Desalination & Clean Water Technology Industry-Government Forum August 23, 2012 Roger Bailey Public Utilities Director.

Slides:



Advertisements
Similar presentations
Federal Energy and Environmental Regulation Agencies and Laws
Advertisements

Paving a Path to Potable Reuse Flexible Treatment for To Be Determined Regulations Michael Watts, PhD, PE Water Technology Leader Garver.
Drinking Water Through Recycling The benefits and costs of supplying direct to the distribution system Dr Stuart Khan School of Civil & Environmental Engineering,
State Water Resources Control Board and Regional Water Quality Control Boards Regulatory Authority Review and Concepts for a Statewide Order for Composting.
California Water Imported Supplies Groundwater Storm Water
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
Connecticut Department of Energy and Environmental Protection.
Toilet to Tap: Water Resources and San Diego Jeanne Faverman ENVI 485 March 22, 2007.
Drought and the Central Valley Project August 2014.
Federal Energy and Environmental Regulation Agencies and Laws
New Technologies in Wastewater Treatment The Impact to O&M Staff “New Directions in Wastewater Treatment” October 21 st, 2014 Art Nunez Water Reclamation.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
1 Recycled Water Program for the City of Los Angeles.
WATER BOND Mark Watton General Manager - Otay Water District Speakers: Moderator: Ken Weinberg Director Water Resources - San Diego County Water Authority.
Citizens’ Academy Kathy Viehe GRU Interim General Manager November 12, 2014.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Drivers for Reuse Principal driver is water stress (need for water) Scarcity of renewable freshwater resources due to: – Population increases – Industrial.
San Diego County Water Issues 2010 Update Maritime Business and Technology Summit November 16, 2010 Seawater Desalination for San Diego.
DRA Perspective on What Recycled Water Applications from Investor- Owned Utilities Should Contain and How They Should be Evaluated CPUC Water Recycling.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
July 2007 AMTA Event Type “Theme” Location - Date Improving America’s Water Through Membrane Filtration & Desalting America’s Authority in Membrane Technology.
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Approaching Water Sustainability through Water/Wastewater Reductions William Fifty and Laura Lokey-Flippo USACHPPM - Surface Water and Wastewater Program.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Point Loma and An Integrated Water and Wastewater Solution Ann Sasaki, Assistant Public Utilities Director Industrial Environmental Association Water Committee.
Potable Reuse: A New Water Resource for the Central Coast Water Breakout Session – 2015 Central Coast Sustainability Summit James Hawkins, Heal the Ocean.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
 Oklahoma Department of Environmental Quality Water Quality Division.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
Demonstration Project in Waste Water Treatment Delhi Jal Board, India Is Water Business Export Business? DHI, 14 October 2011 Peter Sand.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Potable Reuse in Texas: A Glimpse into the New Water Frontier Ellen McDonald, Ph.D., P.E. Alan Plummer Associates, Inc.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
Shifting from Wastewater Treatment for Disposal to Treatment for Resource Recovery.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Mmwd1013i1.pptx/1 Hormones, Pharmaceuticals, and Personal Care Products (CECs) in Water October 20, 2015 Andrew Salveson
Available Funding North/South Lahontan Colorado River Basin Sacramento River Mountain Counties Tulare/Kern San Diego Santa Ana Los Angeles Central Coast.
Urban Water Institute Conference Michael R. Markus, P.E., D.WRE, BCEE, F.ASCE General Manager February 11, 2016 ORANGE COUNTY WATER DISTRICT.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Silicon Valley Advanced Water Purification Center And Future of Purified Water Use Tour Guides: Miguel Silva Tour Coordinators: Amy Fry, Michelle Pelayo-Osorio.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
3 Old Dominion University Lake Gaston Project Field Trip November 1, 2014 Thomas M. Leahy, P.E. Director of Public Utilities.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
Do you know? By 2015, an estimated 40-48% of new non-residential construction by value will be green, equating to a $ billion.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Potable Reuse in Texas Where Are We Now? Joel Klumpp Texas Commission on Environmental Quality Potable Reuse in Texas Where Are We Now?
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
University of Nevada Advanced Water Treatment Technologies Demonstration Project Western Regional Water Commission June 21, 2017.
Recycled Water Project Basis of Design Report
Federal Energy and Environmental Regulation Agencies and Laws
RUSSELL - ROSSBURN WATER SUPPLY
PLANNED POTABLE REUSE: URBAN WATER INSTITUTE’S SPRING WATER CONFERENCE
Water Reclamation Plant Feasibility Study Update May 28, 2014
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Florida and Reclaimed Water
WASTEWATER MANAGEMENT IN TURKEY
“Is the Bay Area Ready for Potable Reuse?1”
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
ADVANCED WATER PURIFICATION SYSTEM
October 29, 2018 Terry Lauritsen, P.E.
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Is the Bay Area Ready for Potable Reuse?
CENTRAL FLORIDA POTABLE REUSE TEST PROJECTS .
Why Potable Reuse in Florida?
How the GWRS Overcame the “Yuck” Factor
Presentation transcript:

Desalination & Clean Water Technology Industry-Government Forum August 23, 2012 Roger Bailey Public Utilities Director

Policy Development  Water Supply Reliability  Local Supply Development  Legal Constraints  Natural Disasters  State and Federal Regulations  Water and Waste Water Treatment Processes  Affordability for Ratepayers 2

Water Supply: Seven-Year Average

Water Supply Reliability  Limited local supplies  Increasing cost of imported water  Pumping restrictions  Recurring drought conditions  Internal population growth  Natural disasters 4

State and Federal Regulations  Drinking Water Quality  Upgraded all three water treatment plants  Alvarado and Miramar – Ozone treatment  Otay – Chlorine Dioxide  National Pollutant Discharge Elimination System Permit  Modified Permit allows advanced primary treatment at Pt. Loma Waste Water Treatment Plant 5

State and Federal Regulations  Greenhouse Gas Emission Reduction  AB 32 requirements  Energy/water/waste water nexus  Need technologies to improve reliability, treatment while reducing energy consumption  Water Conservation Mandate  20% by 2020  “Low hanging fruit” is taken – support new ideas 6

Water and Waste Water Treatment  Upgraded all three water treatment plants  Alvarado and Miramar – Ozone treatment  Otay – Chlorine Dioxide  Modified Permit allows advanced primary treatment at Pt. Loma Waste Water Treatment Plant  Completed Recycled Water Study in July 2012  Condition of Coastal Commission approval for 2010 NPDES permit 7

 Operate one MGD facility  San Vicente Reservoir study  Define regulatory requirements  Conduct energy & economic analysis  Public education & outreach C OMPONENTS O UTCOMES Water Purification Demonstration Project  Validate treatment process  Gain regulatory approval  Evaluate cost  Public acceptance

Recycled Water Study  Identify opportunities to increase recycling of wastewater for Indirect Potable Reuse (IPR)and Non- Potable Reuse (NPR) for a 2035 planning horizon  Determine the extent recycling can reduce wastewater flows to the Point Loma Wastewater Treatment Plant  Determine implementation costs 9

Recycled Water Study  Two Forms of IPR Evaluated:  Groundwater Recharge  Reservoir Augmentation  Findings:  Groundwater basin size and data insufficient to determine potential recharge projects. Revisit when more data is available 10

Recycled Water Study  Findings:  Two reservoirs deemed large enough to provide retention times within range required in draft groundwater recharge regulations  San Vicente Reservoir  Otay Reservoir 11

Recycled Water Study Prioritized Next Steps  Finalize the Water Purification Demonstration Project (Dec 2012)  Conduct Facility Siting Studies  Evaluate cost sharing concepts  Prepare Financing Plan  Integrate into Point Loma Waiver Process  Confirm Otay Reservoir IPR Potential 12

Affordability for Ratepayers  Water and waste water service are fee based  Revenues for the system are derived from customers’ bills  The City has had success when State and Federal grant funds are available  Future enhancement to system must be financially beneficial for ratepayers 13

Questions 14

Back up slides to follow 15

San Diego Water Reuse Timeline  1993 City & County Water Authority propose Water Repurification Project  1994Congress passes the Ocean Pollution Reduction Act, allowing the City to reapply for a waiver that is later granted  Planning, regulatory reviews & conditional approval (DPH), preliminary design on project (20 TAF or 18 MGD)  Fall 1998 Water Repurification Project becomes an issue in several closely contested political campaigns  Spring 1999 Project cancelled by City Council

San Diego Water Reuse Timeline  City enters into a settlement agreement with environmental groups committing to:  Evaluate improved ocean monitoring  Pilot test biological aerated filters  Conduct study on increased water reuse  City undertakes Water Reuse Study  October 2007 City Council votes to proceed with the Demonstration Project Water Purification Demonstration Project  November 2008 City Council approves temporary water rate increase to fund $11.8 million project  January 2009-Temporary water rates in effect August 2010

Membrane Filtration  Side-by-side microfiltration (MF) & ultrafiltration (UF) to test effectiveness prior to reverse osmosis  Pressurized hollow fiber membranes  MF nominal pore size: 0.10 microns  UF nominal pore size: 0.02 microns

Reverse Osmosis: Step Two  Same technology used by bottled water companies  Forces water under high pressure through sheets of plastic membrane  Demineralizes and purifies water

Ultraviolet Light/ Advanced Oxidation Process (UV/AOP)  RO permeate combines and feeds UV/AOP  Hydrogen peroxide (30%) injected upstream of UV at 3 mg/l  UV system utilizes low pressure/high output lamps  Single reactor, 72 lamp configuration Ultraviolet (UV) plus H 2 O 2 Disinfection

Testing & Monitoring Plan Objectives  Demonstrate proposed water purification technology will produce water quality that meets public health and reservoir augmentation criteria  Evaluate nutrient removal performance of the AWP Facility treatment train  Demonstrate integrity monitoring techniques and performance reliability measures  Monitor and collect operational and maintenance requirements of the AWP Facility equipment

Water Quality Results - Overview  Exceptional overall water quality, met all project treatment goals  Purified water met all drinking water standards  Equipment at each step in the treatment process is performing properly

San Vicente Limnology and Reservoir Detention Study  Dam to be raised 117 feet  Currently 90,000 acre-feet  242,000 acre-feet after dam raise  Construction duration  Augmentation would improve water quality

Information Visit: Call: (619)