Prototype Development of Automated Ring Main Unit System

Slides:



Advertisements
Similar presentations
Variable Frequency Drives Bypass Options
Advertisements

Fatigue testing machine
Distributed Intelligence Provides Self-Healing for the Grid
DARSI 2 CDR Adrienne Baile Preston Schipper Matt Hulse Project Overview Components: Design Status Administrative Data Acquisition & Real-time System Integration.
HYDRAULICS & PNEUMATICS
Asahi/America New Positioners: Pneumatic Actuators-Westlock P-10,K-10 Electric Actuators-Peaktronics-DHC- 100 Competitor Comparison Positioners.
©2011, The McGraw-Hill Companies, Inc. Chapter 4.
Guitar Neck Duplicator By Eric Hall. Background  Difficult to Replicate  Time Consuming  Generally done by hand.
ECE 480 Design Team 3 Doug’s Kitchen Robot Team Members - Thomas Manner - Ali Alsatarwah - Ka Kei Yeung - Daniel Phan Team Facilitator - Professor Lixin.
EASELECTRIC Team 4 Adam Frank Jackie Jon. Introduction NSF Program: Expanding world of disabled artists Growing demand for adjustable easels Disabilities.
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
2 Problem Definition Background: Boeing’s Auburn Plant manufactures airplane wing spars which are the primary structural component that runs the length.
P11310: Parabolic Dish Autopoint Solution Project Family Team Leader: Trae Rogers (ME) Project Engineer: Pat Ryan (EE) Kyle Norlin (ME) Chris Reed (CE)
Microcontroller Position Sensors 1-3 Temp Sensor M Increment Motors Manual Override Power Motor Controller System Diagram.
Optical Stage Redesign Team 4025 Senior Design II – Spring
Cover Your A$$ets Solar Panel Protection Project Team: Krista Miller Sohaib Hasan John Helme.
Thermal Solar Panel Protection Project Team: Krista Miller Sohaib Hasan John Helme.
Multi-function apparatus for secondary distribution
Conveyor Control using PLC, VFD, and Sensor
Preliminary Design Review Automatic Windshield Wiper System Michael Whitfield Anthony Harris Renaud Moussounda Eric Williams.
Overview of the 1.
Electro-Pneumatics Module 1
Systems Approach Burglar Alarm Project PROBLEM SITUATION DESIGN
Motor Vehicle Level 3 Electronics and Electronic Components Resource 1.
Involve to Solve Slide No. 1 Copyright © 2006 TNB Research Development of Automatic Rack-In & Rack-Out System for Vacuum Circuit Breaker Presentation on.
THE ULTIMATE TAILGATE SENIOR DESIGN: P10811 High Level Design Meets or exceeds functions and capacities of stock tailgate Provide a flat work surface for.
ET 494 Instructor: Dr. Koutsougeras By Scott Dauzat Advised by Dr. Ma.
DUAL POWER SUPPLY MODULE
Trax Technologies Inc. Wireless Home Phone-Operated Assistant.
Pratham Presenters: Fraterno Vila and Gabriel Letona Pratham Electronics and Distribution Presenters: Fraterno Vila and Gabriel Letona Team Leader: Matt.
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
Lexium SD2 and Lexium SD3 Stepper Drives and Motors -Lexium SD2 - two-phase range up to 9.2 Nm -Lexium SD3 - three-phase range up to 19.7 Nm.
Page 1 International Future Energy Challenge Integrated starter/alternator topic IFEC ‘07.
The Voice Operated and Wirelessly Controlled Elevator Jeremy Hester Advisor: Mohammad Saadeh Class: ET 493 – 01 Class Professor: Dr. Cris Koutsougeras.
Camera Body and Mechanisms 16 September 2008 Martin Nordby, Pierre Antilogus, Gordon Bowden.
PowerIT Air Insulated Cubicle Uniswitch
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Automation Presentation to KIB-TEK, Northern Cyprus (19/09/2007)
Chiller control system Lukasz Zwalinski – PH/DT.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Sophisticated Design Automatic Tailgate Final Presentation December 5, 2001 Ted Akiskalos June Doan Tarek Elshazly Maggie Kim David Nimitz Sharon Ramey.
Name Of The College & Dept
VCBs are well protected with interlocking switches for its switching device operation with busbar. Switching devices in VCBs have to be disabled or enable.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Electrical and Computer Engineering Cumulative Design Review Team 22: Driver Assist.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
ACT20X Ex isolator/ amplifier. Page 2 ACT20X (Ex isolators family) Overview - Connects to process equipment in Class/Div, or Zone 0 - Zone 2 areas - ACT20X.
OEZ s.r.o. Quick and universal solution for your order Modeion 05/2012.
Virtual Lab on Automation Systems A Proposal under Mechatronics Laboratory Presented By Tanuja Sheorey PDPM IIITDM Jabalpur.
AUTOMATED ROD SINGULATION SYSTEM Student: James Welch Concentration: Mechanical Class: ET-494 Spring 2015 Instructor: Dr. Cris Koutsougeras Advisors: Dr.
Prototype Wind Turbine Presentation by – Anthony Benasco Brody Holloway Hulon Reid Advisors – Dr. Cris Koutsougeras Dr. Junkun Ma Senior Design Teacher.
Group #3 RC Ghost Rider Adolph Arieux (EE) James Russick (EE) Paul Shimei (EE) Sponsored by: Workforce Central Florida Mentor: Richard Barrett - ITT.
Prototype Development of Automated Ring Main Unit System Second Technical Meeting.
Prototype Development of Automated Ring Main Unit System
Planetary Lander PDR Team Name
Wegmans Swirl Cake Automation
SCADA for Remote Industrial Plant
02/24/2004.
OVERVIEW Impact of Modelling and simulation in Mechatronics system
EOS™ 500 Roller Shading System
Oliver SCHROEDEL, Michael SCHWAN, Sven KOEPPE, Robert ROSENBERGER
НОВИЙ ВАКУУМНИЙ КОНТАКТОР З ВЕРТИКАЛЬНИМ РОЗТАШУВАННЯМ ПОЛЮСІВ, ВЕРТИКАЛЬНИМ РОЗТАШУВАННЯМ АКТУАТОРА ТА МІКРОПРОЦЕСОРНОЮ СИСТЕМОЮ КЕРУВАННЯ КЛИМЕНКО Борис.
Name Of The College & Dept
Cyber Security of SCADA Systems Remote Terminal Units (RTU)
What IS Relay?.
Fluid Power System Electrical Control
Presentation transcript:

Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Project Background

RMUs Presently Used What is an RMU? Who operates it? Are there safety concerns?

RMU Operation Opening/closing of the load break switch or earthing switch: Key/lever Pushed to overcome spring force Turn 90˚ at ~20 N.m (clockwise or counter-clockwise depending on usage) Who operates it? Are there safety concerns? Can it function remotely?

Project Objectives To design a motorized retrofit for automatic operation of (F&G*) Ring Main Unit (RMU) as per technical specifications provided by TNB Distribution.

Customer Requirements ??

Deliverables A prototype RMU Motorization Unit for operation of manually operated F&G* Ring Main Units.

Project Impact The proposed system would be able to switch the RMU breakers in a safe manner via remote control. Reduce downtime via remote operation and enhance the safety of TNB’s personnel by eliminating the need for manual operation of the RMU.

Project Methodology Stages of prototype development: Torque and dimension measurements Study of Actuation Mechanism Grip frame design and material selection Sensors & Alignment Power & Controls Testing & Trials

RMU Automation Operational Block Diagram Auto/Remote Manual push relays & Indicators Local/Manual CW Local/Manual CCW M1 Power Supply Unit Motor Driver w max current limit M2 28VDC 10A CW/CCW control signal M3 Microcontroller Load switch limit switch SCADA

Components List Power supply unit Grip Frame Motor Mounting Rails Assembly Programmable Logic Controller Motor Driver/controller Auto/Manual Cam Selector Switch Push Power Relays Limit/position Sensors Geared DC Motors Miscellaneous

Features Light-weight (require only one person for mounting & installation) Simple gripping and holding mechanism Ready for remote and local operation Completely detachable motor unit for manual operation Continuous Breaker load switch status indicator Motor over-current protection Response time of < 5 seconds Motor interlock operation

Estimated Costing* per 2+1 RMU (3 motor set) Mechanical works (motor mounting and grip frame) – ~ RM1300 Geared motors – 3 x RM700 Controller – RM400 Motor driver – RM700 Sensors and electronics components – RM400 Power Supply Unit – RM900 (for prototype only) TOTAL COST – ~RM5000 (without PSU) * For large quantities of order

Initial survey and testing in ILSAS Load breaker switch sizing Initial motor selection

Continuation of motor selection Motor mount and torque testing

Testing torque capability DC Motor on mount

A closer look at the Motor Mounting Rail Assembly

Further testing on actual F&G RMU

Procurement of Test Bed RMU

Installation of Mount on Grip Frame

Motor mount installed on grip frame on an F&G RMU

Rear view of gripping clamp

F&G ZZTT and ZZT RMUs in UNITEN ZZT F&G RMU ZZTT F&G RMU

Grip Frame

Detachable Motor Mounting Rail Assembly

Motor Selection and Testing – ILSAS 30VDC Circuit Breaker Motor

Gearbox Failure – Specified Torque 25N-m

Switching Key Failure

Testing on RMUs in UNITEN

Motor Mounting Rail Assembly Play Video

Motor Mounting Rail Assembly Play Video

Questions & Discussions Thank you. Questions & Discussions

Timeline Month 1 Month 2 Month 3 Month 4 Actuation Mechanism Assy Fabrication and assy Test and Trials Cross Slide Traversing Assy Design and Procurement Fabrication Actuation and Cross slide integration Sensors & Alignment Selection Procurement Integration Power & Controls System Selection and Procurement Programming Networking and Communication PDSB

Uniten Procurement Procedures 2. Prepare Tech. Spec. 1. Fill PR Form Requestor Officer-in-Charge approves requirements availability of budget Finance verifies Approval of PR Approving Authority (PR) : ≤ RM 5K - Dean ≤ RM 100 K - TNC > RM 100 K - NC Quotation / Tender Call for Endorsement by Dean / HOS Evaluation with Approval / Award ≤ RM 1 K - Dean ≤ RM 5 K - College Tender Committee ≤ RM 10 K - NC ≤ RM 500 K - TNC(P) Tender Committee Create PO ≤RM 5 K : Procurement Manager ≤ RM 100 K : TNC(P) > RM 100 K : NC Supplier delivers product / provide service Quotation Value: ≤ RM 100 K Float period: 3 - 14 days Min. : 3 companies Tender Value: > RM 100 K Float period: 14 - 21 days Min. : 5 companies