XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Francis Perez ALBA Status.

Slides:



Advertisements
Similar presentations
2002 November 16 CLS PROJECT STATUS M.S. de Jong Project Leader November 16, 2002 Annual Users’ Meeting.
Advertisements

New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
F. Fernandez 28/10/ Ferran Fernandez WAO2014 Operators training experience at the ALBA synchrotron light source.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste.
Diamond and the UK new light source Chris Christou, X-band workshop, Cockcroft Institute, 1 st December 2008.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
HERA Running 2005 F. Willeke, DESY 60 th Meeting of the DESY PRC November Luminosity Polarization Backgrounds Improvements Technical Issues.
Cavities Auto Recovery with Beam RF&Linac Section - ALBA Accelerators Division Francis Perez Angela Salom.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
RF 1/33 ALBA RF system why, how and other questions Francis Perez.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
Operational experience of high-power RF at Diamond Light Source
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
CEPC Booster Zhang Chuang, Cui Xiaohao September 11,2015.
Machine Operation and Studies at SSRF Wenzhi ZHANG Dec. 16, 2013 Spain.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
ALBA RF Systems Francis Perez.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
Questions to automatic workshop. 13 BLs financed Another 5 under discussion MAX IV status: Injector linac running since May GeV ring under commissioning.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
Report Technical Director Storage-Ring-Installation Completed
Operations Machine Simulator.
Report Technical Director Storage-Ring-Installation Completed
PETRA III, Status and Upgrade
Ferran Fernandez On behalf of the Accelerator Division
Diamond Light Source Status and Future Challanges
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Status and New Developments of RF Systems of ALBA
Status of the ASTRID2 facility
Failure analysis at BEPCII
SuperB Injection, RF stations, Vibration and Operations
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Coupling Correction at the Australian Synchrotron
Tango status at Elettra
ALBA capabilities towards contributions to the FCC study
Bubble Chamber Planning Meeting
Machine Operation and Progresses in SSRF
Operations Department
Operations Department
Operation Progress and Upgrade in SSRF
Advanced Research Electron Accelerator Laboratory
Overview LINAC BOOSTER STORAGE RING 100 Mev Commissioned in 2008
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status and New Developments of ALBA RF Systems
ThomX – Commissioning Meeting – 25/01/2018
Status and New Developments of ALBA RF Systems
Presentation transcript:

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Francis Perez ALBA Status

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Outline Introduction Operation 2014 Statistics Problems Top Up Accelerator Developments FOFB Energy measurement Interferometry beam size “67 MeV” injector 2

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 LINAC 100 MeV BOOSTER 100 MeV – 3 GeV STORAGE RING 3 GeV ALBA Accelerators

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Booster SR In vacuum undulatorRF cavities Bending ALBA Accelerators

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 ALBA New Beamlines schedule ‘Austerity’ shift By 2020  13 Operational Beamlines

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 ALBA BLs Phase II in execution MIRAS: Infrared microscopy LOREA: Photoemission with Low Angle Resolution

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Proposals received in October SAC Meeting in December Evaluation by January 2015 ALBA BLs Phase III

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Operation 2014 Statistics Problems

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Beam for users at ALBA Beam for BLs: scheduled user beam, including injection time MTBF: Mean time between failures MTTR: Mean time to have the beam back * Data until 10/11/ Accelerator operation [h] Scheduled user beam [h] Availability [%] * Delivered beamtime [h] MTBF [h] * MTTR [h] *

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, Beam Availability (until 10th Nov) 31 h 25 h 21 h 1.1 h 0.8 h 1.0 h

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 BLBeamlines PSS CTControls DIDiagnostics EPSEPS interlock IDInsertion Devices INFInfrastructure LILinac MMLHigh Level Software (MML) OEHuman error OIOrbit Interlock OTOthers PMPulsed magnets PSPower Supplies PSSPSS (except BLs) RFRadio Frequency VCVacuum WIWater interlocks Analysis of failures per sub-system Total of h of beam downtime Operation 2014 (until 10th Nov)

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 FE absorber temperature – ok Pinhole aluminium window water leak Damaged Kicker Electronics

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Repaired the following day Pinhole aluminium window water leak ? Small (350um) hole in the Cu cooling pipe Microscope image

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 LINAC Gun High Voltage PS Before starting run #3, during the subsystem tests, the LINAC Gun High Voltage PS (-90 kV) did broke. We did not have available spare: Exchanged by -50 kV PS (from RF group) and commissioned the Linac with reduced e-gun beam energy. BESSY lend us a -90 kV as back-up (many thanks to Andreas that pick up the phone on May 1 st and SOLEIL that offered also their spare) Back to normal in a week, just in time for Users.

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Top Up

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Top Up Test with users: 3 weeks in July Routine Operation Started:9 September 2014 MM M MW

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Top Up during RUN07 Machine studies Beam availability RUN07: 97.8 % 100% availability 28 Oct- 7 Nov

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Top Up Stability at the Beam lines, measured at the xBPMs: XALOC: xBPM (y) Decay mode Machine day Top-up (jumps are due to changes in the ID gap & xBPMs not properly calibrated)

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Radiation measured during Top-Up Only gammas detected at BOREAS Under investigation © Safety

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Radiation measured during Top-Up Well below Public Zone & Similar to decay mode © Safety June 25th

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Accelerator Developments FOFB Energy measurement Interferometry beam size “67 MeV” injector

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Fast Orbit FeedBack (Vertical) FOFB OFF FOFB ON 3 Hz

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Fast Orbit FeedBack (Horizontal) 3 Hz horizontal kicker induced noise is amplified by FOFB

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Fast Orbit FeedBack FOFB is working but still: Fine tune required Robustness (long runs) to be tested Error handing Friendly user interface

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Energy Measurement Spin depolarization ± GeV 3 different days 3 different RF frequencies 3 different energies: ± GeV

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Interferometry beam size Working on some vibration issues

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 “67 MeV” injector Objective: Operate the LINAC with only one Klystron: Either KA1 or KA2, for redundancy Compatible with installation and test of the second one

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 “67 MeV” injector 500 turns in Booster

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014  Accelerators operate reliable for users 96,0 % 2013 (excluding cooling problem) 96,5 %2014 (so far)  Top Up operational  Objectives for 2015  FOFB operational  Injector “67 MeV”  Increase operation current Summary

XXII ESLS Workshop ALBA Status Grenoble, November 25 th, 2014 Thanks to you, to the accelerators team and many others Accelerator Division Head F. PEREZ Operations M. PONT Operators F.FERNANDEZ M. ALVAREZ O. SERRES D. YEPEZ P. SOLANS J.C GIRALDO M. SOS N. AYALA RF & Linac RF A. SALOM B. BRAVO J. OCAMPO R. FOS MINECO Linac R. MUÑOZ D. LANAIA IDs J. CAMPMANY Magn Lab J. MARCOS V. MASSANA Beam Physics U. IRISO Beam Dynamics G. BENEDETTI T. GÜNZEL Z. MARTÍ M. CARLÀ oPAC Diagnostics A. OLMOS A. NOSYCH L. TORINO oPAC