Peter-Raymond Kettle MEG Review February 2007 1 Cockcroft-Walton Status Carlo Bemporad Angela Papa Giovanni Signorelli Peter-Raymond Kettle Carlo Bemporad.

Slides:



Advertisements
Similar presentations
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
Kathleen Ratcliffe LTU Installation October 30, LTU Installation Coordination Kathleen Ratcliffe.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 PSI 27/6/2006 C.Bemporad “THE TAMING OF MEG” News on Calibration Methods Cockcroft-Walton Accelerator  -sources on wire  -lines from neutron capture.
Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
1 Implications Of Infrastructure Build The Infrastructure Project is bigger than anyone thought, but now it’s understood The cost was underestimated, but.
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Linac 4 PSB BI LTB LT L4T m from PIMS to foil: m new line (to BHZ20) m present Linac2 line Active elements : 4+2bendings; quads,
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
News from DESY. Joachim Mnich Plenary ECFA CERN November 20, 2014 XFEL PETRA III & FLASH II Particle Physics DESY Test beam.
Tokyo - Topical Meeting, March Peter-Raymond Kettle Beam Line Update End-Caps End-Caps Insertion System Insertion System Target System Target System.
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Peter-Raymond Kettle Tokyo - Topical Meeting, March Beam Monitoring Basis for Discussion only Beam Rate Beam Rate Beam Profile Beam Profile Beam.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Peter-Raymond Kettle MEG Review February BeamBeam LineLine StatusStatus.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
P.-R. KettleMEG Review January MEG – Beam Line Studies Present Status & Overview since July 2002.
Maria J. G. Borge Beam Lines for HIE-ISOLDE. Status of HIE-ISOLDE 2 May 2010: 34 LoI submitted 1 Nov 2012: INTC endorsed the increase of 2 GeV-proton.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
MEG I Accounting & Retrospective Peter-Raymond KettleMEG Fukuoka Meeting October
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
ELENA installation progress F. Butin / ELENA collaboration.
Peter-Raymond KettleMEG Fortnightly Meeting 16/5/20071 Beam Schedule Update.
High energy beam transport.
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
Francois and Lau EATM 17 July 2012
Testing of SC Magnets Status - November 2010
Advanced Research Electron Accelerator Laboratory
The Bunker Project Overview Zvonko Lazic
Presentation transcript:

Peter-Raymond Kettle MEG Review February Cockcroft-Walton Status Carlo Bemporad Angela Papa Giovanni Signorelli Peter-Raymond Kettle Carlo Bemporad Angela Papa Giovanni Signorelli Peter-Raymond Kettle

MEG Review February Overview Machine Production Status & Schedule Machine Production Status & Schedule C-W Area + Beam Line Status & Schedule C-W Area + Beam Line Status & Schedule Integration into Beam Schedule 2007 Integration into Beam Schedule 2007

Peter-Raymond KettleMEG Review February Machine Status original Completion Date: original Completion Date: ~ mid-May 2007 ~ mid-May 2007 NEW Completion Date: NEW Completion Date: ~ end-February & expected ~ end-February & expected Ready for testing mid-April ~ 2007 original Completion Date: original Completion Date: ~ mid-May 2007 ~ mid-May 2007 NEW Completion Date: NEW Completion Date: ~ end-February & expected ~ end-February & expected Ready for testing mid-April ~ 2007 MEG C-W. StatusEnd2006 StatusEnd2006

Peter-Raymond KettleMEG Review February Bellows system Tested ready for shipment Bellows system Tested ready for shipment Beam Elements available Beam Elements available Power Supplies available Power Supplies available Beam Diagnostic Elements Beam Diagnostic Elements ( shutter, diaphragms, x-, y-slits, quartz crystal+TV-camera) ( shutter, diaphragms, x-, y-slits, quartz crystal+TV-camera) available or almost ready available or almost ready Bellows system Tested ready for shipment Bellows system Tested ready for shipment Beam Elements available Beam Elements available Power Supplies available Power Supplies available Beam Diagnostic Elements Beam Diagnostic Elements ( shutter, diaphragms, x-, y-slits, quartz crystal+TV-camera) ( shutter, diaphragms, x-, y-slits, quartz crystal+TV-camera) available or almost ready available or almost ready Beam Line Components C-WC-W ComponentsSection Quadrupole Doublet Quadrupole Doublet x-, y-Steering Magnets x-, y-Steering Magnets beam Shutter + Slits beam Shutter + Slits Quadrupole Doublet Quadrupole Doublet x-, y-Steering Magnets x-, y-Steering Magnets beam Shutter + Slits beam Shutter + Slits BellowsSection Bellows System with stroke of ~ 2.2m drives COBRA Insertion System to place target at centre of COBRA Magnet Bellows System with stroke of ~ 2.2m drives COBRA Insertion System to place target at centre of COBRA Magnet TargetSupportTargetSupport LiF Target holder + LiF Target holder + vacuum chamber vacuum chamber LiF Target holder + LiF Target holder + vacuum chamber vacuum chamber

Peter-Raymond KettleMEG Review February Machine Schedule Completion of manufacture ~ end-February 2007 Completion of manufacture ~ end-February 2007 Acceptance Tests in Amersfoort NL (or PSI) Acceptance Tests in Amersfoort NL (or PSI) with HVEE, INFN, PSI ~ mid-April 2007 ? with HVEE, INFN, PSI ~ mid-April 2007 ? Shipment to PSI ~ end-April ? Shipment to PSI ~ end-April ? Machine Installation + Machine Installation + Shipment/Guarantee Test ~ mid-April to mid-May 2007 Shipment/Guarantee Test ~ mid-April to mid-May 2007 Completion of manufacture ~ end-February 2007 Completion of manufacture ~ end-February 2007 Acceptance Tests in Amersfoort NL (or PSI) Acceptance Tests in Amersfoort NL (or PSI) with HVEE, INFN, PSI ~ mid-April 2007 ? with HVEE, INFN, PSI ~ mid-April 2007 ? Shipment to PSI ~ end-April ? Shipment to PSI ~ end-April ? Machine Installation + Machine Installation + Shipment/Guarantee Test ~ mid-April to mid-May 2007 Shipment/Guarantee Test ~ mid-April to mid-May 2007

Peter-Raymond KettleMEG Review February Cockcroft-Walton Area C-W AREA: C-W AREA: Area presented Nov at Area presented Nov at Coordination Committee Research Coordination Committee Research Area West Area West Officially in Shutdown Programme Officially in Shutdown Programme area & infrastructure planned be area & infrastructure planned be installed by the end of Shutdown installed by the end of Shutdown beam-axis extension survey end 2006 beam-axis extension survey end 2006 infrastructure groups + Health Physics infrastructure groups + Health Physics notified – need Ministry of Health notified – need Ministry of Health clearance for the new area + C-W clearance for the new area + C-W  M3 shielding to be removed now to  M3 shielding to be removed now to check space check space more detailed meetings still needed to more detailed meetings still needed to finalize all points (Interlock system) finalize all points (Interlock system)

Peter-Raymond KettleMEG Review February Cockcroft-Walton Area cont. Constraints Safety System + Safety System + Electrical Infrastructure Electrical Infrastructure unaltered unaltered Permanent Access from Permanent Access from outside outsideConstraints Safety System + Safety System + Electrical Infrastructure Electrical Infrastructure unaltered unaltered Permanent Access from Permanent Access from outside outside  M3 Shielding Must be MODIFIED  M3 Shielding Must be MODIFIED  E5 Zone  E5 Shielding Wall needs modifying  E5 Shielding Wall needs modifying Approx. form C-W Area Approx. form C-W Area

Peter-Raymond KettleMEG Review February C-W Area Layout Virtually all Standard Concrete Blocks Virtually all Standard Concrete Blocks StillProblematicStillProblematic

Peter-Raymond KettleMEG Review February C-W Area Shielding Planned Work needed for Completion (By mid-April) (By mid-April) removal of walls + measure & removal of walls + measure & layout check - freeze design layout check - freeze design order special shielding + start order special shielding + start standard shielding construction standard shielding construction infrastructure completion: infrastructure completion: water, compressed-air, power water, compressed-air, power Safety systems completion (Interlock) Safety systems completion (Interlock) Ministry of Health Approval Ministry of Health Approval test of Safety System (Beg. April) test of Safety System (Beg. April)

Peter-Raymond KettleMEG Review February Testing & Integration into Beam Schedule Full test with LiF-target only possible when: area + safety aspects completed area + safety aspects completed C-W beam line components magnets, vacuum chambers etc. at PSI C-W beam line components magnets, vacuum chambers etc. at PSI C-W Bellows System at PSI (will arrive soon storage arranged) C-W Bellows System at PSI (will arrive soon storage arranged) target prepared target preparedCONSTRAINTS: cannot be tested in parallel with Beam Commissioning cannot be tested in parallel with Beam Commissioning bellows system cannot be placed in zone DC insertion system needed bellows system cannot be placed in zone DC insertion system needed C-W Bellows System cannot be in place during any DS Insertion C-W Bellows System cannot be in place during any DS Insertion TCs or DCs or End-Cap installation/removal !!! TCs or DCs or End-Cap installation/removal !!! Proposed Commissioning mid-April – mid-June Proposed Commissioning mid-April – mid-June  SEE Proposed Beam Schedule 2007  SEE Proposed Beam Schedule 2007 Full test with LiF-target only possible when: area + safety aspects completed area + safety aspects completed C-W beam line components magnets, vacuum chambers etc. at PSI C-W beam line components magnets, vacuum chambers etc. at PSI C-W Bellows System at PSI (will arrive soon storage arranged) C-W Bellows System at PSI (will arrive soon storage arranged) target prepared target preparedCONSTRAINTS: cannot be tested in parallel with Beam Commissioning cannot be tested in parallel with Beam Commissioning bellows system cannot be placed in zone DC insertion system needed bellows system cannot be placed in zone DC insertion system needed C-W Bellows System cannot be in place during any DS Insertion C-W Bellows System cannot be in place during any DS Insertion TCs or DCs or End-Cap installation/removal !!! TCs or DCs or End-Cap installation/removal !!! Proposed Commissioning mid-April – mid-June Proposed Commissioning mid-April – mid-June  SEE Proposed Beam Schedule 2007  SEE Proposed Beam Schedule 2007