Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.

Slides:



Advertisements
Similar presentations
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Advertisements

MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
I-66 Corridor Improvements Outside the Beltway CTB Briefing
National Utility Contractors Association of Colorado Wings Over the Rockies Air and Space Museum March 19, 2015.
Orange County Transportation Authority Measure M2 M2020 Update and Select Project Highlights Orange County Business Council Infrastructure Committee December.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Long-Range Transportation Plan PARA Grant Application Cochise County Board of Supervisors July 10, 2010.
Port St. Lucie City of Crosstown Parkway Extension Project Development and Environment (PD&E) Study & Environmental Impact Statement (EIS) Substantial.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
Douglas R. Failing, P.E. Executive Director, Highway Program LA Metro’s Highway Program LA Metro’s Highway Program May 10, 2013 Construction Management.
Cabinet Meeting February 22, 2012 Governor Andrew M. Cuomo.
1 RTD TOD Program University of Denver November 2004.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
FasTracks Moving Forward: Regional Transportation Plan (RTP) Amendment Staff Recommendation Phillip A. Washington and Team August 7, 2012.
Citizens Advisory Committee Quarterly Meeting Rick Clarke, Assistant GM – Capital Programs June 20, 2012.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
ACEC Joint Conference on Regional and National Economy Trends & Opportunities June 14, 2012 William C. Cuttler, P.E. Assistant District Administrator -
The Roads Ahead Leroy D. Alloway, Director Community Development.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
Citizens Advisory Committee Quarterly Update Bill Van Meter, Assistant General Manager, Planning September 19, 2012.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
Jefferson Parkway Public Highway Authority Bidder Information Conference December 14, 2010.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 CTC Discussion P3 Ingenuity Made Congestion Managing Pricing a Success James Martling, April 9, 2008.
Denver Area Transportation Issues and the Future of Transit Development in the Denver Metro Area Sertoma Club January 12, 2012.
0 Regional Measure 2: Capital Program Update May 12, 2010 Programming and Allocations.
Getting on the Ballot… and Getting the Ballot Right June 25, 2013.
LA Metro’s Highway Program May 29, 2014
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
DBIA MID-ATLANTIC MEETING October 16, 2015 Shailendra Patel, PE, DBIA Director, Alternate Project Delivery Office.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Metro Highway Program Presentation to CMAA Abdollah Ansari
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
Colorado Association of Ski Towns August 28, 2015.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Next Steps.  To begin Planning Council discussion about the MPO’s Next Steps. Now that the 2035 Regional Transportation Plan has been updated and adopted,
BUS RAPID TRANSIT (BRT) PLANNING EFFORTS STATUS 1 Planning & Development Committee April 5, 2016.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
US 36 Bus Rapid Transit RTD Board Update January 6, 2015.
Colfax Corridor Connections (Denver) & 15/15L Transit Priority Study (RTD) RTD Board - Planning & Development Committee August 6, 2013.
RTD Board Update October 8, 2013 US 36 Bus Rapid Transit.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
Southeast Rail Extension Update RTD Board of Directors FasTracks Monitoring Committee March 3, 2015.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Existing Interchange CC 215 Single bridge I 15
Southwest Parkway and Chisholm Trail Briefings
Northwest Area Mobility Study FasTracks Monitoring Committee
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Interstate 15 North 4/09/2015 Update
Interstate 15 North Phase 4
DATA Transportation 101 Project Status March 20, 2002
Public Private Partnerships & Innovative Finance Economic Development Council of Colorado, October 3, 2017.
Florida Transportation Commission FY 2009
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
SR 400 Express Lanes: Market Sounding
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Northeast Area Transit Evaluation (NATE) II Update FasTracks Monitoring Committee August 5, 2014.
Presentation transcript:

Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads. This $17.5 millon project is being done in coordination with the town of Windsor and city of Fort Collins, and includes an expanded carpool lot. Scheduled to be complete in the spring of North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor between North Metro Denver to Fort Collins/Wellington as well as US 85 and US 287. The EIS is the culmination of a decade of cooperative work involving up to 45 agencies/ local govt’s. The Preferred Alternative is estimated to cost $2.18 billion and includes. FHWA and CDOT intend to work toward implementing the Preferred Alternative in its entirety, but due to funding limitations, the Preferred Alternative will need to be constructed in phases over time. I-70 Twin Tunnels : — Conducting Environmental Assessment to widen eastbound bore and add 3 rd lane to Floyd Hill. Estimated completion of EA Fall Estimated project cost $60 million. Assuming enviro mental clearance (FONSI) project could start as early as Dec 2012, with opening by November SH 7/Cherryvale: — Safety and operational improvements from Cherryvale Road to 75th Street. Includes new pedestrian improvements and widen of railroad bridge near 75th Street. Projected completion Cost $18 million. US 36- Phase I: — Reconstructs and widens US 36 between Federal Boulevard and the Interlocken Loop to accommodate a new buffer-separated managed lane in each direction. As part of the reconstruction, the Wadsworth Parkway, Wadsworth Boulevard, and Lowell Boulevard bridges will be replaced. The project will also support Bus Rapid Transit, install commuter bikeway where feasible and implement an appropriate transportation demand management program. $315 million ($54 million-TIFIA Loan; $10 million- TIGER grant; $120 million RTD, Remaining- CDOT, HTPE, Bridge Enterprise, RTD, DRCOG, Local) CDOT has issued a Request for Proposal to three short-listed teams as part of the design-build process. CDOT will receive and review the proposals in February 2012 and will then select a design-build team in March Construction will begin in the spring of 2012 and the US 36 Express Lanes will open for toll collection by July 1, US 36- Phase II: Would reconstruct and widen US 36 between the Interlocken Loop and Table Mea/Foothills Parkway near Boulder to extend the managed lanes in each direction of US 36. HPTE currently anticipates issuing a Request for Qualifications (RFQ) relating to the delivery of Phase II in the first quarter of 2012, to be followed by a Request for Proposals (RFP) in the second quarter of The goal is to open this second phase to traffic by July 2015, the same time as phase I. The HPTE plans on applying for a TIFIA loan for Phase II estimated in the $25-$30 million range. Construction estimated to be $130 million.