Santa Maria River Bridges Widening
Project Location
Project Goals Increase capacity –Allow room for more cars Improve operational efficiency –Make maneuvering between lanes easier Increase safety –The collision rate is twice the statewide average
Project Need High traffic count Narrow shoulders Short on-ramps Lack of bike facility Better link between Rtes 135 and 166
Project Purpose Add additional lanes Widen shoulders Increase length of on & off-ramps Add bike lane Improve connection between Rtes 135 & 166
Project Description Widening: Inside and outside of existing bridges –Three 12 foot lanes in each direction –10 foot inside and outside shoulders Bike path: –Completely separated from traffic by concrete barrier –next to SB lanes –Connections: South end: connects to levee trail North end: veers west to connect Hutton Road
Schedule –Begin Construction Fall 2011 –Complete Construction Spring 2014
Construction Costs Anticipated Construction Costs: –Contractor: Flatiron West Inc. –Contract Amount: $30.9 million