WELCOME! October 28, 2013 ODOT District 1 & District 2
ion.ohio.gov 2 October 28, 2013 PURPOSE OF TODAY’S MEETING Provide a project overview Provide a project overview Present Update for HAN Present Update for HAN Present MOT for HAN & Proposed Roundabouts on Lima Ave. Present MOT for HAN & Proposed Roundabouts on Lima Ave. Present D2 update on I-75 north of Findlay Present D2 update on I-75 north of Findlay Listen to your input Listen to your input
ion.ohio.gov 3 October 28, 2013 HAN $11.5 Million funded with Turnpike Funding Independent project 2014 construction IR-75/US-224 interchange status:
ion.ohio.gov 4 October 28, 2013 PROJECT OVERVIEW – HAN Reconstruct of I-75 interchange with USR 224 Reconstruct of I-75 interchange with USR 224 Reconstruction and widen of bridge Reconstruction and widen of bridge Adding lanes Adding lanes Turn Lanes on and off bridge Turn Lanes on and off bridge Replacing existing signals Replacing existing signals
ion.ohio.gov 5 October 28, 2013 MAINTENANCE OF TRAFFIC HAN Part-width construction Part-width construction One lane in each direction One lane in each direction Closures/Detours: Closures/Detours: Short duration closures of ramps and USR 224 Short duration closures of ramps and USR 224 Short term use of ramps to maintain I-75 traffic Short term use of ramps to maintain I-75 traffic
ion.ohio.gov 6 October 28, 2013 PROJECT OVERVIEW – HAN
ion.ohio.gov 7 October 28, 2013 PROJECT OVERVIEW – HAN Construction scheduled for 2017 but could begin as early as 2015 Construction scheduled for 2017 but could begin as early as 2015 Reconstruct & widen I-75 to 6 lanes Reconstruct & widen I-75 to 6 lanes New Right-of-Way Required New Right-of-Way Required Began to purchase R/W Feb Began to purchase R/W Feb Current Estimated Construction Cost: $150 Million Current Estimated Construction Cost: $150 Million
ion.ohio.gov 8 October 28, 2013 PROJECT OVERVIEW – HAN Harrison St overpass reconstructed Harrison St overpass reconstructed Lima Ave interchange reconstructed with US68/SR15/IR75 interchange Lima Ave interchange reconstructed with US68/SR15/IR75 interchange New Service Rd near ODNR New Service Rd near ODNR Roundabouts on Lima Ave at ramps Roundabouts on Lima Ave at ramps
ion.ohio.gov 9 October 28, 2013 PROJECT OVERVIEW – HAN The following overpasses will not be replaced as part of this project: The following overpasses will not be replaced as part of this project: CR 88 – Sandusky Street CR 88 – Sandusky Street SR 12 – Main Cross Street SR 12 – Main Cross Street US 224 – Construction 2014 US 224 – Construction 2014 CR 95 – Bigelow Avenue CR 95 – Bigelow Avenue CR 99 CR 99
ion.ohio.gov 10 October 28, 2013 MAINTENANCE OF TRAFFIC HAN MOT is preliminary at this time MOT is preliminary at this time Project separated into Four Zones Project separated into Four Zones 3 MOT Methods 3 MOT Methods Maintaining 2 lanes each direction on I-75 and 1 lane each direction on US68/SR15 Maintaining 2 lanes each direction on I-75 and 1 lane each direction on US68/SR15 Hybrid Method – System to System Interchange Hybrid Method – System to System Interchange
ion.ohio.gov 11 October 28, 2013 MAINTENANCE OF TRAFFIC HAN – MOT ZONES
ion.ohio.gov 12 October 28, 2013 MOT - TYPICAL SECTIONS (ZONE 3 – PART-WIDTH)
ion.ohio.gov 13 October 28, 2013 HAN – HYBRID MOT
ion.ohio.gov 14 October 28, 2013 I-75 NORTH TO US68/SR15 & LIMA AVE
ion.ohio.gov 15 October 28, 2013 I-75 SOUTH TO US68/SR15 & LIMA AVE
ion.ohio.gov 16 October 28, 2013 US68/SR15 & LIMA AVE TO I-75 NORTH
ion.ohio.gov 17 October 28, 2013 US68/SR15 & LIMA AVE TO I-75 SOUTH
ion.ohio.gov 18 October 28, 2013 LIMA AVE TO & FROM US68/SR15
ion.ohio.gov 19 October 28, 2013 LIMA AVE TO & FROM US68/SR15
ion.ohio.gov 20 October 28, 2013 I-75 AREA NORTH OF US68/SR15
ion.ohio.gov 21 October 28, 2013 LIMA AVE - ROUNDABOUTS
ion.ohio.gov 22 October 28, 2013 I-75 NORTH OF FINDLAY Multiple projects funded with turnpike revenue Multiple projects funded with turnpike revenue Reconstruction & widen of I-75 from two to three lanes in each direction Reconstruction & widen of I-75 from two to three lanes in each direction From County Road 99 in Hancock County to I-475 in Wood County From County Road 99 in Hancock County to I-475 in Wood County Distance of 31.6 Miles Distance of 31.6 Miles Estimated Total Cost: $220 Million Estimated Total Cost: $220 Million
ion.ohio.gov 23 October 28, 2013 I-75 NORTH OF FINDLAY
ion.ohio.gov 24 October 28, 2013 I-75 NORTH OF FINDLAY Widening will take place in the existing median Widening will take place in the existing median Median width 84’ for the north 2/3 of the project length and 50’ - 60’ for south 1/3 of the project Median width 84’ for the north 2/3 of the project length and 50’ - 60’ for south 1/3 of the project Cable barrier north of Cygnet Road, concrete barrier south of Cygnet Road Cable barrier north of Cygnet Road, concrete barrier south of Cygnet Road Two lanes of traffic will be maintained throughout the duration of the project Two lanes of traffic will be maintained throughout the duration of the project
ion.ohio.gov 25 October 28, 2013 I-75 NORTH OF FINDLAY: North Baltimore CR 95 to Oil Center Rd. Design Build Project Estimated Cost: $55M
ion.ohio.gov 26 October 28, 2013 I-75 NORTH OF FINDLAY: Oil Center Rd. to Portage Rd. Estimated Cost: $50M
ion.ohio.gov 27 October 28, 2013 I-75 NORTH OF FINDLAY: Bowling Green Portage Rd. to Portage Rd. to Devil’s Hole Rd. Devil’s Hole Rd. Estimated Cost: Estimated Cost: $55M $55M
ion.ohio.gov 28 October 28, 2013 I-75 NORTH OF FINDLAY: Bowling Green – US 6 & I-75 ABC
ion.ohio.gov 29 October 28, 2013 I-75 NORTH OF FINDLAY: Bowling Green Devil’s Hole Rd. to I-475 to I-475 Estimated Cost: $60M $60M
ion.ohio.gov 30 October 28, 2013 I-75 NORTH OF FINDLAY: Construction: Start 2014 Construction complete: 2016 I-75 North of Findlay District 2 Contacts: –Aaron Behrman, ODOT District 2, Design Engineer Phone No.: (419) Phone No.: (419) –Mike Stormer, ODOT District 2, Planning Engineer Phone No.: (419) Phone No.: (419)
ion.ohio.gov 31 October 28, 2013