1 South Slough Bridge #91 2008 APWA National Project of the Year Transportation Category, Projects Less Than $2 million.

Slides:



Advertisements
Similar presentations
Project Planning: Assembling a Mortenson “Integrated Work Plan”
Advertisements

Chp12- Footings.
LHTAC Overview of LPA in Idaho July 24, 2013 Local Public Administration.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Reconstruction of the Eads Bridge Highway Deck
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
 Project Delivery  Design Considerations  Lessons Learned.
Whittier Access Project, Alaska The Anton Anderson Memorial Tunnel Whittier Access Project.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Presentation Of A Chico State Student Engineering Project That Resulted From Curricula Development Contract For Rubberized Asphalt Concrete And Civil Engineering.
US 93 Improvements – Buchanan Boulevard to the Hoover Dam Interchange Transportation Category, Projects $10 Million to $20 Million 2012 APWA Project of.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Critical Thinking in Engineering Process
Leadership Asheville Gary Jackson City Manager Public Leadership and Delivering Better Service to Citizens for Less Money.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Fraud Awareness Conference FEDERAL TRANSIT ADMINISTRATION Corey Walker Office of Program Management Sound Transit Steel Casing Product Substitution Review.
Transportation Services Report and TCCAP Update March 5, 2014.
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
Partners in Progress Forming Bonds with GECs to Build Roads.
St Johnsbury BF 7000(20) Bridge 6 on VT Route 2B over the Lamoille Valley Rail Trail Presenter: John Byatt, PE Consultant Project Manager.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
1 Monthly Operations Report September 15, 2015 Presented to Boynton Beach City Commission Presented by Boynton Beach Utilities
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Standardizing Transportation Project Submittals to DNR Team Jim Doperalski WDNR Mike Halsted WDNR Janet Smith WisDOT Troy Stapelmann WisDOT Standard Submittal.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
Autonomous Inspection Unit Seaham Quarry Site Contact: Richard Tomkins - Quarry Manager Phone:
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Stenton Avenue Masonry Arch Rehabilitation Approaches to Historic Bridge Rehabilitation Case Study #1 Michael J. Cuddy, P.E. Principal Kara Russell Cultural.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Bridge disasters.
Substructure Groundworks - Hazards
2016 FHWA National Hydraulic Engineers Conference
FOR LOCAL AGENCY FEDERAL AID PROJECTS
New Bridge Construction
Ohio’s Research Initiative for Locals
Kansas EPS Geofoam - Lightweight Fill
FOR LOCAL AGENCY FEDERAL AID PROJECTS
Replacement of Vehicle Bridge over Spring Creek
S.R. 26 Road Rehabilitation in Clinton County
Ron Hancock, PE NCDOT State Construction Engineer
Presentation transcript:

1 South Slough Bridge # APWA National Project of the Year Transportation Category, Projects Less Than $2 million

South Slough Bridge #91 Snohomish County Public Works Art Louie P.E., Engineering Services Director Larry Brewer P.E., Project Manager CRAB Conference – October 7, 2009 APWA “Project of the Year” for

Location Located 4 miles west of Arlington Near I-5 exit 208 Carries Smokey Point Boulevard over South Slough

Background Part of the Pioneer Highway built by State North Arch built in 1918 South Arch built in 1920

Background 80-feet spans Arch built in 1918 Luten style concrete arch Founded on wood piling

Problem Functionally Obsolete by vehicles daily 19-feet between concrete rails Many sideswipe accidents

Decision Improve bridge deck to 28-feet width. Preferred over replacement with new bridge. New Bridge: 28 feet Existing Bridge: 19 feet Existing Arch

Decision Improve bridge deck to 28-feet width. Preferred over replacement with new bridge. REASONS: Safety improvement 85 year-old arch structure was basically sound. Preserves historic structure. Minimize impact to wetlands and flood plain. Affordable with no supporting grants. Less $ and time than full replacement.

Project Engineering The Luten arch foundation was sound. However two requirements had to be met: 1.Minimal or no dead load increase to reduce risk of settlement. 2.The wider design had to maintain same dead load distribution as the original structure. Parsons Brinckerhoff was tasked with resolving the structural engineering.

Widen Without Weight New deck would be precast concrete slabs. Each slab was 8’ x 31’ x 1’ 32 slabs total 43,000 pounds each slab 950,000 pounds total of new structure! PLAN

Widen Without Weight We needed to replace earth fill (125 pcf) with lighter material that could still transfer loads to the arch.

Widen Without Weight 2 materials were considered for light weight fill. Geofoam would be extremely light at 2 pcf. Difficult to custom form and assure good load transfer to arch. Cellular concrete or “Engineered Fill” ranges in density from 30 to 110 pcf. Compression strength varies from 40 to 2400 psi. Can be formed in place CY of Elastizell cellular concrete was used. We needed to replace earth fill (125 pcf) with lighter material that could still transfer loads to the arch.

Balancing Act 1. Removed existing concrete slab. 2. Partially removed the existing parapet; used the remaining portion as a form for the new light-weight concrete fill. 3. Removed the existing soil fill in uniform lifts, alternating from one arch to the other to maintain a balanced distribution of weight. A correct load distribution and a well-planned construction sequence were essential for the success of this widening project.

Construction Sequence 4.Filled arches with lightweight concrete in uniform lifts, again alternating from one arch to the other. 5.Added a layer of crushed rock to serve as the base for the new pre-cast concrete slabs. 6.Laid the 32 pre-cast slabs on top of the crushed rock, working from the center outward. 7.Added a lift of asphalt and new galvanized steel bridge rail system.

Community Coordination Developed detour plans Coordinate with WSDOT Newsletter distributed County website Newspaper display ad Specific coordination for the Annual Arlington Fly-In  50,000 people for one week!

Schedule 17 months from start of design to end of construction During scoping decision was made to have County forces construct project. Time saved by working together as design-build team Design began April 16, 2006 Design finished April 15, 2007 Ad date April 23, 2007 (for pre-cast concrete, cellular concrete, bridge rail, crane) Construction began June 25, 2007 (road closed) Construction finished September 12, 2007

Schedule Time Saving Measures: Early coordination with utility companies during the design phase and continued coordination throughout the project. Underground water and sanitary sewers were avoided by modifying excavation at abutments. The design team stayed with the project through construction and provided support to the construction inspector. The County’s Road Maintenance personnel built the bridge, eliminating the need for a lengthy bid process. Parsons Brinckerhoff, a County on-call consultant, was utilized to prepare the structural engineering.

Safety There were no injuries on the South Slough Bridge construction project. Daily tailgate meetings were held each morning to discuss the plan for the day—work to be done and safety measures to be followed during the process. Crew members wore proper safety equipment. The construction manager attended monthly safety meetings. All of the County’s construction managers meet monthly as a group with the County’s safety trainers and report back to their project crews. All members of the crew had CPR and First Aid training. Defensive driving certification was also required. Some crew members also had confined space training.

Saving $$$ It was determined at the scoping meeting that reusing the arches could save time and money. The average cost of a new bridge in Snohomish County is: Construction $/SF Engineering, ROW, Contract admin $/SF Total cost for new bridge $/SF Bridge 91 had a total cost of 129 $/SF

Saving $$$ It was determined at the scoping meeting that reusing the arches could save time and money. Actual CostEstimate for Total Replacement Construction$779,1504,332,000 Design/Const. Inspection $149,9501,516,000 Total$929,100$5,848,000 Nearly $5,000,000 saved!

Key Points Final Project Cost: $929,100 Cost of total replacement would have been approximately $6 million. Saved $5 million. Duration: 17 months Typical bridge replacement of this magnitude takes approximately 6 years. Using original arch foundation shortened project by 1.5 years. On Schedule Scheduled 55 days for construction. Completed in 55 days, on September 12, 2007.

Key Points Good Construction Management Techniques Critical path method schedule was developed and followed. Design and construction staffs stayed in close communication throughout the project. Safety: No Injuries Daily field meetings and monthly department safety meetings promoted a safe construction site. Community Relations County staff maintained direct interaction with stakeholders and utilized internet, mailings, a newspaper ad and flashing message boards to minimize impacts to the community.

Key Points Environmental Protection Reusing the existing arches kept construction out of the wetlands and out of the floodplain. Banks were re- vegetated with native shrubs.

Unusual Accomplishments New 62% larger deck area did not add weight to the arches. This was the largest bridge project constructed by County Road Maintenance crews. Reusing existing arches reduced project duration by approximately 4.5 years. To prevent overloading the arches, earth fill within the arches was replaced with light-weight cellular concrete.

Unusual Accomplishments To prevent unbalanced loading of the arches, soil was removed incrementally from both sides of the bridge. 32 precast concrete slabs, 8 feet by 31 feet, were placed side by side and bolted together above the existing arches and cantilevered 4.5 feet on each side. The crew lost less than 2 hours of productivity when bones were unearthed. The archeological consultant was on site early the next morning and identified them as cow bones.

The Next Project APWA Award Submittal Keep the team organized Know requirements and deadlines for the submittal Get help of the best editor/word processer. Get independent and critical reviews Submit early Wait…

27 APWA National Congress New Orleans, August 2008

And keep applying!