Behavior of the TTF2 RF Gun with long pulses and high repetition rates (TESLA note 2003-33) Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
First operation of the TTF2 injector with beam Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Hamburg, 16 Sept 2003.
CALCULATIONS OF THE LCLS INJECTOR USING ASTRA Jean-Paul Carneiro DESY Hamburg ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations.
Injector RF Design Review November 3, 2004 John Schmerge, SLAC LCLS RF Gun Thermal Analysis John Schmerge, SLAC November 3,
CC2 Input Coupler Introduction, Installation, & Processing Tim Koeth November 16 th, 2005.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Latest results from the upgraded PITZ facility Chase Boulware, DESY, Zeuthen, Germany, for the PITZ collaboration cathode laser conditioning test stand.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
Capture Cavity 2 Update Tim Koeth April 3 rd Testing at 4.5K.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
The Fermilab Photo-Injector Jean-Paul Carneiro (Fermilab & Université Paris XI) For the A0 group (N. Barov, M. Champion, D. Edwards, H. Edwards, J. Fuerst,
DESY superconducting SASE FEL’s Jean-Paul Carneiro DESY Hamburg.
Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
TTF2 Start-to-End Simulations Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Anders Sunesson RF Group ESS Accelerator Division
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
XFEL-INJ1/2 DUMPS Remarks / Requirements, Injector Beam Dynamic Review Meeting, DESY, Mon. 23. October 2006 ‹#› XFEL - INJ 1/2.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
A. Bross MICE CM17 February MuCool RF Program 805 and 201 MHz Studies.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
High Gradient RF Issues and 88 MHz test results M. Vretenar for the 88 MHz team: R. Garoby, F. Gerigk, J. Marques, C. Rossi, M. Vretenar -The.
Multipacting Simulation for the PITZ RF Photo Gun Igor Isaev Unwanted Beam Workshop 2012 Humboldt-University Berlin, The PITZ RF Photo Gun.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
ALBA RF Systems Francis Perez.
ESS RFQ B. POTTIN and RFQ team CEA-IRFU. RFQ design Strategy 3 RF codes to validate calculations Consideration of machining and assembly possibilities.
RFQ Cooling Schemes and Instrumentation PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Andrew Lambert - Engineering Division Lawrence Berkeley.
CSNS cryogenic system Institute of High Energy Physics Guoping Wang June 21, 2016.
Andrew Moss STFC, ASTeC Example amplifier control system Example of current STFC copper cavity in operation –Using SF6 insulated waveguide –Conditioning.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Areal RF Station A. Vardanyan
Dark current measurement at PITZ
by P. Musumeci and F.Tazzioli
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
A frequency choice for the SPL machine: Impact on hardware
NC Accelerator Structures
Test plan of ESS HB elliptical cavity
Accelerators in a new light
SPARC RF gun status by P. Musumeci Review committee
Test plan of ESS HB elliptical cavity
R&D Activity for Field Emission and Vertical EP
SNS Fundamental Power Coupler History
Wolfgang Anders, BESSY, Berlin
CW Operation of XFEL Modules
Main Coupler R&D at DESY
What did we learn from TTF1 FEL?
ATF 120 Hz Photocathode RF Gun Injection System Design Studies
Injector: What is needed to improve the beam quality?
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
CLIC Feasibility Demonstration at CTF3
System tests at CEA O. Piquet 19/03/2019
V. Veshcherevich Cornell University
RF introduction Anders Sunesson RF group leader
Presentation transcript:

Behavior of the TTF2 RF Gun with long pulses and high repetition rates (TESLA note ) Jean-Paul Carneiro DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004

TTF2 RF GUN SCHEMATIC (ANSYS, F. Marhauser) Jean-Paul CarneiroBehavior of the TTF2 RF with long pulses and high repetition rates. 14 water channels (1 in the back plane going twice around, 4 around the half cell, 7 around the full cell, 1 in the front plane and 1 in the iris making three loops around it) Max. water flow rate per channel: with max. flow velocity and channel cross section Total Maximum water flow rate : with

TTF2 RF GUNAT PITZ Jean-Paul CarneiroBehavior of the TTF2 RF with long pulses and high repetition rates.

Jean-Paul CarneiroBehavior of the TTF2 RF with long pulses and high repetition rates. INSTALLATION ZEUTHENHAMBURG We operated without interlock on the reflected power OK coming from the RF gun We operated at PITZ the TTF2 RF gun with 27 kW of mean power (10 Hz, 3 MW, 900 µs) which fulfils the TTF2 specifications The waveguides from the circulator to the RF gun window In preparation was filled with SF6 in order to avoid sparks Water temp. : Set Point 58 C to 61 C OK Incoming 58 C to 48 C Outgoing 58 C to 52 C Stability 0.1 C Water flow : Estimated : ~1.5 l/s Up to 3.6 l/s (water flow meter being installed at PITZ)

Jean-Paul CarneiroBehavior of the TTF2 RF with long pulses and high repetition rates. PITZ WATER SYSTEM

Up to 13.2 kW (10 Hz, 600 µs, 2.2 MW) At 10 Hz, 500 µs, 2.2 MW ΔT=(53.7 C-51.9 C)=1.8 C Jean-Paul CarneiroBehavior of the TTF2 RF with long pulses and high repetition rates.

Jean-Paul CarneiroBehavior of the TTF2 RF with long pulses and high repetition rates. Up to 13.2 kW / Comparison with ANSYS simulations

Jean-Paul CarneiroBehavior of the TTF2 RF with long pulses and high repetition rates. Up to 20 kW (10 Hz, 900 µs, 2.2 MW) Max Set Point Temp. of 64 C reached at ~ 20 kW. To go at higher mean power we decided to slightly remove the temp. probe in the iris.

Infrared camera observation of the RF Gun (10 Hz, 800 µs, 2.2 MW) Jean-Paul CarneiroBehavior of the TTF2 RF with long pulses and high repetition rates. Channels temp. stable at ~ 45.5 C, iris at ~35 C, body and waveguide at ~30 C while going from P=2.2 kW to P=17.6 kW.

Jean-Paul Carneiro STABILIZATION OF THE TEMPERATURE Behavior of the TTF2 RF with long pulses and high repetition rates. Stable operation going from 200 µs to 500 µs at 2.2 MW, 10 Hz reached in less than 5 mn. Should avoid getting more than 500 kW of reflected power. Easier to warm up the cavity rather than to cool it down. Reflected Power  Temperature (SP)  From 200 µs to 500 µs to 800 µs (2.2 MW, 10 Hz)

Jean-Paul Carneiro DETUNING OF THE RF GUN WITH LONG RF PULSES Behavior of the TTF2 RF with long pulses and high repetition rates. Reflected power

Jean-Paul Carneiro ANSYS SIMULATION AT 27 kW OF MEAN POWER Behavior of the TTF2 RF with long pulses and high repetition rates. We operated at PITZ the TTF2 RF gun at 10 Hz, 900 µs, 3.0 MW. Stable operation could be reached for ~ 2/3 minutes then vacuum interlocks. More conditioning is still needed at this mean power. (Temp probe 1 cm in the iris hole)

Jean-Paul Carneiro TOWARDS 50 HZ OPERATION (~130 kW MEAN POWER) Behavior of the TTF2 RF with long pulses and high repetition rates. At 50 Hz operation, ANSYS predicts temperatures in the waveguide iris of ~170 C and stresses of ~130 MPa which are not tolerable. The operation of the RF Gun at 50 Hz would necessitate adding more cooling channels. At 50 Hz, Cs2Te photocathode temp. is expected at 120 C which is OK.

Jean-Paul Carneiro RESUME K. Floettman, O. Krebs, S. Schreiber,DESY Hamburg J. Baehr, I. Bohnet, J.H. Han, M. Krasilnikov, D. Lipka, V. Miltchev, A. Oppelt, B. Petrossyan, F. Stephan, DESY Zeuthen M. v. Hartrott, F. Marhauser, BESSY Berlin Behavior of the TTF2 RF with long pulses and high repetition rates. Aknowledgment The TTF2 RF gun has been successfully tested at PITZ for 27 kW of mean power. More conditioning is needed at 27 kW of mean power to avoid vacuum interlocks. Compensation of the RF detuning should be tested.