Santa Maria River Bridges Widening. Project Location.

Slides:



Advertisements
Similar presentations
St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
Advertisements

Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Meridian Road Interchange Rebuild ITD Board Meeting June 18, 2009.
October 9, 2014 Glenn's Bay Road Widening and Interchange Project.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
Fred Luna, SBCAG Paul Martinez, Caltrans District 5 Project Information State Route 246 Passing Lanes 1.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
I-65 Added Travel Lanes Project in Tippecanoe County
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Elements of Highway Design Highway Design SafetyEfficiency.
Circulation in Coventry, the way of the future. By: Mathew Patefield, Alex Kent, Bryan Kearny, John Chamberlain, Nicole Vieira.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
The Roads Ahead Leroy D. Alloway, Director Community Development.
Current Construction Projects Major Projects Pinellas County.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Bicycle path in Vsetín Tomáš Pařízek Radim Látal.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
PLANNING OF TRAFFIC MANAGEMENT SYSTEMS DURING WIDENING OF THE RING ROAD AROUND COPENHAGEN Charlotte Vithen Coordinator of Traffic Management Danish Road.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Federal Project No. BRLO 5951 (151) Bonita School Road Bridge Replacement September XX, 2013 Applicant: Santa Barbara County Public Works Transportation.
MED SR 18 Corridor Project MED PID October 13, 2015.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
Pioneer Road Relocation and Reconstruction Project
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
Interstate 15 North 4/09/2015 Update
Interstate 15 North Phase 4
UTILITY DESIGN SERVICES
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Project Overview Multimodal improvements to 22.5 miles of I-66
Waltham Road (Andover – North Star).
Dallas DISTRICT CURRENT/FUTURE CONSTRUCTION PROJECTS FISCAL Years
Draft 2018 Project Priorities
The Construction team appreciates this opportunity to discuss the work that will begin in October on State Road 397 over Toms Bayou. My name is Mike Sasser,
Lyle Parkway to SR 540 (Winter Lake Road)
Construction Management & Engineering
Current and proposed HOT facilities update
Buckner Road Interchange at I-65 Public Meeting
Presentation transcript:

Santa Maria River Bridges Widening

Project Location

Project Goals Increase capacity –Allow room for more cars Improve operational efficiency –Make maneuvering between lanes easier Increase safety –The collision rate is twice the statewide average

Project Need High traffic count Narrow shoulders Short on-ramps Lack of bike facility Better link between Rtes 135 and 166

Project Purpose Add additional lanes Widen shoulders Increase length of on & off-ramps Add bike lane Improve connection between Rtes 135 & 166

Project Description Widening: Inside and outside of existing bridges –Three 12 foot lanes in each direction –10 foot inside and outside shoulders Bike path: –Completely separated from traffic by concrete barrier –next to SB lanes –Connections: South end: connects to levee trail North end: veers west to connect Hutton Road

Schedule –Begin Construction Fall 2011 –Complete Construction Spring 2014

Construction Costs Anticipated Construction Costs: –Contractor: Flatiron West Inc. –Contract Amount: $30.9 million