipment special cases (Breathing devices, Very small enclosures, Conduits, Gas analysers - Performance test of gas detectors and sinters according to , especially test of surface temperature of sinter during the explosion tests. - Temperature measurement program with complex and different temperature sources in one unit. - Maximum pore size of sinters - Surface Resistivity Tests. IP5/6X Dust tests

32 PTB Ex PTS – Cost evaluation Estimated costs of the programs: Cost of test samples Test Sample “EP” & “FT” ≈ 3, x 60 copies = EUR 180,000 Test Sample “SI” ≈ 4,000 x 45 copies = EUR 180,000 Test Sample “TC” ≈ 3,000 € x 46 copies = EUR 138,000 Costs of HR since 2009 for development and operation of the PT programs “EP” & “FT” ≈ EUR 300,000 “SI” ≈ EUR 150,000 “TC” ≈ EUR 100,000 Overall costs 2009 until 2014: EUR 1,048,000 Estimated overall HR/sample costs per year assuming the development of one new PT program per year and processing one program per year: EUR 300,000. PTB would be happy to receive EUR 3,000 per laboratory and year, the rest is covered by PTB

33 Further activities Drafting a best practice paper for discussion with the community as a result of the program FT ( e.g. “Best practice in tests for non-transmission of an internal ignition in compliance with ISO ”) Continuous improvement process of the Ex Proficiency Testing Scheme (e.g. participant surveys) Development of potential new PT programs Which programs should be started in 2015 ? Discussion about consequences for the scope of an ExTL in case of poor response and measurement quality and consequences for non-performing ExTLs

34 Further activities Discussion about the involvement of ExTL candidates in the Ex PT Scheme respective individual programs ordered by the assessment team for the on site assessment Discussion about overhead costs for providing the PT programs (plan, validation, samples, reports, daily support,...) Discussion about the inhouse work load caused by Ex PT programs, max. number of working hours

35 Thank you for your attention… Dipl.-Ing. (FH) Tim Krause, M.Eng. Working Group 3.54 "International Harmonization in Explosion Protection" Physikalisch-Technische Bundesanstalt (PTB) Bundesallee 100, Braunschweig, Germany Direct Phone: +49 (0) Fax: +49 (0) Lisa Zater, B.Eng. Working Group 3.54 "International Harmonization in Explosion Protection" Physikalisch-Technische Bundesanstalt (PTB) Bundesallee 100, Braunschweig, Germany Direct Phone: +49 (0) Fax: +49 (0)