1 RHIC – p+p and p+Au projections for 2018+ 21 March 2014 STAR meeting.

Slides:



Advertisements
Similar presentations
Polarized 3He ++ ion source development for RHIC. Check the Bjorken Spin Sum Rule (the difference between the 1st moments of the proton and neutron spin.
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
“NUCLOTRON-M” - кеу element of NIKA A.D.Kovalenko.VHM Workshop, September 19, 2007, Dubna.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
RHIC polarized protons – The next decade – Wolfram Fischer 14 May 2010 RSC Meeting, Iowa State University.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
RHIC shut-down work 2011 Wolfram Fischer 18 October 2011 RHIC Planning Meeting.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
Internal target option for RHIC Drell-Yan experiment Wolfram Fischer and Dejan Trbojevic 31 October 2010 Santa Fe Polarized Drell-Yan Physics Workshop.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
Thomas Roser EIC collaboration workshop MIT, April 6, 2007 eRHIC Design eRHIC Schemes R&D Items Cost and Schedule.
Wolfram Fischer1 2 superconducting 3.8 km rings 2 large, 1 small experiments 100 GeV/nucleon Au 250 GeV polarized protons Performance defined by 1. Luminosity.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC present status, and plans Wolfram Fischer 12 May 2011 Opportunities for Drell-Yan Physics at RHIC, BNL.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Short Review HERA Run 2002 / 2003 Luminosity Polarization Backgrounds Shutdown Activities Plans for Restart Report on HERA 64th Meeting of the DESY PRC.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
Luminosity expectations for the first years of CLIC operation CTC MJ.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
1 RHIC Run-15 p-p Head-on beam-beam compensation Wolfram Fischer, Xiaofeng Gu (liaison physicist), S.M. White, Z. Altinbas, D. Bruno, M. Costanzo, J. Hock,
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
October 4-5, Overview of ARRA funded AIPs at C-AD Wolfram Fischer October 4, 2010.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Polarized source upgrade. Source upgrade project Main component delivery: Atomic Beam Source- August 2011 Superconducting solenoid- March-2012.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
First Demonstration of Optics Measurement and Correction during Acceleration Chuyu Liu Collider Accelerator Department, BNL.
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
PAC Meeting, December 12, Prebys 1 The Problem.
APEX RUN-12 APEX Schedule Feb 22, 2012 Injection 8am 11pm IP transfer matrix Tepikian, Ptitsyn If needed: Beam Scrubbing Blaskiewicz, Montag, Huang Injection.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
ApEx needs for CeC PoP Experiment December 11, 2015.
Electron lens studies in support of RHIC / LHC Wolfram Fischer 28 July 2010 Fermilab Accelerator Advisory Committee Meeting.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
JLEIC ion source: specifications, design, and R&D prospects
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC Beam Operations Past, Present and Future
Summary Thursday h21: Stable beams fill #1303.
SLHC-PP kick-off meeting, CERN 9 April 2008
JLEIC Main Parameters with Strong Electron Cooling
Presentation transcript:

1 RHIC – p+p and p+Au projections for March 2014 STAR meeting

22 p+p luminosity projections Luminosity increase driven by bunch intensity and bunch length, based on New polarized source (first operated in 2013) Electron lenses (under commissioning) Pile-up at peak luminosity going from 1.7 (2013) to 7.7 (2018)

33 Capital project FY , $1.1M Commissioned before and during Run-13 Reliable operation Maintenance time significantly reduced Performance increase to date Maximum Booster intensity: 2x higher than Run-12 Polarization: 81%, 2% higher than Run-12 (at nominal intensity 5x10 11 ) Expect further intensity and polarization increases Will be primarily used to increase brightness Polarization at store can be reduced by accelerating smaller beams Optically Pumped Polarized H – source (OPPIS) – A. Zelenski New Atomic Beam Source (ABS) New superconducting solenoid Setup on 10 May 2012

4 4 installed Blue lens installed Yellow lens Goal: ~2x increase in average polarized proton luminosity Both lenses installed Magnetic structure operational (3 T of 6 T for main field so far) Demonstrated 1 A pulsed e-beam in Blue/Yellow, 1 A DC in Yellow Running with pulsed e-beams parasitically to Au+Au stores First beam-beam experiments expected on 3 April 2014 Working on transverse alignment of electron and proton beams Expect to be operational for Run-15 Electron lenses – under commissioning

55 In addition to OPPIS and electron lenses a number of other systems need to be readied for high-intensity operation: SAD/ASE – completed 2011 Evaluated Booster/AGS/RHIC effects (CAD MAC-08, 2012) Evaluated: ramp efficiency, radiation safety, beam dump, collimation system, rf systems, resistive wall heating, instabilities, cryogenic BPM cables Need: Dump kicker upgrade (ferrite heating with beam current) – summer 2014 Orbit interlock to prevent BPM cable overheating – tested in Run-13 High-intensity operation

66 Pile-up of up 8 events per bunch-bunch crossing at peak luminosity Could be reduces with lower initial  * and subsequent  *-squeeze during the store Planning to test a similar scheme during Run-14 Au+Au Still need full beam-beam compensation with electron lenses (beam-beam effect independent of  *) Dynamic  * squeeze will reduce delivered luminosity (but may increase useful luminosity) Possible pile-up mitigation

77 p+Au luminosity projections Luminosity increase driven by bunch intensity, based on New polarized source for protons (first operated in 2013) Incremental increases for Au ions (EBIS/Booster/AGS/RHIC) Electron lenses (under commissioning)