Www.energy.gov/EM 1 Groundwater David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management Los Alamos Field Office March 3, 2015.

Slides:



Advertisements
Similar presentations
The Committee and Research – Where are we and where might we be going?
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
2014 Vapor Intrusion Guidance Amendments Discussion Points Waste Site Cleanup Advisory Committee Meeting May 22, 2014.
Vapor Intrusion. What is Vapor Intrusion? The migration of volatile chemical vapors from the subsurface to overlying buildings.
Office of Science Experience with Surveillance and Maintenance (S&M) of Environmental Remediation David Michlewicz – DOE Office of Science, Office of Safety,
Presentation to the Lahontan Regional Water Quality Control Board June 8, 2011 Project Update Groundwater Remediation Project Hinkley Gas Compressor Station.
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
1 Los Alamos National Laboratory (LANL) Office of Environmental Management REMAINING CLEANUP OVERVIEW David S. Rhodes Acquisition Integrated.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Nelly Smith EPA Region 6. - Develop or revise bacteria reduction program for consistency with new TMDL requirements and allocations - Develop or revise.
1 Decontamination, Deactivation, and Demolition David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management Los.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
1 Aggregate Areas David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management Los Alamos Field Office March 3,
Navy Involvement with Perchlorate Issues and an Overview of Activities at Naval Weapons Industrial Reserve Plant McGregor, Texas Mario Dumenigo Naval Facilities.
PILING IMPLICATIONS FOR A NEW INDUSTRIAL DEVELOPMENT ON A CLOSED LANDFILL SITE By Michael Redfern.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA U N C L A S S I F I E D Integrated Post-Las Conchas Monitoring Los.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
Airport Road Waste Disposal Area April 28, 2005 The University of North Carolina at Chapel Hill.
Proposed San Antonio Groundwater Availability Project Claudia Faunt and Matt Landon California Water Science Center U.S. Geological Survey.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
Chris M. Kapheim General Manager May 5, AID Groundwater Map.
FSA Groundwater Flow and Solute Transport Model Presentation to Scottsdale Citizens Group March 19, 1999.
1 Facilitating Reuse at RCRA Sites: Innovative Technologies for Groundwater Characterization and Cleanup Introduction Walter W. Kovalick Jr., Ph.D. Associate.
DTSC VAPOR INTRUSION GUIDANCE California Industrial Hygiene Council 16 th Annual Conference Dan Gallagher Department of Toxic Substances Control California.
1 Material Disposal Areas David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management Los Alamos Field Office.
One Project. One Team. One Goal.
1 Project Management, Support Functions, and Integration David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
EVALUATION TOPIC Coal Exploration Sites – Offsite Impacts and Reclamation Success.
Site Activities Update Park – Euclid RP Group Community Advisory Board Meeting January 16, 2013.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
Delivering sustainable solutions in a more competitive world 1 © COPYRIGHT 2010 ERM.
Monitoring and Protecting Groundwater During Oil & Gas Development Overview of Colorado Aquifer Systems November 26, 2012 Christopher J. Sanchez, P.G.
Remediation System Design & Implementation Presented by.
Presented by Gary Lippner & Glenn Moeller 3 - Year Storm Water Monitoring Action Plan.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Fairbanks Areawide Industrial Reclamation Project ADEC AREAWIDE MANAGEMENT GOALS Janice Wiegers ADEC.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
USEPA Region 2 Vapor Intrusion Study Cayuga Groundwater Contamination Site March 4, 2009.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Environmental Toolbox. Technical Module Introduction.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Integrated Stormwater Monitoring associated with the 2011 Las Conchas Fire.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Team Successes at the Former Memphis Depot, Memphis, Tennessee Presented by: David D. Nelson, P.G.Thomas C. Holmes Project Manager, CH2M HillProject Manager,
Greener Cleanups in the Region 10 PCB Program Michelle, Mullin R10 PCB Coordinator Clu-In Webinar November 17, 2015.
I RIS E NVIRONMENTAL Independent Review of Documents Pertaining to the Lehigh Southwest Cement Permanente Facility Rob Balas & John McLaughlin February.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
ESAC Meeting December 1, pm LOS REALES LANDFILL UPDATE Entrance Facility Rodeo Wash Erosion Control Structure Scale House Drainage and other Stormwater.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Green Remediation through Optimization Douglas Sutton, PhD, PE Tetra Tech GEO April 4, 2011.
Cover Slide TCEQ logo.
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Chemical Metals Industries, Inc. (CMI)
Welcome.
Sacramento County Stormwater Quality Program
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Chemical Metals Industries, Inc. (CMI)
Board of Public Utilities August 17, 2017
the path less traveled Termination of Post Closure Care
Sacramento County Stormwater Quality Program
Presentation transcript:

1 Groundwater David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management Los Alamos Field Office March 3, 2015

2 Regulatory Framework for Water  New Mexico Water Quality Control Commission (NMWQCC) establishes standards Uses U.S. Environmental Protection Agency (EPA) drinking water standards NM applies the EPA standard to any affected regional aquifer water  EPA Clean Water Act standards apply for surface waters  NM certifications apply to any surface water discharges instead of receiving waters

3 Groundwater and Surface Water  Interim Facility-Wide Groundwater Monitoring Plan Planning in coordination with NNSA M&O in response to NMED-HWB direction on frequencies, analytes (what we sample for), and locations/screens Sampling, packaging, and shipping groundwater samples to analytical laboratories and receiving results, reviewing, and publishing results in the Environmental Information Management System (EIMS) (Intellus – publically accessible database) Reporting results to NMED-HWB in Periodic Monitoring Reports (PMR)  Surface Water Protection Monitoring Planning and strategizing surface water compliance in accordance with the EPA-issued Individual Permit for Storm Water (IP) Collecting samples, packaging, and shipping samples to analytical laboratories and receiving results, reviewing, and publishing results Installation and maintenance of stormwater controls, comparison to background concentrations, and evaluation of alternatives  Hexavalent Chromium Plume in Mortandad Canyon Conducting plume control interim measures to prevent off-site migration Supporting NMED-HWB consideration of alternatives and NMED-HWB development of a draft Statement of Basis for a remedy Execution of the selected remedy (likely as a capital asset project)

4 Groundwater and Surface Water  RDX High Explosive Plume in Cañon de Valle Surface water corrective actions to address soil contaminant impacts Subsurface evaluation and studies include cross-hole pump testing and considerations of remedy alternatives and supporting NMED-HWB drafting of a Statement of basis for a remedy Execution of NMED-HWB directed remedy actions  Surface Water Boundary Protection Evaluation of watersheds for contaminant migration off-site and redistribution of stormwater sediment transport with the associated installation of appropriate stormwater controls (beyond requirements of IP for Stormwater)  Vadose Zone Gas or Moisture Monitoring Continuation of soil vapor extraction at MDA-L, pore-gas monitoring at MDA-C, and moisture monitoring at MDA-T  Wells and Boreholes Installation of wells and boreholes, maintenance of the equipment and pads, and plugging and abandoning unnecessary locations

5 IFGMP  Interim Facility-Wide Groundwater Monitoring Plan (IFGMP) Shared between EM and NNSA programs  Quarterly, semi-annual, and annual sampling programs periodic monitoring reports per year percent of samples are able to be collected (dry holes and springs) Three weeks to collect samples Six weeks for data return from analytical laboratories Pueblo data review requirements before posting Publically-accessible database (result of chromium settlement) Standard format PMRs (NMED rejected EIMS data submittal only)  NMED frequencies are not data driven, but project groupings

6 Groundwater Monitoring Network  Extensive monitoring network More than 140 groundwater monitoring wells More than 200 monitoring points (screens) covering 3 zones More than 660 samples analyzed per year  Work-plan negotiated annually with NMED  Years of characterization and monitoring have come down to two main issues Chromium contamination RDX contamination

7 Groundwater contaminant plumes

8 Surface Water Controls Examples  Individual Permit for Stormwater (IP) IP issued in 2010, renewal in 2015? o Discharges from 405 SWMUs and AOCs o NM drinking water quality standard-based Target Action Levels (TAL) Stormwater samples at monitoring areas o Storm dependent – only half of sites flowed o Site/result screening process o Path to completion and removal from IP Installation of stormwater controls and confirmation sampling Alternative compliance pathways for anthropogenic and background contributors Semi-annual meetings with NMED and community interest organizations  Los Alamos/Pueblo Canyon Storm Water Quality Sampling System Early Notification System interface with Buckman Direct Diversion project

9 Surface Water Controls Examples  Extensive monitoring network  Watershed scale  Sample surface water at over 200 different locations  Monitoring to measure performance of mitigations Conducted in canyons Emphasis is on boundary stations Additional focus on potential post-fire effects

10 Surface water controls

11 Surface water controls

12 Hexavalent chromium Investigation  Monitoring well pump testing Extraction works in the center of the plume  Extraction pilot testing and plume boundary control Trying to bring plume edge to drinking water standard within 3 years  Geochemistry laboratory testing Whether natural attenuation can be a factor  Injection wells pilots Extraction water disposition pathway and shape plume  Corrective measures evaluation expected Fall 2016 to propose remedy

13 Chromium groundwater model

14 Chromium plume model

15 RDX contaminant plume  Surface water corrective measures implementation Potential springs treatment system o Permitting issues with natural system components Surface permeable reactive barriers (PRB) o September 2013 storms destroyed the PRB in canyon channel o Restoring is not cost-effective Significant removal done previously  Subsurface corrective measures evaluation Additional characterization wells Monitoring well pump testing Determination of potential remedies

16 Surface water boundary protection  Watershed scale stormwater controls Need to evaluate canyon performance Potential designs must address significant LANL traffic patterns (roadways)  Defense-in-depth Downstream of LANL Multi-Sector General Permit (MSGP) controls Downstream of IP controls and project cleanup activities Mitigates contaminant transport off-LANL property Protects Pueblo de San Ildefonso and Santa Fed County public drinking water supplies at the Buckman Direct Diversion Project in the Rio Grande

17 Vadose zone activities  MDA-T moisture monitoring Needed to input to Corrective Measures Evaluation (CME) o Mesa breathes; will moisture migrate downward?  MDA-L Soil Vapor Extraction To keep VOC plume from migrating further towards water table Works best under asphalt cap/roads/pads Previous pilot worked well, operating now Expect to see long-term benefits in reduction in VOC concentration levels Expect early indication of potential additional drum leakage  MDA-C pore-gas monitoring Minor plume Impacts adjacent NNSA facility construction

18 Groundwater wells and maintenance  Installation and replacement of additional wells, boreholes, and coreholes Typically ~5 wells of boreholes a year FY2015 has ~10 holes to be drilled  Maintenance of groundwater monitoring equipment, pads, and roads Well pumps fail and need replacement Wells pads and access roads have to be maintained to allow all-season access Reconfigure to develop, rehabilitate, rescreen, etc. as sample quality deteriorates