Kingston Fly Ash Release Environmental Symposium August 2, 2011 Neil E. Carriker, Ph.D. Tennessee Valley Authority.

Slides:



Advertisements
Similar presentations
Why Lab. Certification? Laboratory certification tries to insure that the laboratory is qualified and capable of analyzing the sample and obtaining quality.
Advertisements

LABORATORY CERTIFICATION & DATA QUALITY MICHAEL W. MILLER, Ph.D. NJ-DEP Office of Quality Assurance
Framework for the Ecological Assessment of Impacted Sediments at Mining Sites in Region 7 By Jason Gunter (R7 Life Scientist) and.
Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
TVA Kingston Ash Recovery Project Roane County, TN Environmental Research Symposium Roane State Community College – August 2, 2011 Craig Zeller, P.E. US.
Fish Bioaccumulation Studies Associated with the Kingston Fly Ash Release Marshall Adams - Oak Ridge National Lab Tyler Baker - TVA Allison Fortner - Arcadis.
WP4 – Task 4.4 LCA Activities
Assessment of Fish Population Health in the Vicinity of the Kingston Fly Ash Release Marshall Adams - Oak Ridge National Lab Allison Fortner – Arcadis.
Mark S. Greeley 1, S. Marshall Adams 1, Tyler F. Baker 2, Logan R. Elmore 1, Mary K. McCracken 1, and Rick M. Sherrard 2 1 Oak Ridge National Laboratory.
Ecological Studies at the Kingston Ash Spill Site Marshall Adams, Mark Greeley, & John Smith - Oak Ridge Natl Lab Tyler Baker and Hill Henry - TVA Bill.
TVA-KINGSTON FLY ASH RELEASE ENVIRONMENTAL RESEARCH SYMPOSIUM MARCH 11 – 12, 2010 RICK M. SHERRARD, Ph.D. TENNESSEE VALLEY AUTHORITY Ecotoxicology Overview.
BoRit Superfund Site Timeline
ENVIRONMENTAL UNIT IN AN ICS STRUCTURE. EU Mission Statement The Environmental Unit is established to provide technical and scientific expertise and capabilities.
Imagine the result The TVA Kingston Ash Recovery Project: Ecological Risk Approach Daniel Jones † Suzy Young † Amber Stojak † Neil Carriker ‡ † ARCADIS.
NASSCO and Southwest Marine Sediment Investigation Preliminary Results Thomas Ginn, Ph.D. Dreas Nielsen June 18, 2002.
River Corridor Closure Project Safety People Results U.S. Department of Energy Richland Operations Office 100 Area and 300 Area Component of RCBRA Steve.
Trends in Bioaccumulation of Fly Ash Contaminants by Aquatic Invertebrates Downstream of the Tennessee Valley Authority Kingston Fossil Plant John G. Smith,
1 Presented By: Matthew Duchesne Office of Environmental Compliance Office of Environmental Management Department of Energy 2010 Long-Term Surveillance.
Environmental Health XIV. Standards and Monitoring Shu-Chi Chang, Ph.D., P.E., P.A. Assistant Professor 1 and Division Chief 2 1 Department of Environmental.
Quality Assurance/Quality Control Policy
Quality Assurance Plans (QAP)
QA/QC FOR ENVIRONMENTAL MEASUREMENT
U.S. Department of the Interior U.S. Geological Survey Background Results and Discussion Evaluation of potential toxicity of fly ash released to the Emory.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
Porewater Collection and Risk Evaluation 27 th Alabama Water Resources Conference Orange Beach, AL Jacob Gruzalski Environmental Standards, Inc.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Understanding and Implementing SWAMP Comparability: Quality Assurance SWAMP Quality Assurance Help Desk Quality Assurance Research.
US Army Corps of Engineers BUILDING STRONG ® Rosewood Park Coastal Section 506 of WRDA 2000 Kirston Buczak, PMP USACE, Chicago District May 2012.
An Ecosystem-Level Study of Florida’s Major Spring Systems Robert L. Knight, Ph.D. Jackson Blue Springs Working Group Tuesday, January 13, 2009.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Claytor Hydroelectric Project Water Quality Study Mark Hutchins, Project Manager January 25, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
TVA Kingston Ash Recovery Project Roane County, TN Project Update September, 2012 Neil Carriker.
Update on Chesapeake Bay Model Upgrade Projects Blue Plains Regional Committee Briefing November 30, 2004 Presented by: Steve Bieber Metropolitan Washington.
The New Public Assistance ProgramOV-1 Objectives  Describe the purpose of the New Public Assistance Program  Identify the components of the New Public.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
ERLN OPERATIONAL FRAMEWORK EPA Quality Management Conference Presented By: Sean Kolb Schatzi Fitz-James and Terry Smith, OEM Sean Kolb and Lisa Modigliani,
Advisory Committee Kickoff Meeting SWRCB Program to Develop Sediment Quality Objectives for Enclosed Bays and Estuaries of California July 29, 2003 CAL/EPA.
Benthic Community Assessment Tool Development Ananda Ranasinghe (Ana) Southern California Coastal Water Research Project (SCCWRP) Sediment.
Development of Sediment Quality Objectives for California Bays and Estuaries Project Update-June 2004 Steven Bay Southern California Coastal Water Research.
EPA Region  What are QAPPs?  Why are Quality Assurance Project Plans needed?  When are they needed?  How are they done?  Then…what do you do.
National Aquatic Resource Surveys Wadeable Streams Assessment Overview November, 2007.
Development of Sediment Quality Objectives for California Bays and Estuaries Project Update-April 2004 Steven Bay Southern California Coastal Water Research.
Development of Sediment Quality Objectives for California Bays and Estuaries Project Update Steven Bay Southern California Coastal Water Research Project.
Development of Sediment Quality Objectives for California Bays and Estuaries Project Update Steven Bay Southern California Coastal Water Research Project.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Placer County Water Agency Middle Fork American River Project Plenary Meeting June 1, 2009 Handout #2.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
Dredging 2012 San Diego, California October 23, 2012 Ruth L. Forman, CEAC – Environmental Standards, Inc. Rock J. Vitale, CEAC – Environmental Standards,
By Mitch Cooper & Haley Herbert January 1987 Vertac site manufactured herbicides 1978 National Dioxin Survey 1983 Site placed on the National.
Margaret Byrne, U.S. Fish and Wildlife Service
1 TASK 3.2 C CMEP Mandate Mario Carere, Chiara Maggi, Bernd Gawlik, Valeria Dulio.
California Sediment Quality Advisory Committee Meeting SWRCB Program to Develop Sediment Quality Objectives for Enclosed Bays and Estuaries of California.
DIRECTIVE 2000/60/EC 2 nd MEETING CHEMICAL MONITORING ACTIVITY (CMA) BRUSSELS, 17 th NOVEMBER 2005 Chemical Monitoring Activity Draft Outline of a Guidance.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
David K. Paylor Virginia State Board of Health March 17, 2016.
A Framework for Assessing Needs Across Multiple States, Stakeholders, and Topic Areas Stephanie Wilkerson & Mary Styers REL Appalachia American Evaluation.
George E. Detsis Manager, Analytical Services Program United States Department of Energy Office of Health, Safety and Security Office of Sustainability.
The Palmerton Zinc Superfund Site EPA Response In 1980 the U.S. finally addressed the issue of hazardous wastes Comprehensive Environmental Response,
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
1 Historic DoD Ocean Disposal Operations, Requirements, and Research Hawaii Robotics Initiative for Underwater Military Munitions Oahu, Hawaii October.
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 2, 2009 Handout #5.
TVA Kingston Ash Recovery Project Roane County, TN
EPA Method Equivalency
Niagara River Area of Concern
Program Manager, Alliance for the Chesapeake Bay
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
EPA/OAQPS Pollutant Emissions Measurement Update 2019
Presentation transcript:

Kingston Fly Ash Release Environmental Symposium August 2, 2011 Neil E. Carriker, Ph.D. Tennessee Valley Authority

Questions We’re Trying to Answer Approaches We’re Using Who is Involved Schedules

 What Were Initial Ecological Damages?  How Is the Ecosystem Responding?  Are There Likely To Be Any Long-Term Effects?  Are There Likely To Be Any Latent Effects?  How Long Will Ecosystem Recovery Take? 3

Spill Volume: ~5.4 Million cubic yards (12/22/08) Emergency Response/Pilot Dredging Phase CERCLA Phase 1-- Time-Critical Action Removal –3.5 million cu yd removed from Emory River –May 29, 2010 Emory River reopened CERCLA Phase 2—Non Time-Critical Action Removal –2.8 million cu yd being removed from embayment –Consolidating in on-site disposal area –Robust subsurface perimeter containment system (withstand 6.0 magnitude earthquake) CERCLA Phase 3--Residual Ash Study –River ecosystem and human health risk assessments –Supplemental investigations and research 4

 Ideally… ◦ Lots of pre-spill data for comparison… ◦ Simple task to collect more, compare before/after 5

 Reality… ◦ A little pre-spill data available, lots of data gaps  Intensive sampling immediately post-spill  Fish and invertebrate community surveys  Fish “baseline” bioaccumulation surveys ◦ Lots of post-spill, periodic surveys over time  Fish, mayflies, birds, reptiles, amphibians, mammals, water, sediments, ash…  Bioaccumulation, ecological health, population surveys  Water, ash, sediment analyses  Chemical, physical, toxicological characteristics  Modeling ash transport, mixing w/ native sediments  Dissolution & redox kinetics 6

 Residual Ash Investigations (River EE/CA) ◦ Human Health & Ecological Risk Assessments ◦ Necessary investigations described in Sampling & Analysis Plan (SAP)  Supplemental Investigations ◦ Information for operations decisions ◦ Additional information relevant to risk assessments, NRDA 7

 Multiple Lines-of-Evidence ◦ Multiple Disciplines ◦ Multiple Organisms (cellular/organ/individual/population/community) ◦ Different Trophic levels  Multiple Participating Institutions ◦ TVA ◦ ORNL ◦ USACE-ERDC ◦ Nine Different Universities  Directly funded by TVA  ORAU-Administered grants ◦ Multiple Environmental Consulting Firms & Laboratories (Environmental Standards, Arcadis, RSI, Jacobs, TestAmerica, Pace, GLEC, EEUSA, Hydrosphere, Frontier Geosciences, GEL, RJLee Group, ALS, IML, and several others) 8

Sampling and Analysis Plan (SAP) supporting Baseline Ecological Risk Assessment Approved by EPA; sampling initiated in May 2010 Focus on potential sub-lethal, cumulative, long-term effects  Ash deposits  Submerged sediments  Seasonally-exposed sediments  Sediment pore waters  Sediment bioassays  Surface water  Ground water  Ash pore water  Benthic invertebrates  Fish  Wildlife  Aquatic vegetation

Field Work Completed: Surface water Ground water Ash pore water Seasonally-exposed sediment Wildlife Fish Benthic invertebrates Ash deposits Submerged sediment Sediment pore water Aquatic vegetation  Underway: Sediment bioassay Weekly status updates  Field work  Data verification and validation  Technical memoranda

SAP TASK (Appendix D Reference) FIELDWORK STATUSDATA STATUSTECH MEMO STATUS DATA VERFICATION/ VALIDATION PERCENTAGE 1. Ash Deposits - (SAP D- 1) Tennessee River Reaches A/B complete; Clinch River Reaches A, B, and Reference complete. Emory River Reach A and B complete; KIF Intake Channel complete; Emory River Reach C: 17/35 locations sampled for field PLM; 2 location sampled for lab PLM. Sampling and analysis continues. 18/20 lab COCs final- verified. Draft for TVA review 5/27/11; interim review of TN River A/B submitted to TVA; Clinch River A/B/Reference in draft. PLM – 100% verification of lab data 2. Seasonally - Exposed Sediments (SAP D-2) All sampling completed.PLM - 4/4 final-verified; GEL Rad - 5/7 validated, 2/7 verified; Frontier - PDF received, no EDDs received; TA Burlington - 3/7 validated, 4/7 verified, Nash - 8/11 verified Draft for TVA review 5/16/11.PLM – 100% verification; Metals/Hg – 20% validation, 80% verification; Radionuclides – 100% validation; PAH, PCBs, Pest – 100% validation; Cr(VI) – 100% validation; Metals Speciation – 100% validation 3a. Submerged sediment (SAP D-3/D-4) Tennessee River Reaches A/B completed. Clinch River Reaches A, B,and Reference completed. Emory River Reach A complete; Emory River Reach B complete; KIF Intake Channel complete; Emory River Reach C: 4/10 locations sampled for metals/mercury; 2/4 locations sampled for AVS/SEM; 1 location no recovery. Frontier - 2/13 verified; GEL - 8/13 validated, 2/13verified; Burlington - 2/13 validated, 9/13 verified; TAN - 4/39 validated, 13/39 final-verified, 12/39 verified; TAPitt - 5/15 verified Draft for TVA review 6/13/11Metals/Hg – 20% validation, 80% verification; Radionuclides – 100% validation; PAH, PCBs, Pest – 100% validation; ASV/SEM – 100% validation; Cr(VI) – 100% validation; Metals Speciation – 100% validation; TOC – 20% validation, 80% verification; Grain Size – 100% verificaton 3b. Submerged sediment bioassay (SAP D-3/D- 4) 8 Clinch River site locations and 2 Clinch River reference locations have been completed; replenishment water sampling ongoing. RSISED0211Y11 COCs - RJ Lee - final-verified; TAB, GEL, and TAN - verified Draft for TVA review 8/22/11100% verification PLM; 100% validation all other data. 4. Sediment/Porewater (SAP D-4) 8 Clinch River site locations completed, including re-attempt at CRM 4.5; 2 Clinch River reference locations completed. Porewater - TAN - 1/4 verified, deliverables being received. Residual Sediment - TAN - 4/4 final-verified, Frontier and RJ Lee - deliverables being received Draft for TVA review 7/5/11Metals/Hg/DOC/Hardness/Anions/Alkalinity – 100% verification; Do, pH, ORP, SC – 100% verification 5. Surface water (SAP D- 5) Eight weeks of sampling completed week of November 1.all data finalDraft submitted to TVA for review 3/7/11.Metals/Hg/TSS/TDS/DOC/Hardness - 100% verification; Radionuclides – 100% validation; Metals Speciation – 100% validation 6. Groundwater/Aquifer Testing (SAP D-6/D-7) Sampling of newly-installed wells completed 10/15; aquifer test results have been received. all data finalDraft for TVA review4/8/11.Metals/Hg/TSS/TDS/Anions/Ammonia GW 100% validation; TAN Geoprobe 100% verification; Radionuclides – 100% validation 7. Benthic Invertebrates (SAP D - 8) Fall collection was completed.Mayflies and snails at lab for analysis. Data to be reported over next couple of weeks. Draft for TVA review 8/24/11Metals – 100% validation 8. Fish (SAP D-9) Fall collection completed 10/22/2010. Additional fish collection completed. 85% validated 10% verified of metals data. Speciation, rad, pesticide/PCB analysis ongoing for Spring and Fall 2010 fish. Draft for TVA review 5/13/11Metals – 100% validation; PCB/Pes – 100% validation; Radionuclides – 100% validation 9. Wildlife (SAP D-10) Raccoon trapping suspended at reference locations. Locations being re-evaluated. Birds /2010 data final; 2011 collection ongoing; amphibians /2010 data final; 2011 collection ongoing turtles - 99% validated 1% verified: raccoons raccoons verified and in process of being validated, 2010 raccoons to ship to lab week of 4/4 Amphibians-3/22/11; Heron, Osprey, Geese- 3/15/11; Tree Swallows-4/15/11; Turtles 5/1/11; Raccoons-TBD; Metals – 100% validation 10. Aquatic Vegetation (SAP D-10) Sampling to be initiated 5/6/2011aquatic vegetation - not yet sampled; periphyton - not yet sampled Draft for TVA review 9/1/11Metals – 100% validation Status Date 3/30/2011 Weekly EE/CA Update

Sample Collection  May June 2011 Lab analysis, data validation  July July 2011 Technical memoranda  March September 2011 EE/CA Report Preparation  March June 2012 Interim Reporting  Technical memoranda  Ground Water Model Briefing  Interagency Data Briefing  Interagency Baseline Ecological Risk Assessment (BERA)/Removal Alternatives Preliminary Results: December 2011  Final BERA: May 2012

◦ Oak Ridge Associated Universities –Administered Grants:  Old Dominion (two studies)  North Carolina State University  Duke University/University of Kentucky/ University of Illinois  University of Colorado/USGS  Iowa State/Northwestern ◦ Direct contracts with:  Oak Ridge National Laboratory (ORNL)  USACE Engineer Research and Development Center (ERDC)  Virginia Tech  University of Tennessee  Appalachian State University

Results support both EE/CA and NRDA Quality Assurance Project Plans (QAPP) per CERCLA guidance Field Surveillances, lab audits 15

 Heron & Goose Eggs (March-April)  Spring sport fish survey (April-May)  Fish bioaccumulation, Spring fish reproductive survey, Larval fish (April—May)  Tree Swallows, Turtles (April—August)  Periphyton & aquatic vegetation (June-July)  Emory River sediment toxicity bioassays & porewater (March-May; June-- August)  Mayfly nymphs (April—June)  Mayfly adults, snails (June—August)  Raccoons (August—October)  Fish Bioaccumulation (October-November (December?))  Fish community, Benthic Community surveys (October-November)  Universities’ research surveys (various times, as scheduled by researchers) 16

Thousands of samples, multiple matrices… Using EQuIS software for tracking Chains of custody—automated lab data verification—data storage & management Laboratory specifications Full electronic data deliverables Raw data, as well as lab QA/QC results, field/method blank results, instrument calibrations, spike recoveries, etc. Electronic verification of lab data Completeness? Right analyses? QA results within specifications? Data validation Manual checks of calculations Review instrument blanks Check for reasonableness of results

“Hands-on” sample management  Weekly on-site status/prioritization meetings  Priorities for sampling, shipping, chemical analysis, data verification/validation  Status updates  Weekly laboratory teleconferences  Sample analysis sequence priorities  Resolution of analytical issues 18

Broad Range of Ecological Investigations Robust, Comprehensive: Multiple Lines of Evidence, Multiple Institutions, Multiple Trophic Levels, Assessing Cellular Level Through Population & Community-Level Responses Results Applicable to NRDA & Ecological Risk Assessment Rigorous Data Quality Requirements: QAPP, SOPs, data verification/validation, internal and external audits = fully defensible data “Hands-on” Sample Management: from planning through data validation

>8,300 samples (not counting air or Hydrolab data) 99.8% data acceptance Nine Universities Oak Ridge National Laboratory Corps of Engineers Engineer Research & Development Center Site-wide Quality Assurance Project Plan 60+ Standard Operating Procedures Laboratory and field audits Multiple Environmental Consulting Firms Multiple Environmental Laboratories 21