Mission Support Construction Update Mr. Jim Schaefer HQ PACAF/CEC.

Slides:



Advertisements
Similar presentations
5 May 2008 I n t e g r i t y - S e r v i c e - E x c e l l e n c e TEAM TINKER OKLAHOMA CITY AIR LOGISTICS CENTER Tinker Aerospace Complex (TAC)
Advertisements

Airport considerations and airport solutions Session 5 Presentation 3.
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
AFCEC Execution & AFIMSC Future
St. Joseph Harbor FY 2014 Dredging. St. Joseph Harbor Entrance to the Channel (Prior to Dredging) Areas to be dredged 53,000 Cubic Yards to be removed.
Tuesday, February 8, 2011 GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E. GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E.
Yakima Air Terminal/McAllister Field Master Plan Airport Board Briefing May 21, 2012 YAKIMA AIR TERMINAL | McALLISTER FIELD | Yakima, WA 1.
Association of California Airports September 20, 2007.
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
Provide and support mission ready Arctic Warriors from America’s premier Joint Base community 673d Air Base Wing Leadership Update JBER-Richardson Housing.
Line Efficiency     Percentage Month Today’s Date
AIRPORT A complex of runways and buildings for the
The Department of Defense Laboratory Based Global Influenza Surveillance Program Linda C. Canas Brooks City-Base, TX (210)
BUILDING STRONG ® US Army Corps of Engineers – Norfolk District SAME Industry Day Richard Klein Chief, Programs Branch Norfolk District 21 October 2010.
Mary Lin Elementary School 586 Candler Park Drive Phasing Plan March 25, 2010.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e U.S. Air Force Civil Engineer Center Society of American Military Engineers San Antonio Post SMALL.
Runway 16L-34R Overlay RFQ Presentation. AGENDA Review of the RFQ Process Overview of the 16L/34R Overlay Overview of Section 4 - Scope of Work Review.
Disclaimer – Any and all information contained herein is subject to change without notice 1 O’Hare Airfield Configuration EXISTING Airfield Configuration.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
As of Oct 08 UNCLASSIFIED G-1 FORSCOM 1 “Team Transition One Team, One Future” Headquarters FORSCOM/USARC Base Realignment and Closure Relocation.
J EFFERSON L AB – A N I NTRODUCTION Hugh Montgomery; May 14, 2012.
Defense Commissary Agency Transformation: Far East
2010 FAA Worldwide Airport Technology Conference Chicago Department of Aviation April 20, 2010.
Successfully Diverse Partnerships = Economic Impact ACEC Indiana 10 th Annual Diversity Network Fair Shannetta Griffin, P.E.
11th Wing The Chief’s Own! Lt Col Rockie Wilson, PE Commander, 11th Civil Engineer Squadron SMART Procurement Conference: Joint Base Andrews Infrastructure.
Steering Committee 69 “Training and Developing Tomorrow’s NATO Air Warriors Today!” FY15 Wing Commander Projects Colonel Gregory Keeton Wing Commander.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
F.E.S. MAJOR PROGRAMS FIRE PROTECTION DIV. F/Y02 INFO. Sructural Fire Branch 59 Personnel Assigned. 10 Equipment Assigned, Operated and Maintained. 306.
1 Defense Standardization Achievement Award Defense Logistics Agency Standardization of Fuels Equipment, Training, and Laboratory Operations Panel Presentation.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Air Force Design & Construction Mr. Robert Gill, P.E. 1.
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
Page 2 Salt Lake City International Airport – April 12, 2016 FY 2017 Budget Goals & Objectives - Budget Drivers  Implement the Terminal Redevelopment.
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
Columbus Airport Authority We’re Really Taking Off! November 6, 2002.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Airfield Damage Repair (ADR) 1.
The 14-Gate Replacement Terminal Project at Hollywood Burbank Airport Presentation to the Construction Management Associates of America (CMAA) May 26,
Jan 2016 Solar Lunar Data.
Monthly Report For January 2017
SAME Industry Day Richard Klein BUILDING STRONG®
Air Force Construction Management
Air Force Installation Contracting Agency (AFICA) – Operating Location Pacific CHRIS M. HEARL, MAJ, USAF PACAF SB Program DIRECTOR 11 July 2016.
Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall
Mammoth Caves National Park, Kentucky
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com

MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Analysis & Disclosure of customer complaints
ESS Project Status Roland Garoby – Technical Director August 2018.
Electricity Cost and Use – FY 2016 and FY 2017
354th Contracting Squadron “Icemen Buy, Eielson Flies!”
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
ATEC BRAC Update 154 Days Remain To 109 Days Remain To Cleon Raynor
Society of Military Engineers Monthly Meeting, October 11, 2018
Pilot of revised survey
Presentation transcript:

Mission Support Construction Update Mr. Jim Schaefer HQ PACAF/CEC

Major Construction Funding $1.26 Billion Total Construction In Progress Mission Support Portion That Affects Airfield Ops

ELMENDORF AFB HICKAM AFB ANDERSEN AFB KADENA AB YOKOTA AB MISAWA AB OSAN AB KUNSAN AB EIELSON AFB Mission Support Construction DIEGO GARCIA Repair Airfield Pvmnt, $5.9M Repair Runway, $14M Repair Parking Ramp, $4M Hydrant Fueling Sys, DLA $26M Hydrt Fuel Sys-Ph1, DLA $24.3M Repair Runway, JFIP $36.6M Bulk Fuel Storage, DLA $21.7M Hydrt Fuel Sys-Ph1, DLA $19.5M Hydrt Fuel Sys-Ph2, DLA $23.5M C-130 Parking Ramp, $17M Contingcy Pamnt, CDIP, $4.5M Access Taxiway, CDIP, $3.9M Widen Taxiway Alpha, JFIP

4 Eielson Repair Runway FY00 MILCON, $14MFY00 MILCON, $14M Replace old asphalt runway with 75’ concrete keel Replace old asphalt runway with 75’ concrete keel Planned construction:Planned construction: 1 May - 13 Sep 00 1 May - 13 Sep 00 Mission Implications: Runway shutdown for 135 daysMission Implications: Runway shutdown for 135 days

5 Eielson Repair Parking Ramp FY00 MILCON, $4MFY00 MILCON, $4M Replace old asphalt ramp (concurrent w/ $26M DLA FY00 Refuel Hydrant project) Replace old asphalt ramp (concurrent w/ $26M DLA FY00 Refuel Hydrant project) Planned constructionPlanned construction 1 May - 13 Sep 00 1 May - 13 Sep 00 Mission Implications: Ramp down 135 daysMission Implications: Ramp down 135 days

6 Eielson Hydrant Fueling Sys FY00 DLA MCP,$26MFY00 DLA MCP,$26M Install 20 fueling hydrants on main ramp (concurrent w/ repair KC-135 ramp) Install 20 fueling hydrants on main ramp (concurrent w/ repair KC-135 ramp) Planned constructionPlanned construction 1 May - 13 Sep 00 1 May - 13 Sep 00 Mission Implications: 5-month ramp disruptionMission Implications: 5-month ramp disruption

7 Elmendorf Bulk Fuel Storage FY98 DLA MCP,$21.7MFY98 DLA MCP,$21.7M Adds 3 new 83,000 BL JP-8 bulk fuel storage tanks on-base Adds 3 new 83,000 BL JP-8 bulk fuel storage tanks on-base Status:Status: 96% Cns/ECD Dec 99 96% Cns/ECD Dec 99 Mission Implications: Doubles on-base fuel storage for air bridgeMission Implications: Doubles on-base fuel storage for air bridge

8 Elmendorf Hydrt Fuel Sys, Ph 1 FY99 DLA MCP,$19.5MFY99 DLA MCP,$19.5M Remove 14/Install 15 fueling hydrants on North ramp (airbridge) Remove 14/Install 15 fueling hydrants on North ramp (airbridge) Status:Status: 38% Cns/ECD Feb 00 38% Cns/ECD Feb 00 Mission Implications: Reduced parking during constructionMission Implications: Reduced parking during construction N

9 Elmendorf Hydrt Fuel Sys, Ph 2 FY00 DLA MCP,$23.5MFY00 DLA MCP,$23.5M Replace 15 fueling hydrants on North ramp (airbridge) Replace 15 fueling hydrants on North ramp (airbridge) Planned constructionPlanned construction Dec 99 - Dec 01 Dec 99 - Dec 01 Mission Implications: Reduced parking during constructionMission Implications: Reduced parking during construction

10 Elmendorf C-130 Parking Ramp FY00 MILCON, $17MFY00 MILCON, $17M Constructs new C-130 parking ramp w/11 fuel hydrants Constructs new C-130 parking ramp w/11 fuel hydrants Planned constructionPlanned construction Dec 99 - Dec 01 Dec 99 - Dec 01 Mission Implications: Minimal impact during construction; will enhance capabilityMission Implications: Minimal impact during construction; will enhance capability

11 Hickam Repair Airfield Pvmnt FY99 MILCON, $5.9MFY99 MILCON, $5.9M Parking ramp repair to preclude major FOD problems Parking ramp repair to preclude major FOD problems Status:Status: 80% Cns/ECD Dec 99 80% Cns/ECD Dec 99 Mission Implications: 15% reduced parking during constructionMission Implications: 15% reduced parking during construction

12 Yokota Replace Runway JFIP HNFC, $36.6MJFIP HNFC, $36.6M Overlay runway with 13.5” thick concrete Overlay runway with 13.5” thick concrete Planned construction Oct 00 - Apr 01 (2 Phases)Planned construction Oct 00 - Apr 01 (2 Phases) Mission Implications: Only partial runway accessible to C-17,Mission Implications: Only partial runway accessible to C-17, C-21, C-130

13 Andersen Hydrt Fuel Sys, Ph 1 FY00 DLA MCP,$24.3MFY00 DLA MCP,$24.3M Replace 20 fueling hydrants, Southwest ramp Replace 20 fueling hydrants, Southwest ramp Planned constructionPlanned construction Dec 99 - Dec 01 Dec 99 - Dec 01 Mission Implications: Limited hydrants for surge capabilityMission Implications: Limited hydrants for surge capability

14 Kunsan Contingency Pavement CY96 CDIP $4.5MCY96 CDIP $4.5M New fighter parking ramp at Taxiway “6” New fighter parking ramp at Taxiway “6” Status:Status: 22% Cns/ECD Apr 00 22% Cns/ECD Apr 00 Mission Implications: New contingency parking for 16 fighter aircraft (in revetments)Mission Implications: New contingency parking for 16 fighter aircraft (in revetments) N

15 Kunsan Access Taxiway CY97 CDIP $3.9MCY97 CDIP $3.9M New taxiway to connect Contingency Runway and north loop aircraft parking area New taxiway to connect Contingency Runway and north loop aircraft parking area Planned construction Dec 99 - Apr 00Planned construction Dec 99 - Apr 00 Mission Implications: Improved use of alternate runway and aircraft movementMission Implications: Improved use of alternate runway and aircraft movement

16 Misawa Widen Taxiway Alpha JFY00 Japanese Facilities Improvement ProgramJFY00 Japanese Facilities Improvement Program HQ AFCEE Site Study in Dec 99 to determine if parallel runway feasibleHQ AFCEE Site Study in Dec 99 to determine if parallel runway feasible Cost/Scope: TBDCost/Scope: TBD Criteria Package to be completed by Jun 00Criteria Package to be completed by Jun 00 Construction Period: TBDConstruction Period: TBD Mission Implications: TBDMission Implications: TBD