US 52 Corridor Study Public Meeting November 15, 2010.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Tower Road Enhancement Project Prepared for Alachua County By Causseaux & Ellington, Inc. Alachua County Roadway Network Improvements.
Workshop Presentation for Homedale, Owyhee County & Homedale Highway District for Homedale, Owyhee County & Homedale Highway District Corridor Management.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Comparative Traffic Study Morrisville-Carpenter Road versus Crabtree Crossing Extension Presentation to: Morrisville Town Council Prepared by: Parsons.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Contact: Beth Morris
Florida Department of Transportation, November 2009
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
1 Channelization and Turn Bays. 2 Island Channelization flush, paved, and delineated with markings – or unpaved and delineated with pavement edge and.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Workshop Presentation for Canyon County Jurisdictions for Canyon County Jurisdictions Corridor Management Plan.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
The Ministry of Transportation and Infrastructure welcomes you to an Open House for: Trans Canada Highway No.1 Improvements in Salmon Arm Your comments.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Instructions  Check in with Andrew Bomberger at TCRPC to let him know what muni you will be visiting so he can give you any specific info for that muni.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Presentation Outline  Recommendation  Project Background  Public Involvement  Proposed Design  Citizen Comments/Questions  Summary and Recommendation.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
September 14, 2015 Transportation Board of Directors John M. Terry Assistant Director- Engineering SR-160 from SR-159 to Mountain Springs Phase 2 Final.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Council Presentation January 2014 Lauzon Parkway Improvements Class Environmental Assessment Study County of Essex.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
Complete Streets Training Module 4b – Designing for All Users.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
The I-465 West Leg Reconstruction Project
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Management Team Meeting #3
District 3 Complete Streets Projects
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Presentation transcript:

US 52 Corridor Study Public Meeting November 15, 2010

US 52 Corridor Study Agenda View maps and exhibits (15 min) PowerPoint presentation –Project Background –Existing and Forecast Corridor Conditions –Problem Identification –Improvement Options Questions View maps, ask questions, provide comments

Study Purpose Identify existing problems Forecast future problems Recommend improvements

Study Sponsors Tippecanoe County City of West Lafayette Area Plan Commission of Tippecanoe County (APC) Indiana Department of Transportation (INDOT) Study Consultant – HNTB

Study Approach Existing conditions  short term problems and improvements (5 to 10 year time frame) 2030 Forecast travel demand  long term problems and improvements 5

Recent Traffic Volumes Most significant volume increases since 1999: US 52 from Klondike Rd to Morehouse Rd US 52 from Northwestern Ave to Salisbury St Northwestern Avenue from Yeager to US 52 8,800 VPD 35,600 VPD 14,900 VPD 25,600 VPD 29,800 VPD 30,100 VPD VPD = Vehicles per day

Multimodal Accommodation Transit Operations –4 regular routes and 3 express routes in the corridor Bicycle/Pedestrian Facilities –Good existing/planned network in area, but little accommodation directly along US 52 or Northwestern Ave. 7 Source: CityBus

Key Corridor Road Projects (Capacity Expansion) 8 Extend new US 231 to I-65 (long term plan) Widen Klondike (2014) Widen Yeager / roundabout at Northwestern (2011) Extend Cumberland (2012) New US 231 (2011) Widen Lindberg (2016)

Future Travel Demand Land use study conducted by the APC Daily traffic forecasts prepared by the APC Includes planned road improvements Existing traffic counts + travel growth  2015 and 2030 peak hour traffic volumes for detailed analysis 9

Problem Identification Safety Traffic congestion Pavement condition and drainage Pedestrian and bicycle accommodation (connectivity and ADA accessibility) Transit access Method and details available at Search for “US 52 West Corridor Study”

Safety = Crash problem= Potential crash problem

Traffic Speeds = Speeds at least 5 mph over limit

Traffic Congestion = Good= Fair= Poor Existing Intersection Operation

Traffic Congestion = Good= Fair= Poor 2030 Intersection Operation

Physical Deficiencies Width restricted by cemetery Driveway impacts and drainage problems Poor pavement Weaving area too short

Bicycle and Pedestrian Accommodation US 52 east of Yeager Road –Discontinuous sidewalks –No provisions for bicycle travel or access Northwestern Avenue –Minimal sidewalk –High speeds, poor pavement, discontinuous shoulder US 52 west of Yeager Road –No sidewalks –Traffic and speeds discourage cyclists –Discontinuous paved shoulders

Transit Accommodation US 52 east of Yeager –Good service on cross/parallel streets –No service along US 52 –Lack of supporting sidewalk infrastructure Northwestern and US 52 west of Yeager –Good service along corridor –Some transit-supportive density –Lack of sidewalk infrastructure

Problem Themes Speeding Bicycle and pedestrian accommodation Safety at stop-controlled intersections Driveway safety – Yeager to Salisbury US 52/Klondike intersection Drainage issues Stakeholder/Public Input

Improvement Options Various improvements proposed within 5 geographic “treatment areas” –Add through lanes or intersection turn lanes –Modify intersection traffic control –Manage access to adjacent property (e.g., medians, driveway consolidation, parallel access roads) –Implement measures for speed control –Improve drainage and pavement condition –Improve bicycle and pedestrian facilities (connectivity and ADA compliance) –Gateway enhancements

Roadway Improvements – CR 500 W to Morehouse Rd 4-lane urban section 6-lane urban section Added lanes at intersection New traffic signal US 231 Close intersection

US 52 Typical Urban Sections 4-lane Section6-lane Section

Roadway Improvements – Morehouse Rd to Northwestern Ave 4-lane urban section 6-lane urban section Added lanes at intersection Move NB entrance ramp farther from Cumberland Ave. Potential future at-grade intersection

Roadway Improvements– Yeager Rd to Nighthawk Dr Alternative Concepts for discussion 1.Widen – 1 added lane in each direction 2.“Median u-turn” (“Michigan left”) design 3.“Quadrant roadway intersection” at Salisbury Street 4.Do Nothing (accept problems) Note: These concepts do not identify access for specific driveways

Widening Concept – Yeager Rd to Nighthawk Dr +Easy for drivers to understand +Provides more capacity between intersections to help driveway movements -Significant ROW impacts along entire segment -Still some delay at Salisbury

Median U-Turn Concept – Yeager Rd to Nighthawk Dr Left turns prohibited at Yeager, Salisbury and Nighthawk Left turns diverted to u-turn crossovers Widening at crossovers if median is narrow Source: Michigan Dept. of Transportation 52

Median U-Turn Concept – Yeager Rd to Nighthawk Dr +Better intersection operation than widening +Fewer impacted properties +Best alternative for pedestrians crossing US 52 -Could be confusing for unfamiliar drivers -Left turns are indirect -ROW impacts and paving at turn around locations

Quadrant Intersection Concept – Yeager Rd to Nighthawk Dr Left turns prohibited at Salisbury Left turns diverted to adjacent intersections Source: Federal Highway Administration B) Left-turn pattern from the arterial A) Left-turn pattern from the cross street Arterial Quadrant roadway Cross street

Quadrant Intersection Concept – Yeager Rd to Nighthawk Dr +Better operation at Salisbury than widening +Fewer impacted properties -Still requires widening at Yeager and Nighthawk -Could be confusing for unfamiliar drivers -Left turns are indirect at Salisbury -Significant ROW impacts at Salisbury

Commercial Access Concept – Yeager Rd to Nighthawk Dr (long term)

Advantages and Disadvantages +Remove interference from driveway traffic +Safer for vehicles on US 52 +Safer for pedestrians +Preserve capacity on US 52 +Could contribute to more accessible, pedestrian friendly retail areas -Property impacts due to access road construction -Increased traffic on cross streets (Yeager, Salisbury and Nighthawk)

Roadway Improvements – Northwestern Avenue 4-lane urban section Added lanes at intersection New roundabout (programmed project) Pavement improvement

Driveway Access Hunter Rd. Win Hentschel Bl.

Driveway Access

Bicycle / Pedestrian Improvements

Gateway Enhancements Could incorporate: –Pedestrian enhancements and crossing treatments –Wayfinding signage –Stormwater management –Structural elements –Lighting Benefits –Calming effect on traffic –Pedestrian safety and wayfinding –Reinforce sense of community and corridor unity Example gateway enhancements

Gateway Enhancements

Improvement Effectiveness Example = Improves= Worsens= Minimal Effect Potential Improvements US 52 - CR 500 W to Morehouse Road Performance Crash Reduction Vehicle Operation Speed Reduction Bicycle Access Pedestrian Access Transit Operation Livability 1.Urban section (curb, gutter, median) 2.Add turn lanes - CR 300 W intersection 3.Add turn lanes - US 231 intersection 4.Install traffic signal - Paramount Drive intersection 5.Consolidate driveways 6.Improve bicycle/pedestrian facilities 7.Construct gateway enhancements at CR 300 W, US Construct parallel roads

Wrap Up Questions? View maps Feedback Forms Contact: John Thomas Area Plan Commission of Tippecanoe County 20 North 3 rd Street Lafayette, IN (765) Website: Presentation and report will be posted