IRTBA “STATE OF THE INDUSTRY” Will County FY 2012.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
Advertisements

Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
Measure M Sunset Action Plan. Overview  Promises Made, Promises Kept  Funding Picture  Use of Measure M (M1) Freeway Funds  Next Steps 2.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
SCDOT Needs, Funding Challenges, and Economic Development or “Getting to Good” Robert St. Onge, SCDOT 16 July 2012.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
Highway 46 in BeresfordHighway 19 North of Humboldt Highway 73 South of Lemmon Interstate 90 East of Wyoming Line.
NC 73 Small Project Scoping Process Update June 24, 2014.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
DIVISION OF TRANSPORTATION IRTBA General Membership Meeting October 27, 2011.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
Transportation in Northern Kentucky Rob Hans, P.E. Chief District Engineer, District Six SAME, Cincinnati Post - April 15,
Pavement Preservation in South Carolina J. C. “Clem” Watson, P.E. Chief Engineer for Operations South Carolina Department of Transportation.
Todd Long, GDOT. Transportation in Georgia 10 th Largest Road System in Nation – 17,967 Centerline Miles of State Routes/Interstates – 85,738 Centerline.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
ACEC Joint Conference on Regional and National Economy Trends & Opportunities June 14, 2012 William C. Cuttler, P.E. Assistant District Administrator -
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
TEA, Portland, Maine Travis Koestner Missouri Department of Transportation October 20, 2006 Alternate Paving Update $$ Cost Control at MoDOT $$
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Special STP Application Cycle for SFY 2016 Projects ICC and Executive Committee Meetings September 2015.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Illinois Highway Statistics Population12.9 Million Licensed Drivers8.19 Million Vehicles Registered11.05 Million Passenger Cars Registered7.98.
Denver Area Transportation Issues and the Future of Transit Development in the Denver Metro Area Sertoma Club January 12, 2012.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
KAPA FALL FORUM T-WORKS Progress 7,714 miles improved $63 million modal projects complete 559 bridges repaired/replaced $2.3 billion let.
Local Pots of Gold Local Pots of Gold Maintaining Fiscal Constraint for Local Funds in the TIP Srikalyani Srinivasan Metropolitan Transportation Commission.
Street Maintenance Program Update City Council Work Session February 5, 2013 Department of Public Works & Transportation.
STA Safety Project PID #76439 December 12, 2006.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Julie Skallman State Aid Division Director & State Aid Engineer.
MEC’S BLUEPRINT MISSISSIPPI LONG-TERM TRANSPORTATION/ INFRASTRUCTURE PLAN.
Transportation Finance Advisory Committee May 18, 2012.
Business Leaders for Transportation By Linda Wheeler TFIC Sept. 7, 2007.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
Waupaca County Highway 5 Year Plan We build and maintain a quality transportation system for the safety and prosperity of current and future.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
PROJECT OVERVIEW. 2 Green Line Extension Project 3 College Ave Ball Sq Lowell St Gilman Sq Lechmere Union Sq Washington St.
Statewide Transportation Funding At Risk Your Name or Agency Date RTPA RCTF.
TRANSPORTATION PROGRAMS HR 2487: Jobs for Main Street Act of 2010 MAG Regional Council January 27, 2010.
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
TYPE OF WORK FY 2014 SUMMARYMILEAGE LONG TERM FINANCING FEDERAL / STATE AIDS COUNTY LEVY LOCAL SOURCES OTHER SOURCES TOTAL COST ADT PE CTH II -- Winnebago.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Yuma County Report Roger A. Patterson, P.E. County Engineer June 5, 2008.
ADMINISTRATION Legislative Update Transportation Policy Committee March 24, 2010.
Transportation Program (Infrastructure) Presentation Board of Aldermen Work Session February 29, 2012.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
The Gainesville Area Chamber Infrastructure Investment Initiative
North Main Street Intersection Improvements at Route 460 Bypass
1200 West Widening and Reconstruction Project
Gunnerson Street Safety Project
PLUM CREEK PARKWAY WIDENING AND PLUM CREEK PARKWAY/GILBERT STREET ROUNDABOUT PROJECT DESIGN APRIL 3, 2018.
Monterey County Project Report for Measure X Expenditures
Dakota County Board Of Commissioners August 6, 2019
Presentation transcript:

IRTBA “STATE OF THE INDUSTRY” Will County FY 2012

2008 – Build Will unveiled 60 projects on County Highway System $300 million program – Funded with RTA sales tax Federal, State, & other Local funding sources 2009-Present – Additional 12 projects – Total additional cost $57 million – $100 million in bonds approved by County Board BUILD WILL UPDATE

Largest Overlay Program in History – Last 2 Years 84 Center-line Miles 25 County Highways – FY Center-line Miles 14 County Highways Total estimated cost $10 million – 3 Year Total 120 Center-line Miles 39 County Highways BUILD WILL UPDATE (cont.)

Road Construction$40.7 million Structure Rehab & Reconstruction$11.9 million Engineering$14.0 million ROW Acquisition$14.8 million Build Will Total$81.4 million Maintenance$10 million Program Total$91.4 million FY 2012 PROGRAM

Weber Renwick Road 135 th Il Route 171 (Archer Avenue) 95 th Street Extension (Plainfield-Naperville Road to Boughton Road) Will-Peotone Old Chicago Road over Jordan Creek South Briggs over Metra & Hickory Creek PROGRAM HIGHLIGHTS

WEBER RENWICK ROAD Scope – Weber Road Widen to 6 lanes Barrier Median – Renwick Road Widen to 4 lanes Barrier Medians Total Cost: $ 14 million Approximately $ 4 million in Federal Funds (STP & CMAQ) Quick Take approved for ROW acquistion

135 TH IL ROUTE 171 (ARCHER AVENUE) Scope of Work – Realign Intersection – New Structure over Long Run Creek Total Cost: $ 7.1 million

95 TH STREET EXTENSION: PLAINFIELD-NAPERVILLE ROAD TO BOUGHTON ROAD Scope – Approximately 2 miles of new Roadway – New Structure over DuPage River – Intersection Improvements at termini – Noise Walls Total Cost: $ 25.9 million Funding: Over $10 million in Federal Funds (STP & STR)

WILL-PEOTONE OLD CHICAGO ROAD Scope – Turn Lanes on all legs – Reconstruction of Structures over Jordan Creek on both roads Total Cost: $7.04 million

SOUTH BRIGGS STREET OVER METRA & HICKORY CREEK Scope: Structure Rehabilitation Total Cost: $2.5 million

According to Labor Statistics – 42, 000 jobs are created – Per $1 billion in Construction Build Will FY 2012 Creates: 2210 jobs JOB CREATION

QUESTIONS?