Www.floodrisk.org.uk EPSRC Grant: EP/FP202511/1 Predicting Breach Formation Mark Morris HR Wallingford The Science of Asset Management London – 9 th December.

Slides:



Advertisements
Similar presentations
Flood Risk Analysis – the USACE Approach
Advertisements

Outcomes of The Living Murray Icon Sites Application Project Stuart Little Project Officer, The Living Murray Environmental Monitoring eWater CRC Participants.
Flood Profile Modeling with Split Flows and Weirs
BUILDING STRONG ® Do not include this Slide. This template is a guide for preparing power points presentations. The information requested is important.
Assessing Uncertainty when Predicting Extreme Flood Processes.
IMPACT ~ Breach Physical Modelling Review of Modelling Work Undertaken So Far...
2013 Northwest Hydro Operators Forum 1 Risk-Informed Decision Making – FERC Perspective David Lord, P.E., D2SI Dam Safety Risk team – Portland, Or Natural.
Reinaldo Garcia, PhD A proposal for testing two-dimensional models to use in the National Flood Insurance Program.
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
Sharif University of Technology Civil Engineering Department Tehran-Iran Dam Safety An Approach to Prevent Dam Incidents.
PHYSICAL MODELING OF BREACH FORMATION Large scale field tests Kjetil Arne Vaskinn, Sweco Gröner Norway.
Detention / Infiltration Structure. Figure 21–1 Point Discharge and Downstream Stability Analysis Procedure.
Kinematic Routing Model and its Parameters Definition.
Sediment Movement after Dam Removal
WINDAM Technology Workshop Sept 1-3, 2009 WINDAMb-e (Windows Dam Analysis Modules)
1/55 EF 507 QUANTITATIVE METHODS FOR ECONOMICS AND FINANCE FALL 2008 Chapter 10 Hypothesis Testing.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Statistics for Business and Economics 7 th Edition Chapter 9 Hypothesis Testing: Single.
“Research in dam breaching" Sílvia Amaral PhD Student (1 st year) December, 14 th 2009.
HDM-4 Calibration. 2 How well the available data represent the real conditions to HDM How well the model’s predictions fit the real behaviour and respond.
UNIFORM FLOW AND DESIGN OF CHANNELS
US Army Corps of Engineers BUILDING STRONG ® Consequence Assessment for Dam Failure Simulations Kurt Buchanan, CFM Economist Mapping, Modeling, and Consequences.
Chapter 10 Hypothesis Testing
Upper Brushy Creek Water Control & Improvement District
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
WinTR-20 SensitivityMarch WinTR-20 Sensitivity to Input Parameters.
BsysE595 Lecture Basic modeling approaches for engineering systems – Summary and Review Shulin Chen January 10, 2013.
Sediment Retention model
Copyright © 2012 by Nelson Education Limited. Chapter 7 Hypothesis Testing I: The One-Sample Case 7-1.
BREACH FORMATION A Review of State-of-the-Art Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 16/17 May 2002.
9. Seepage (Das, chapter 8) Sections: All except 8.2, 8.6, 8.7, 8.8, 8.9.
EPSRC Grant: EP/FP202511/1 Improved Methods for Predicting Trash Loading at Culverts with Trash Screens Nick Wallerstein & Scott Arthur.
Industry & Research: Issues, needs and conclusions from the US IMPACT Investigation of Extreme Flood Processes & Uncertainty Workshop at HR Wallingford,
The Examination of Residuals. Examination of Residuals The fitting of models to data is done using an iterative approach. The first step is to fit a simple.
Cost drivers, cost behaviour and cost estimation
Formulation of a New Breach Model for Embankments IMPACT Project Workshop, Wallingford 2002 Breach Formation Theme.
Reducing the Risk of Embankment Failure Under Extreme Conditions Mark Morris HR Wallingford IMPACT Project Workshop Wallingford, 17 May 2002.
Dynamic Channel Routing Preissmann Scheme. Dynamic Channel Routing Preissmann Scheme unconditionally stable for  >=0.5 second-order accurate if 
Stream Erosion and Transport
A Deterministic Bank-Stability and Toe-Erosion Model (BSTEM Version 5.4) Andrew Simon, Robert Thomas, Andrea Curini and Natasha Bankhead USDA-ARS National.
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
EPSRC Grant: EP/FP202511/1 WP4.4 A Rapid Embankment Breach Assessment (AREBA) Myron van Damme Sept 2011.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
Basic Hydraulics: Culverts – I
IMPACT 3-5th November 20044th IMPACT Project Workshop Zaragoza 1 Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme.
DIMENSIONAL ANALYSIS SECTION 5.
Lecture 6 The boundary-layer equations
IMPACT 13 May Investigation of extreme flood Processes and uncertainty IMPACT Investigation of Extreme Flood Processes and Uncertainty.
Details for Today: DATE:13 th January 2005 BY:Mark Cresswell FOLLOWED BY:Practical Dynamical Forecasting 69EG3137 – Impacts & Models of Climate Change.
IMPACT 4 November 20044th IMPACT Workshop - Zaragoza1 Investigation of extreme flood Processes and uncertainty Model uncertainty How uncertain are your.
International Levee Handbook Overview of the handbook Chapter 3 Functions, Forms and Failure of Levees.
Overview of the handbook Chapter 5: Levee inspection, assessment and risk attribution.
Team  Spatially distributed deterministic models  Many hydrological phenomena vary spatially and temporally in accordance with the conservation.
International Levee Handbook Overview of the handbook Chapter 8 Physical processes and tools for levee assessment and design.
RASP - Risk Assessment of flood and coastal defence for Strategic Planning A High Level Methodology Project partners and co-authors Paul Sayers / Corina.
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Specific Modelling Tools & Techniques.
Insert the title of your presentation here Presented by Name Here Job Title - Date How can we make London’s transport network resilient to climate change?
Beach Modelling: Lessons Learnt from Past Scheme Performance Project: SC110004/S Project Summary.
UNIFORM FLOW AND DESIGN OF CHANNELS
Presented by Engr. Motaher Hossain
EVALUATION OF NEW MODELS FOR SIMULATING EMBANKMENT DAM BREACH
Constructive Cost Model
Chapter 10 Verification and Validation of Simulation Models
Modelling tools - MIKE11 Part1-Introduction
Overview of Models & Modeling Concepts
IMPACT ~ Breach Formation (WP2)
Floods and Flood Routing
Hydrotechnical Design Guidelines for Stream Crossings
IMPACT ~ Breach Formation (WP2)
What to look at in fire engineering analysis
Presentation transcript:

EPSRC Grant: EP/FP202511/1 Predicting Breach Formation Mark Morris HR Wallingford The Science of Asset Management London – 9 th December 2011

“An overview of current options, practice and future direction for predicting breach formation” 1.What are we talking about? 2.Current options / Latest developments 3.Practice 4.Future direction 5.Research gaps

[1] What are we talking about?

What are we talking about?

Why do we need to predict breach? The way and rate at which an embankment breaches can affect the timing of the breach, the rate and magnitude of the flood water released and the size of the breach itself. Therefore, breach affects the analysis of flood risk (ie. FRAs) and can change the way in which flood events might be managed. Understanding the degree of uncertainty within the process and any prediction is a very important aspect of using breach predictions

Why do we need to predict breach? Consider that different aspects of breach prediction are important for different users: Flood risk assessment Planning Scheme design Emergency planning Flood event management Emergency repairs Peak discharge? Flood volume? Rate of flooding? Time to catastrophic failure? Size of breach?

Different types of breach processes The stages in breach development comprise: Initiation –Surface protection (grass) cover fails, soil starts to erode Formation –Significant erosion of material through embankment body and down to base Growth (widening) –Open breach; flow continues to widen the breach Can be driven by wave overtopping, water overflowing or seepage through

Different types of breach processes Soil type and state affects the soil erodibility Soil erodibility affects the overall physical process...which (for external erosion) may be headcut erosion or surface erosion (or a combination / transition between the two). Typically: Sandy, non cohesive soil = surface erosion Cohesive, clayey soil = headcut [not forgetting that soil state significantly affects the process...]

Different breach processes

Photos: Greg Hanson - USDA-ARS

What’s the point here? 1.Rate of flow through a breach is controlled by the upstream crest level –Breach formation occurs when this control erodes since flow can then increase, so increasing erosion –The timing of crest erosion for headcut or surface erosion varies –Hence the nature of flood hydrograph depends upon the form of erosion, hence the soil erodibility, hence soil type and state

What’s the point here? 2.The nature of the flood hydrograph also depends upon the reservoir stage/volume relationship and the soil erodibility –Assuming the crest erodes (surface erosion) –Hydrograph shape = function of rate crest erosion and reservoir surface area Can the reservoir level drop to match the rate of crest erosion?

[2a] Current options for predicting breach Different methods include: 1.Judgement (guess work?) 2.Simple predictive equations 3.Simple predictive models 4.More complex predictive models 5.Integrated breach and flow models 6.Probabilistic breach models

Current options for predicting breach 1.Judgement (guess work?) –Can vary from reasonable judgement to a blind guess hence can be highly inaccurate –Use of historic records from same catchment / soil / structure type helps 2.Simple predictive equations –Typically developed for dams or non cohesive soils –Regression analysis on limited data (and hence specific conditions) –Can have large uncertainties –Typically give peak discharge, maybe breach width – not hydrograph

Current options for predicting breach 3.Simple predictive models –Predefines and simplifies the breach process Is the simplification acceptable? 4.More complex predictive models –Greater complexity – less uncertainty –typically a slower model 5.Integrated breach and flow models –Allows for drowning of breach – important but don’t overlook what the model actually does 6.Probabilistic breach models –Gives more information regarding range of possible behaviour

[2b] Some recent developments in predicting breach i.Advances in rapid simulation – FRMRC2 ii.Conclusions from the DSIG breach modelling project iii.Advances in more detailed modelling – HR BREACH iv.Advances in understanding soil erodibility

WP4.4 (University of Oxford and HR Wallingford): Rapid breach assessment - will develop simplified equations for the rapid prediction of breach size for a limited range of embankment structures. The methods will be directly applicable to practicing engineers and will replace the default and very approximate breach modelling methods currently included within the RASP family of tools. Researcher = Myron van Damme – University of Oxford [i] Advances in rapid simulation: FRMRC2 WP4.4 research Goal of the research

In summary... Myron has: 1.Reviewed breaching processes and models 2.Chosen to develop simple, physically based equations –NOT regression analysis; Not emulating other models 3.Equations simulate average erosion rates for the different types of breach process (surface / headcut / internal erosion) 4.Assumes predefined physical processes for breach 5.Validated the model [AREBA] using HR BREACH and DSIG case study data[  builds upon international best]

General assumptions  1D flow behaviour  Rectangular spatially constant cross section breach  No equilibrium transport conditions  Constant soil erodibility  Instantaneous failure grass cover  No erosion below the foundation level of the embankment  Widening rate is proportional to the downward erosion rate Underlying assumptions (1/4)

Assumptions surface erosion  Landside slope remains equal to the initial slope gradient  Depth along landside slope approaches the normal depth starting from the critical depth  Landside slope retreats at a spatially averaged erosion rate  Crest erodes downward while landside slope retreats Underlying assumptions (2/4)

Assumptions headcut erosion  No downward erosion due to flow over the crest  Headcut starts at the top of landside slope Underlying assumptions (3/4)

Assumptions piping  An initial pipe diameter widens in an equal rate due to the flow through the pipe  After slumping of the soil above the pipe, potential further failure of the embankment is described by the surface erosion failure process  The grass cover is assumed to have failed with failure of the pipe Underlying assumptions (4/4)

AREBA - A Rapid Embankment Breach Assessment AREBA gives promising results when being bench marked against HR BREACH Validating AREBA against the DSIG data showed that the model prediction lie within the bounds of uncertainty following from the uncertainty in the input parameters Run speed AREBA is approximately 0.2s per run. Performance and validation

AREBA predicts breach through simple, homogeneous embankments – Does not simulate composite or complex structures – But speed of simulation does allow the user to ‘play’ AREBA requires definition of: – Upstream load (time varying water level) – Embankment geometry – Embankment soil erodibility, Kd – Assumed failure mode (surface, headcut, internal erosion) – Downstream volume / stage (time varying water level) Data Requirements / Applicability

International project – dam owners – industry needs focus Breach model review  3 selected for evaluation (as greatest potential for industry uptake) = SIMBA / HR BREACH / FIREBIRD Data review to assist model performance validation – USDA ARS data / IMPACT project data / 2 dam failures FIREBIRD eventually rejected due to lack of usability and hence testing [ii] Conclusions from the DSIG breach modelling project

SIMBA = Headcut; HR BREACH = surface erosion Performance of both models against the various test cases varied, but neither was consistently better or worse Conclusions: – Still to be formally reported by PM (Tony Wahl – USBR) (  not formal conclusions) – Develop an industry model using both headcut and surface erosion processes (ie SIMBA + HR BREACH) – Modeller understanding and ability with the models is important For example, models simulate breach through simple structures; expertise is needed to know how to apply the models to more complex, real structures – Available data to support research and model validation is limited – Uncertainty / lack of knowledge in soil erosion processes / simulation DSIG Conclusions (Cont.)

[iii] Advances – HR BREACH model HR Wallingford programme of research over past decade –National / EU / International projects plus company R&D  HR BREACH model –Mohamed (2002); Integrated InfoWorks (Wallingford Software  Innovyze); Morris (2011) 1D flow; sections through embankment; 2D section erosion plus block failure Focus here on one area of advance – breach formation through zoned flood embankments / embankment dams

Trying to predict breach through real rather than idealised structures How significant is this for flood risk assessment and hence asset management practice? Zoned embankments

Representing zones in the model

Effect of Kd versus As Soil erodibility versus reservoir stage area

Homogeneous embankment breach – two different erodibilities Peaky Hydrograph Flat Hydrograph

Effect of zoned embankment (2 layers) 2 flat layers – different erodibility (also fn of reservoir area) Extremes show peaky versus flat hydrograph (trends in-between)

Homogeneous embankment breach – two layers with different erodibilities Erodible top layer Resistant top layer

Effect of layers on outflow hydrograph 2 layers – different erodibility

Advances – HR BREACH model Conclusions: The combined effects of zoning and soil erodibility can significantly affect the breach flood hydrograph Layering can provide significant degrees of protection against more erodible material beneath –Ie. the Dutch / German embankment design Erodibility plus reservoir area affects flood hydrograph Each of these points is significant for design / construction / maintenance / risk assessment

  Greg Hanson   [iv] Advances in understanding soil erodibility

[4] Industry Practice Industry practice: Often guesswork / judgement or simple equations Why? Confusion over choice of best (appropriate) method? Avoid the cost –By avoiding perceived complexity of analysis –By avoiding purchase of software Blame uncertainty Systems analysis: Risk models run many thousands of simulations  need simple and / or fast methods of prediction

[5] Future Direction 1.Industry versus academic solutions – the challenges are different –Fast – simple   Complex – slow(er)? 2.Need to integrate flow, with soil erosion, with structure response / behaviour –Complex / significant interdependencies –Can reduce the uncertainty from flow by moving to a 2D, 3D flow model (using existing models and improved computer power) –Need to keep a balance in terms of analysis accuracy & relevance for different processes 3.Need to improve understanding of soil erodibility

[5] Future Direction 4.Need to improve understanding of natural and man made variability in soils / structures in order to assess likely erosion / failure processes 5.Different soils erode by head cut or surface erosion – currently as separate models  merge into a single model with analysis sufficient to determine and flip between processes

[5] Future Direction 5.Putting model speed aside, use more accurate flow models combined with a better analysis of soil behaviour... merge a soils analysis model (ie. Levee stability analysis) with a breach model to provide the complete assessment of levee response and failure 6.Given the uncertainty in soil parameters / distribution, consider how this may be done probabilistically as well as deterministically

[6] Research Gaps (i)Soil Erodibility: 1.Understand which parameters affect erodibility (close) 2.Understand how those parameters vary in-situ and under climate change conditions 3.Link parameters to field observations for asset management 4.Link parameters to design and construction specifications

[6] Research Gaps (ii) Breach model: 1.Meshing headcut and surface erosion, with analysis to flip between processes 2.Meshing ‘geotechnical analysis’ model with a ‘breach’ model 3.Dealing with uncertainty distribution?

[6] Research Gaps (iii) Data: We always seem to be chasing better data! 1.Despite the frequency of dam and levee failure there remains very little high quality, field scale data against which the different processes can be studied and models validated. Solution? 2.Soil erodibility data – If we accept process dependence upon soil erodibility, and we build models using measures of erodibility, how can we provide best guidance on value selection?

The EU FP6 Integrated Project – FLOODsite - Tasks 4 & 6: The CEATI Dam Safety Interest Group breach modelling project: The FRMRC II project website: Contact:Mark More information on breach? Website information