Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team.

Slides:



Advertisements
Similar presentations
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland February 2014.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
HIGH RF POWER TESTING FOR THE CLIC PETS International Workshop on Linear Colliders 20 th October 2010 Alessandro Cappelletti for the CLIC team with.
30 GHz waveguide line modification towards 12 GHz.
1 28-Nov-2011 Dog-leg meeting «BE/RF» Current 30 GHz layout CTF3 CTF2 Overmoded 90 bend Mode converter Ø50 circular waveguide (existing line) 326 mm 1.
CERN X-band Test-Stand CERN - CEA – PSI – SLAC High voltage modulator Klystron XL5 Directional coupler Circular waveguide  =50 mm SLED Pulse compressor.
Test Facilities and Component Developments Sami Tantawi SLAC May 15, 2008.
Xbox-3 LLRF Ben Woolley Stephane Rey & Heiko Damerau.
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Synopsis The current PAD incarnation with 119 MHz acquisition fails to resolve pulse shape to required resolution. This resolution is required not only.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
 High Power RF Systems (352 MHZ - 12 GHz)  High Efficiency Power Sources  High Voltage Systems  High Gradient Accelerating Structures.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
S. FUKUDA LCPAC RF-Systems for STF S. Fukuda Accelerator Laboratory Content Introduction Status of STF and Plan forFY2006 LLRF Summary.
J.L. Navarro (CERN), for the CLIC/CTF3 collaboration.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
Jose Alberto Rodriguez.  Describe how we currently characterize structures at CTF3  Describe how we want to improve the characterization  Learn from.
EnEfficient RF Sources Workshop. June 2014 I. Syratchev X-band high RF power testing activity at CERN I.Syratchev.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
PETS TESTING ANALYSIS 4 th X-band Structure Collaboration Meeting 3 rd May 2010 Alessandro Cappelletti for CLIC collaboration.
W. Wuensch CLIC project meeting High-power rf structure testing.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
High Power RF Measurements Ben Woolley, Amos Dexter, Igor Syratchev. Jan Kovermann, Joseph Tagg HG2013, Trieste June 2013.
Calorimetric Power Measurements in Xbox-1 Xiaowei Wu.
High gradient test results from X-BOX1 Ben Woolley XBOX Team CERN, Switzerland December 2013.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
Update on PETS experiments (Igor for the CLIC collaboration)
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
30GHz system improvements Jan Kovermann RF meeting
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 CEA SACLAY CLIC R&D Activities F. Peauger, A. Hamdi, M. Desmons, W. Farabolini, P. Girardot.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
X-Band Test Stands: Conditioning and Operational Algorithms Joseph Tagg National Instruments Switzerland.
The status of RF components G. Riddone, M. Filippova RF development meeting on
2010 TESTING PROGRAM AND RESULTS FOR THE CLIC PETS X-BAND WORKSHOP ON RF STRUCTURES, BEAM DYNAMICS AND SOURCES 2 nd December 2010 Alessandro Cappelletti.
Advancements on RF systems D. Alesini (LNF-INFN) Quinto Meeting Generale Collaborazione LI2FE, Frascati 15-16/03/2011.
Franck PEAUGER – CEA SACLAY LCWS11 - Grenada 29 th September 2011 High power RF components F. Peauger, A. Branco, M. Desmons, W. Farabolini, P. Girardot,
Areal RF Station A. Vardanyan
WP5 Elliptical cavities
Development of X-band 50MW klystron in BVERI
An X-band system for phase space linearisation on CLARA
N. Catalan Lasheras on behalf of a very large team
Application of moderate (5 MW) X-band power sources for the CLIC accelerating structures testing program and other projects I. Syratchev, CERN.
Ben Woolley CLIC Workshop 2016 (LCWS16) CERN, Switzerland 18/01/2016
Test plan of ESS HB elliptical cavity
The situation is far better than I had thought.
Application of the moderate peak power (6 MW) X-band klystron’s cluster for the CLIC accelerating structures testing program. I. Syratchev.
12 GHz High Power RF components requirements for CEA activities
Experience with X band klystrons and solid state modulators at CERN
CLIC Klystron based. Updates 2017.
Recent high-gradient testing results from the CLIC XBoxes
Measurements, ideas, curiosities
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

Structure testing and RF tests stands Jan Kovermann CERN On behalf of the CLIC structure test team

Gallery Bunker Layout of the CERN x-band test stand (X-box 1) Clockwise from top-left: Modulator Pulse compressor DUT + connections Accelerating structure

Components of X-box 1 Klystron (SLAC XL5, #1 prototype) 50 MW, 1.5us pulse width, 50Hz rep. rate Modulator (ScandiNova K2-3X solid state, #1 prototype) Max. 450kV, 350A, 3.5us pulse width, 50Hz rep. rate Pulse compressor (GYCOM Russia, #1 prototype) 50MW, 1.5us rf  140MW, 250ns rf DUT (CLIC T24 accelerating structure) GHz, 24 regular cells, 2 coupling cells, 2 symmetric in/out couplers, 100MV/m acc. 42MW rf input power And several other new high-power rf components like valves, directional couplers, mode converters etc.

Status of X-box 1 Hardware installation finished this summer Development of control and DAQ software on-going Waveguide network including pulse compressor conditioned up to 20MW av., 1.5us, 50Hz into compressor, 170ns, 30MW, 50Hz out of compressor into structure. Pulse compressor needed about 200h of rf cleaning to reduce outgassing (chem. cleaning/baking not possible) SC solid state modulator is running without major problems, pulse-to- pulse stability is excellent (10^-4) Klystron output window showed activity when arriving in the 20MW, 1.5us regime, but calmed down after ~25h of conditioning T24 structure reached and 170ns PW 24/7 operation still limited due to pulse compressor instability at increased breakdown rate, working on new operating schemes to overcome that limitation

Current results with new X-box 1 DAQ system pulses 138 structure BDs, 86 system BDs DAQ system logging deployed first time mid of October, but software development not yet completely finished! Just starting to take data! Structure BDs Network BDs All 170ns PW

Current results with new X-box 1 DAQ system In real time, several hours of running missing due to instable pulse compressor: BDs stop rf, pulse compressor cools down and detunes, compensation using frequency tuning seems to increase structure BDR

Current results with new X-box 1 DAQ system Phase modulation for pulse compression works well, rf flat top can be easily controlled using the dark current emission waveform. Logarithmic power detectors ease operation at all power levels and help to obtain good power resolution without saturation effects during breakdown.

New X-box 1 DAQ system Based on NI LabView and NI PXI hardware 50dB log detector into 14bit 250MSps/s ADC for controls Last interlock event display (plus two previous pulses) Interlock levels, calibration etc. Power, DC, beta history All at 50Hz rep. rate! 400Hz possible! Single shot FN-plot Log det raw data Dark current Inc. powerTra. power Ref. power Ref. power to klystron

New X-box 1 DAQ system Based on NI LabView and NI PXI hardware Vac history plot Beta = 70 +/- 5 Automatic conditioning

Development of improved DAQ system for Xbox 2 Improve rf DAQ by using faster ADCs with higher dynamic range (1.6Gsps/s, 800MHz analogue BW) Decrease system complexity and calibration issues by using a down mixing and direct IF sampling scheme Low-level synthesis of driving rf signal with I/Q modulator and two 400Msps/s DACs allows very flexible pulse shaping Only one PXI crate for timing, interlocks, low level rf synthesis and rf data acquisition All interlocks as FPGA logic with watchdog and multiple instances gives high reliability Independent of CERN control system Operation at 400Hz repetition rate seems feasible  Proof of concept until beginning of 2013

Future CERN RF test-stands progress

50 MW klystron station #2 (X-Box 2) MW CPI klystron. Some brazing problems in production of the first tube. Hopefully final brazing will be done towards end of October If successful, the testing will start in December The delivery to CERN is expected in March “ScandiNova” HV modulator has been ordered from the company. Following the schedule, it will be delivered to CERN in March New SLED type RF pulse compressor. All the pieces are fabricated at CERN. Going trough the final brazing steps. Ready for the low RF power tests in November The various RF components of are ordered from the industry. First prototypes will arrive to CERN in November 2012 for the acceptance RF check. The rest will be delivered to CERN before March The detailed 3D layout and integration of the test stand are ready.

X-Box#2 at one of its possible location. Bld. 150 D. Gudkov, CERN

4x (6 MW + SLED) cluster station (X-Box#3). 1.Market survey completed. Three klystron manufacturing companies are qualified. Invitation for tender is now prepared. We expect to go to finance committee in March 2013 for approval with delivery of 4 turnkey 6 MW klystron / modulators for Q2/Q The RF components are similar to the ones used in X-Box-2. Some of them are already in the production pipeline. 3.The detailed 3D layout and integration of the cluster test stand is under way.

Dog-leg test area for the experiments with beam loading Unloaded Loaded (CLIC) Testing of accelerating structure with nominal beam loading is a missing block in our testing program. Such a test will be done using CTF3 drive beam and RF power delivered from X-box#1 via modified 30 GHz low loss transfer line. 1.All overmoded RF components (designed and fabricated in CEA) are in stock. 2.The accelerating structure (T24) is prepared and placed on its final girder. 3. The other RF components (pumping ports, gate valves) are ordered from the industry and will arrive to CERN in November The installation of the T24 on the beam line will be done during 2013 winter shutdown. 5.The RF low loss transfer line network from CTF2 to CTF3 will be modified in May Increasing current

RF Beam Dog-leg test layout A. Solodko, CERN