TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015.

Slides:



Advertisements
Similar presentations
OR 42: County Line Curves Environmental Assessment Purpose and Need February 17, 2009.
Advertisements

The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
The Power Grid ELEC 403 The Citadel Mark McKinney.
Community Working Group Meeting 1Saturday 25 February Stroud to Lansdowne Transmission Line Project Community Working Group (CWG)
Rampion Offshore Wind Farm Onshore Construction Elements.
Governor’s Freight Industry Summit Draft November 12, 2012 Sandra K. Beaupre’ Wisconsin DOT Governor’s Freight Industry Summit Draft November 12, 2012.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
1 Hydro One Networks Guelph Area Transmission Refurbishment (GATR) Project Presentation to Ward 4 residents West End Community Centre, Guelph June 27,
OVERVIEW – SUNDANCE WIND PROJECT PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND Ron Percival Avro Wind Energy Inc. October, 2014.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
The Ministry of Transportation and Infrastructure welcomes you to an Open House for: Trans Canada Highway No.1 Improvements in Salmon Arm Your comments.
Open Space Residential Development Bylaw Town of Rehoboth.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
ATC Major Projects Update Flora Flygt, Director of System Planning Franc Fennessy, Manager of Local Relations Wisconsin Industrial Energy Group August.
The Need for Electric Transmission Improvements in Dane County.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Presented to American Society of Civil Engineers Oregon Section Environmental & Water Resources Group Dana Siegfried David Evans and Associates, Inc.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
Workshop on Disproportionate Costs, 10./ Copenhagen Navigation-related issues of affordability and extended deadlines. Consideration of residual.
GREENWAYS Connecting Communities November Greenways Plan 350 km planned Over 80 km built Construction of 4-5 km / year.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
Implementing Wave Energy Process and Permitting Issues Presented by Therese Hampton February 20, 2008.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Yellowhead Area Transmission System Development
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Every state in the nation benefits from wind energy.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
LPEA BAYFIELD SUBSTATION LA PLATA COUNTY LOCATION & EXTENT REVIEW March 12, 2015.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
2008 Annual Five Year Plan Update 4 For RPG-CREZ Meeting 12/14/2007 Department of Regional Planning Harry Liu.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Progress Briefing - Energy Initiative
Electric Utility Master Plan Update
Rob Conley City of Hamilton
Potholes Supplemental Feed Route Project
Planning and Development Commission
Pacific Power Seismic Preparedness Update
Windsor-Essex Electrical Service Needs and Solutions
Facilitated discussion Sea Farmers Conference 2018
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
WESt Sammamish park project
Manilla Low Level Crossing Project
Presentation transcript:

TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015

2 PRESENTATION OVERVIEW Recap Why we need to replace the transmission line between Terrace and Kitimat Options we studied and consulted on Preferred option selected – and why Next steps TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE

3 SITUATION RECAP Kitimat area supplied from Skeena Substation (SKA) by a single 287 kV transmission line (green) to Minette Substation (MIN) MIN supplies Kitimat with distribution-level power The line is reaching end of life; load growth in area best met with a new, higher capacity line TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE 3

4 OPTIONS RECAP BC Hydro studied/consulted on five options for replacing the existing transmission line FOR CAPACITY (to provide more electricity, in order to meet load growth) Two options: Single 287 kV line down west or down east side of Valley FOR CAPACITY AND RELIABILITY (if one line out of service, the second still provides electricity) Three options involving two new single circuit 287 kV transmission lines: one line on each side of valley; both on the east side; or both on west side For all options, the short line from MIN to KIT would be replaced with a single new 287 kV transmission line TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE

5 PREFERRED OPTION: SINGLE LINE, WEST SIDE DECISION BASED ON: Technical feasibility Constructability Reliability Preliminary environmental and archaeological study results First Nations consultation Stakeholder and public input Cost TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE 5

6 WHY JUST ONE NEW LINE? Higher capacity conductor on the new line will be able to carry more electricity than the conductor on the existing line This means a single new line can meet BC Hydro’s forecasted load growth for the Kitimat area This includes electricity requirements of potential industrial developments, such as LNG facilities Discussions with developers indicate no desire for the additional redundancy that a second line would provide If a second line is needed in the future, it could be built on the east or on the west side of the valley The information we’ve accumulated would help in siting a second line Further consultation would be done before a second line is installed The next few slides will look at – Why west side of valley? TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE

7 FEASIBILITY, CONSTRUCTABILITY, COST While building on either side of the valley is technically feasible, the west side provides some advantages: Terrain on the west side is less challenging than on the east side, making a line on the west side somewhat more reliable. This also simplifies line design. Routing on the west side is about 10 km shorter The overall project cost for building the line on the west side is about 20% less than building on the east side TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE

8 ENVIRONMENT, ARCHAEOLOGY While desk-top studies showed east and west route areas similar for many criteria studied, the western provisional route crosses: Less unstable or potentially unstable terrain Fewer large, interconnected wetland and riparian areas Less high-quality wildlife habitat for the 11 key species reviewed Fewer recreational scenic viewpoints These desktop study results will be further investigated through field studies in 2015 TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE

9 FEEDBACK RECEIVED Feedback from local government representatives, First Nations and 2014 open house participants mostly favored a single line on the west side of valley because: It will largely be out of sight The viewscape along Highway 37 will improve, as the existing line will be removed once the new line is operating reliably Initial studies show potentially less impact to fish, fish habitat and wildlife sites It will not interfere with any future need to widen Highway 37 It will cost less It’s a flexible solution, allowing a second line to be built, when needed TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE

10 WHAT WOULD IT LOOK LIKE? Most structures will be steel H frames Average height approx. 30 metres Right of way width about 44 metres One time additional danger tree clearing of approx. 26 metres on each side of right of way (allowed to grow back after construction) TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE 10

11 TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE

12 NEXT STEPS Detailed environmental and archaeological field studies along the corridor Geotechnical testing along the corridor Detailed design work for the transmission line Ongoing First Nations consultation Stakeholder communications Permitting and Crown Land tenure process Procurement TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE

13 SOME KEY DATES Construction start: 2016/2017 Planned in-service date: 2018/2019 TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE

14 QUESTIONS? For more information: Lesley Wood BC Hydro Stakeholder Engagement ; Or visit: TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE