27/10/2009 1 PHOS Cooling status (1-27 Oct) Brief History: 28 Sep start cool down. Steps (by liquid) was: +17, +5, -3, -10, -15,

Slides:



Advertisements
Similar presentations
MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
Advertisements

Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
Daikin Altherma™ Troubling Shooting
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
WebStat™ Programming and Configuration of Thermostats.
André Augustinus 16 June 2003 DCS Workshop Safety.
Perform Control Test. Check for Consistent Liquid Temperatures Entering and Leaving Liquid Temperatures should be close when the water pumps are on but.
Installation and Initial Start Up by Martin Noska, Service Engineer, Aftersales & Service.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Data Logging GCSE ICT. Learning Intentions: To explore the tern data logging. To explore the concept of analogue and digital data and the need for conversion.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
Pool system components - solar collectors - Temperature probes relief pool - Solar pump system - Pump filtration system - Relief valve - air temperature.
„ Save Energy and Resources with BRAUMAT Analysis and Options.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
Progress Report on CGSE Control System Project Team of SJTU for AMS-02 Yang Yupu AMS JSC, Jan 8-12, 2007.
Settings & Adjustments. Settings & Adjustments.
Air Conditioning Heating Refrigeration
MCS’S MAGNUM DIAGNOSTICS PACKAGE Visit us at
Power Control System for a Concrete Durability Test Cabinet – Phase 2 Jacob Jameson Madhav Kothapalli Thomas Persinger Andrew Versluys.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
EEV-KIT For Single refrigeration system. Preliminary information, all of contents are subject to final confirmation by MHI 2 Contents 1. Single refrigeration.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
Maciej Ostręga Michal Zimny IBL CO 2 cooling progress meeting
PLC Based sequential batch process CONTROL system
20/10/ PHOS Cooling status (1-20 Oct) Brief 28 Sep start cool down. Steps was: +5, -3, -10, -15, -20, -25, -30°C (by liquid).
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
TECHNICAL TRAINING SMART COMMANDER System Requirements CPU : 800MHz and aboveCPU : 800MHz and above Memory : 256MB RAM or HigherMemory : 256MB.
Some notes about liquid Hydrogen target 1.How it operates 2.Modification Target length, empty mode 4.Status.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
PHOS DCS guide (for PVSS based products only) Alexander Mamonov Last update: 1 th October, 2010.
01/10/ PHOS Cooling status (1 Oct) Incident happened (ECV failure) 1 Oct at 5 Am cooling plant failure happened: ECV (electrical.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 9 October 2006 Interlocks update.
CUE – Make Any Pump an E-Pump
Hydro Multi-B – (2) or (3) CME Pumps in Parallel
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
CO2 progress and issues on the control system Lukasz Zwalinski – PH/DT
CISSP Common Body of Knowledge Review by Alfred Ouyang is licensed under the Creative Commons Attribution-NonCommercial-ShareAlike 3.0 Unported License.
60kW Thermosiphon control system
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
Helen Heath, Magnus Loutit.  Useful meetings at CERN before Easter ◦ ML and HH met with John Fullerton from BE for practical advice on the CEDAR motor.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
Pixel Action Matrix C. Newsom July 15, Overview Critical Parameters Initial Discussion – Top 6 critical failures Discussion - Detailed Documentation.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
Air condition installation
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
IBBelle: Status & Plans
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Rosario Turrisi INFN Padova
SCADA for Remote Industrial Plant
How SCADA Systems Work?.
DEMAND COOLING Copeland Discus Demand Cooling
Control System Summary of Changes Since PDR
Charge 2. Equipment Protection 3. Definition and Documentation
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
NRL NRL - Welcome to the NRK Sales Training Program
NRL NRL - Welcome to the NRL Sales Training Program
Presentation transcript:

27/10/ PHOS Cooling status (1-27 Oct) Brief History: 28 Sep start cool down. Steps (by liquid) was: +17, +5, -3, -10, -15, -20, -25, -30, -29.5°C. 2 interlocks happened and was fixed: – 1 Oct – alarm on ECV controller battery fail, fixed; – 19 Oct – alarm on low pump cover temperature threshold, fixed. At the moment (27 Oct): Nominal PHOS stabilization temperature achieved. Temperature (by Pt100 sensors): Cooling liquid (C 6 F 14 ): ± 0.06°C PWO2: °C,PWO3: °C,PWO4: °C FEE2: °C,FEE3: °C,FEE4: °C. Humidity (by 3×PWO + 2×FEE sensors): PWO2: 42,46,23%,PWO3: 43,43,29%,PWO4: 64,38,26% FEE2: 7,4%,FEE3: 12,16%,FEE4: 7,8% Liquid level in receiver tank ~53 Liters.

27/10/ PHOS Cooling status (1-27 Oct) PHOS temperatures (overview) Nominal stabilization temperature achieved 21 Oct cooling liquid (C 6 F 14 ) FEE2FEE3 FEE4 PWO2 PWO3PWO4 Interlock 1 Oct. Interlock 19 Oct.

27/10/ PHOS Cooling status (1-27 Oct) PHOS temperatures (details) In constant FEE state ± 0.1°C PWO stability shown cooling liquid (C 6 F 14 ) PWO2 PWO3 PWO4 Stability of cooling liquid average (per control cycle) temperature are: ± 0.06°C FEE switch on/off cause temperature variations PWO3 temperature 0.5°C higher then PWO2,PWO4 (why?) Temperature difference between PWO and cooling liquid is about 4.5°C

27/10/ PHOS Cooling status (1-27 Oct) Cooling liquid level ~53 L Temperature effect + (possible) leak ~1 L/week (?) +5 ° C -3 ° C -25 ° C -10 ° C -30 ° C -20 ° C -15 ° C Interlock 19 Oct by pump cover temperature Interlock 1 Oct by ECV controller battery, +25°C -5 ° C ~3 Litres of C 6 F 14 filled 21 Oct Now ~53.3 Litres Need more time to eastimate leak

27/10/ PHOS Cooling status (1-27 Oct) PHOS-2 humidity FEE2 PWO2

27/10/ PHOS Cooling status (1-27 Oct) PHOS-3 humidity FEE3 PWO3

27/10/ PHOS Cooling status (1-27 Oct) PHOS-4 humidity FEE4 PWO4

27/10/ PHOS Cooling status (1-27 Oct) Pump cover temperatures Pump2 Pump1 Pumps works in round-robin order (8 hours per cycle) to equalize working times

27/10/ PHOS Cooling status (1-27 Oct) Compressor cover temperatures Comp.2 Compressors also works in round- robin order (8 hours per cycle) to equalize working times Comp.3 Comp.4 Comp.1

27/10/ PHOS Cooling System status (1-27 Oct) Concept scheme (just to remind) Evaporator (suction header) Condenser (discharge header) 4 Compressors Freon R404A receiver Water condenser for freon cooling Heat Exchanger R404A   C 6 F 14 Electric Control Valve ECV controller 2 Pumps Receiver tank 65L C 6 F 14 Cooling server alidcscom252 LAN2 DCS server alidcscom072 phs_top project PVSS LAN1 DIM 4 compressors, 2 pumps, 3 heaters, 2 valves, Electric Control Valve + controller, fan, 3 pressure + 14 temperature sensors, liquid level sensor, thermo/oil/pressure relays, funless industrial computer, 10×I-7000 RS-485 remote data acquisition modules, 6×ELMB cards, 15 humidity + 96 temperature sensors in PWO,FEE PHOS Control unit (ADC, DIO etc) RS-485 Feedback temperature sensor

27/10/ PHOS Cooling System status (1-27 Oct) PHOS DCS servers scheme PHOS cooling control - alidcscom252 (AliPhosCool program) PHOS cooling client - alidcscom074 (PVSS, phs_col project) PHOS cooling top GUI – alidcscom072 (PVSS, phs_top project)

27/10/ PHOS Cooling System status (1-27 Oct) Cooling control server: alidcscom252 Cooling plant works as DIM server under control of AliPhosCool program designed in VNIIEF,Sarov. RS-485 and CAN devices uses for data taking & control. Cooling server alidcscom252 Special funless industrial computer, located inside cooling plant

27/10/ PHOS Cooling System status (1-27 Oct) Cooling top GUI server: alidcscom072 Cooling plant GUI works as DIM client under PVSS. It ’ s fully integrated into ALICE DCS structures. But (at the moment) shifter can only view cooling data. To control cooling, expert should login to alidcscom252.

27/10/ PHOS Cooling System status (1-27 Oct) Stabilization algorithm PHOS cooling stabilization algorithm based on compressor switch on/off by feedback temperature sensor. So liquid temperature is not constant, but average temperature per control cycle is stable (±0.1°C).

27/10/ PHOS Cooling status (1-27 Oct) Stabilization: control parameters Control parameters: Tstab – wanted stabilization temperature of cooling liquid Delta – temperature corridor to switch compressors on/off NbMin – minimal number of compressors (when T < Tstab-Delta) NbMax – maximal number of compressors (when T > Tstab+Delta) Monitor parameters: Taver – achieved average (per control cycle) temperature of liquid Caver – achieved period (in minutes) of control cycle Naver – achieved average (per control cycle) number of compressors Tstab °C Delta °C NbMinNbMax Taver °C Caver minutes Naver ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ± 0.09 Main control parameter is Tstab. Delta, NbMin, NbMax depends on Tstab. Parameters chosen to achieve stable periodic control cycle (when possible). Large Caver “sigma” means control cycle instability (large variations of period)  Table shows used  parameter values

27/10/ PHOS Cooling status (1-27 Oct) Stabilization: power problem As shown in table and picture, at -30°C we are working near maximum of compressor’s power (~94% of max. power). This cause some instability of control cycle (see pic.). Remind that we have another (more powerful) cooling machine in b.167. At the moment this machine is not ready for operation, so we should plan this item for the next year. Control cycle period is not stable enough

27/10/ PHOS Cooling System status (1-27 Oct) Safety: Alarms and Interlocks PHOS cooling plant have 3 outcome Interlocks: 1.Hardware (normal opened relay) – signal in case of cooling system power off or control computer hang 2.Software (DIM service) – signal in case of alarms, i.e. dangerous conditions (some parameter out of threshold) 3.Network (DIM service) – shows that cooling server (alidcscom252) still alive Software alarm produce interlocks by 35 conditions. Interlock mean that cooling plant halted because it could not continue safe operation. Important note: Cooling system alarms protect cooling plant against damage, but not PHOS PWO & FEE. PHOS protection is job for higher DCS level (PVSS, phs_top project).

27/10/ PHOS Cooling System status (1-27 Oct) Safety: Alarms and Interlocks Software alarms : 35 conditions Each alarm condition have: 1) Flag (enable/disable) 2) Timeout (milliseconds) 3) Threshold (optional parameter) Positive timeout produce temporary device blocking Negative timeout produce Interlock, i.e. fatal alarm and system HALT Interlock require shifter’s command to Reset

27/10/ PHOS Cooling System status (1-27 Oct) Problems and discussions 1.Leak ~1 L per week in PHOS-4, ~8 month of work (without liquid filling). More liquid should be purchased next year (~60 liters ?). 2.Cooling system ’ s Control Parameters and Alarms tuning should be done after period of test operation (partly done). 3.It ’ s not quit clear how L3 magnetic field influent to temperature sensors in PWO. Should be tested. 4.Phs_top (PVSS) actions on cooling plant interlocks is still under discussion and should be modified (maybe). 5.Detail documentation (manuals) should be written for “ cooling experts ”. 6.For next year new cooling machine (more powerful) should be assembled and connected.