HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
LV and HV status of the RPC system RPC detector and trigger group.
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
Low Voltage LB status RPC detector and trigger group.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
G. Dissertori ETH Zürich ECAL - DCS 1 ECAL G. Dissertori DCS Coordination Board, Nov 10, 2004 Status report Trigger/DAQ project  DCS.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
19/10/11FV 1 Behavior of generic HV channel. Mail’s survey: appeal for general policy VF2 19/10/11 Patrizia: “Based on the running experience of NA48,
Helen Heath, Magnus Loutit.  Useful meetings at CERN before Easter ◦ ML and HH met with John Fullerton from BE for practical advice on the CEDAR motor.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
INSIDE in-beam PET system assembly and test at INFN Torino
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
Monitoring system commissioning
Injectors BLM system: PS Ring installation at EYETS
ATLAS MDT HV – LV Detector Control System (DCS)
RPC Barrel HV & LV system Lappeenranta University
CMS-ECAL DCS Prototype
352MHz Klystron Control for the 3MeV Linac test stand
DT Infrastructure: LV, HV, Gas
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

HV Report F.Cavallari (INFN Roma)

High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1 blue cable from Crate to Patch-Panel (could connect up to 9 channels) 2 cables from PP to FFB. Several small cables to distribute the HV to the VFE boards. Connection to the Temperature Interlock from Belgrade University (ramps down HV and then turns off LV)

High Voltage set-up in SM0 34 channels 1 Crate hosting 4 boards 4 blue cables from Crate to Patch-Panel 34 cables from PP to FFB Several small cables to distribute the HV to the VFE boards. Connection to the Temperature Interlock from Belgrade University (ramps down HV and then turns off LV) will switch off the full SuperModule

HV crate and board A1520E board SYS1527

HV Control and Monitoring PC OPC Server Labview Program

HV Control and Monitoring Program developed by Peter Cogan (Ireland)

HV Control and Monitoring Some problems of comunication between the PC and the OPC server were observed due to the PC being too old or to the software (?) now under investigation… A new PC has been bought dedicated to HV monitoring and control for next year

HV Control and Monitoring The software will be upgraded in 2 phases: 1)Labview program upgrade from 2 channels to 1SM 2)If manpower is sufficient we will develop a test- program with PVSSII

HV stability during 2002 test-beam HV Monitored by the crate is of course very stable 2 mV Monitoring problems not HV problems

¨HV trips¨ in 2002 test-beam During the first week of september a few HV trips occurred. No error status was appearing from the crate. After some investigation we thought it could be noise on the external Temperature-interlock cable (40 metres). After disconnection of the cable no problem was observed for 3 days. So reconnection of the cable with a T+50 Ohm. No problem after 6/9 until end of november Very prompt and kind intervention of CAEN experts to help understand the problem and follow the evolution.

¨HV trips¨ in 2002 test-beam 1.8/8 rack cooling problem 2.14/8 3.16/8 4.28/8 (2) 5.30/8 6.1/9 7.2/9 8.6/9 power cut

Setting time of the APD current When HV is OFF->ON it takes approx. 10 minutes to stabilize the current P3=1/  (h -1 ) Setting time = few minutes Dedicated runs to understand stabilization time of the APD laser signal taken 25/11 will be analized soon

Current during the pion run in-beam current measurements

Conclusions 1.Very good performance of the HV system during the 2002 data-taking 2.In 2003 we will be ready for SM0 run