Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 PSI-XFEL Challenges and Developments.

Slides:



Advertisements
Similar presentations
Haga clic para modificar el estilo de subtítulo del patrón © 2012 – Teldat GmbH – All rights reserved „Port Based Security“ – „Drop-In-Mode“ The ideal.
Advertisements

Australian Synchrotron Richard Farnsworth With Steven Banks and Mark Clift.
Dirk Zimoch for Babak Kalantari, EPICS Collaboration Meeting October SLS F illing P attern F eedback (FPF) system Charge Distribution Control in.
LCLS Control System Overview Mike Zelazny SLAC ICD Software Department Accelerator Directorate.
Channel Access Protocol Andrew Johnson Computer Scientist, AES Controls Group.
The applications of FA-M3 PLC used in SSRF ZHOU Dayong
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 Real-Time Data Transfer using the Timing System (Original slides and driver code by Babak Kalantari)
Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
16 - Nov. 2000EPICS Workshop Oak Ridge1 Epics to TINE translator Matthias Clausen, DESY Hamburg Phil Duval, DESY Hamburg Zoltan Kakucs, DESY Hamburg.
Terri Lahey LCLS FAC: Update on Security Issues 12 Nov 2008 SLAC National Accelerator Laboratory 1 Update on Security Issues LCLS.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
OPC Overview OPC Device Support (PLC Gateway for 3.14) Ralph Lange – EPICS Collaboration Meeting at SLAC, April 2005.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
R. Lange, M. Giacchini: Monitoring a Control System Using Nagios Monitoring a Control System Using Nagios Ralph Lange, BESSY – Mauro Giacchini, LNL.
Single Board Computers and Industrial PC Hardware at the CLS
Making connections Connecting a computer to a LAN donna Bair-Mundy.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
CLS: Control System E. Matias, R. Berg, G. Wright, T. Wilson, T. Johnson, R. Tanner and H. Zhang Canadian Light Source University of Saskatchewan Invited.
Ralph Lange: OPC Gateway (Device Support) OPC Gateway (Device Support) Ralph Lange – EPICS Collaboration Meeting March SSRF.
Redundancy. 2. Redundancy 2 the need for redundancy EPICS is a great software, but lacks redundancy support which is essential for some highly critical.
Dirk Zimoch, Pikett Training Channel Access Gateway.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
Remote Operation of Light Source Beamlines with (Free)NX Zhijian Yin, Peter Siddons, NSLS, BNL Controls at NSLS Facility Beamlines What Is NX, FreeNX Cybersecurity.
Dirk Zimoch, EPICS Collaboration Meeting October 2008 PSI Large Research Facilities Status SLS, Proton Facility, PROSCAN, PSI-XFEL.
Wir schaffen Wissen – heute für morgen Gateway (Redux) PSI - GFA Controls IT Alain Bertrand Renata Krempaska, Hubert Lutz, Matteo Provenzano, Dirk Zimoch.
Low Emittance RF Gun Developments for PAL-XFEL
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Overview of PAL XFEL Project October 22, 2012 EPICS Collaboration Meeting In Soo Ko on behalf of PAL XFEL Team.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
Oct 8-9, 2005ACS Collaboration Meeting – Archamps, France The MicroIOC From Custom To Production First customer: PSI 25 pieces.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Timo Korhonen (PSI/GFA Controls) Plans for the SwissFEL Control System EPICS Meeting, BNL.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
The recent history and current state of the linac control system Tom Himel Dec 1,
Reliability/ Secure IOC / Outlook M. Clausen / DESY 1 Reliability Secure IOC DESY Outlook Matthias Clausen DESY/ MKS.
EPICS EPICS Collaboration Meeting Argonne June 2006 IOC Redundancy: Redundancy Monitor Task EPICS Meeting - Redundancy Argonne, June 16, 2006 Matthias.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Jefferson Lab Report Karen S. White 11/14/00. Overview  Status of Jefferson Lab Control System  Work In Progress  Transitioning to Operations.
Ralph Lange: CA Gateway Update CA Gateway Update Ralph Lange – EPICS Collaboration Meeting March SSRF.
1 1999/Ph 514: Channel Access Configuration EPICS Channel Access Configuration Andrew Johnson APS.
2/20/2016J-PARC1 Virtual Accelerator An Accelerator Simulator.
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
Interfacing to the CLS Control System Canadian Light Source University of Saskatchewan.
Elke Zimoch, EPICS Workshop 2004 Japan EPICS at the Protein Crystallography Beamlines of the SLS.
Adrian Oates Graham Cox Daresbury Laboratory MICE Control System DL Contribution June 09.
An Introduction to Epics/Tango Steve Hunt Alceli EPICS Meeting 2008 INFN Legnaro 15 Oct 17:15.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
Monitoring Dynamic IOC Installations Using the alive Record Dohn Arms Beamline Controls & Data Acquisition Group Advanced Photon Source.
Dirk Zimoch, EPICS Collaboration Meeting October SLS Beamline Networks and Data Storage.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
Operations Machine Simulator.
Laboratorio per dottorandi 2017 Particle Accelerators Control System
SNS Status Report Karen S. White 10/15/08.
Beam-Synchronous Data Acquisition (BS-DAQ)
SLS Timing Master Timo Korhonen, PSI.
LabVIEW EPICS Client I/O Server
DC Injector and Space Charge Simulation Status
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt,
Control System Network
Advanced Research Electron Accelerator Laboratory
A Virtual Implementation of VELA (CLARA)
Device support for VMIVME-5565 and its usage at KEK
Presentation transcript:

Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 PSI-XFEL Challenges and Developments

Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 PSI-XFEL XFEL Project Schedule 250 MeV Test Injector until fall 2010 PSI-XFEL construction start spring 2011 Gun Test until summer MeV Test until spring 2009 continued ? ? ■ Have to support 3 machines at the same time! ► Lots of diagnostics ► Frequent modifications

Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 PSI-XFEL 250 MeV Injector Construction Site

Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 PSI-XFEL Control Room

Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 PSI-XFEL 250 MeV Injector in Numbers ■ 48 VME IOCs ► RF IOCs: 21 ► Magnet IOCs: 2 ► Timing IOC: 1 ► Diagnostics IOCs: 24 ■ 15 PC IOCs ► Vacuum IOC: 1 ► Diagnostics IOCs: camera servers ■ We expect a factor of 10 for "the real thing"

Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 PSI-XFEL Networking ■ Class A subnets preferred ► maintainability issues ► fear of broadcast traffic ■ But 500 IOCs do not fit into one subnet ■ How to split the network? ► By system? (RF, magnets, diagnostics, …) ► By sector? (gun, buncher, linac, …) ► Where to put the control room?

Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 PSI-XFEL backbone network (control room, central IOCs) Network Layout... EPICS non EPICS gunlinac 1linac nundulators beamline 1 beamline n vacuum system PLCs machine interlock system PLCs web cameras VLAN router... Does this make sense? CAGW

Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 PSI-XFEL Gateway Reliability ■ Runs stable at SLS ► 16 beamline networks (up to 3000 channels) ► readonly office network gateway (up to channels) ■ Virtual machines (vmWare) on high reliability blade system ■ Found problems with waveforms ► 10 records x 2000 doubles x 10Hz ► Waveforms came though but all scalars were dropped ► Solution: increase vxWorks TCP queue size! (8k → 64k) ► Is the gateway too slow reading waveforms?