Director’s Review July 25-27, 2006 T. Shaw1 DES Review DES Front End Electronics WBS 1.3 T. Shaw.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Brenna Flaugher Sept. 26, The Dark Energy Survey Camera: DECam 1.1 Management 1.2 Focal Plane Detectors 1.3 Front End Electronics 1.4 Optics 1.5.
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Pre-Director’s Review Findings & Recommendations RecommendationManagerStatus 9Update BOE for AlN boardsShawDone 10Establish the budget profile ASAPFlaugherDone.
ESODAC Study for a new ESO Detector Array Controller.
1 CCD RAIN (PHOTONS) BUCKETS (PIXELS) VERTICAL CONVEYOR BELTS (CCD COLUMNS) HORIZONTAL CONVEYOR BELT ( SERIAL REGISTER ) MEASURING CYLINDER (OUTPUT AMPLIFIER)
Detector Array Controller Based on First Light First Light PICNIC Array Mux PICNIC Array Mux Image of ESO Messenger Front Page M.Meyer June 05 NGC High.
Science Specification Table 12 keV keV for neutral particles 40.5 cm 2 image plane Electronic Noise 3 keV FWHM Proton Dead Layer
E. Hazen, Boston University BU Meeting, Apr. 6, 2001 Front-end Readout of the CMS Hadronic Forward Calorimeter (HF) Conceptual Design (Summary) by Eric.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
DES Collaboration Meeting, Chicago, December 11-13, 2006 T. Shaw1 DES Collaboration Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky,
DES Collaboration Meeting, Chicago, December 11-13, 2006 T. Shaw1 DES Collaboration Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky,
Cabling and connectors for future LAV stations Mauro Raggi LAV working group CERN 26/10/2009.
Todd Moore for the DES CollaborationPSTalkJune 13 th, DES MONSOON LINEAR POWER SUPPLY SELECTION Todd Moore University of Illinois, at Urbana-Champaign.
CCD and CCD readout : Engineering diagnostics during development, commissioning and operation Pierre Antilogus C. Juramy, H.Lebbolo, S. Russo, V.Tocut.
Todd Moore for the DES CollaborationApril 20 th, Quick Summary of Noise Test Results. Noise test software & hardware setup. Earth grounding/shielding.
ZTF Interconnecting Scheme Stephen Kaye
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Feasibility of Optical Wireless transmission systems for CTA R. Corsini, A. Wajahat, E. Ciaramella Scuola Superiore Sant’Anna, TeCP, Pisa, Italy R. Paoletti.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Clock Board Test and Preliminary Acceptance Criteria Ciemat (Madrid), April 2009 Juan de Vicente, Javier Castilla, Gustavo Martínez.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
DES PMG Meeting, January 26, 2007 T. Shaw1 DES PMG Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky, J. Olsen, W. Stuermer (FNAL)
Juan Estrada July 25, Focal Plane Detectors WBS 1.2 this talk Breakout session L. Buckley-Geer J.E. T.Diehl H. Cease Multi CCD (part of WBS 1.5)
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Todd Moore for the DES CollaborationApril 3 rd, Quick Summary of Noise Test Results. Noise test hardware & software setup. Earth grounding/shielding.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Status Review Dec. 1, 2003 Mark Hunten MONSOON Project Manager NOAO MI Program.
Single Board Controller Comments Roger Smith Caltech
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Todd Moore for the DES CollaborationNov 28, Noise test hardware & software setup. Earth grounding scheme utilized for noise tests. Block diagram.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Hardware proposal for the L2  trigger system detailed description of the architecture mechanical considerations components consideration electro-magnetic.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Updated HBD FEM Diagram Clock Master Clock fanoutADC Optical out Backplane Crate GTM/Ethernet New Daughter card + DCM Test pulse.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
C. Beigbeder Final design Review ECAL/HCAL Frond End  FE board : current prototype  Test results Qualification Clock adjustment Noise analysis  FE board.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
UV - Visible Systems Peter Moore AURA / NOAO / ETS.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
TPC electronics Status, Plans, Needs Marcus Larwill April
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
Single Board Controller Comments Roger Smith Caltech
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Differential Signal Path for 64 ch ZTF Mosaic Roger Smith and Stephen Kaye California Institute of Technology.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
PID meeting SNATS to SCATS New front end design
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
CMS EMU TRIGGER ELECTRONICS
Fiber Based Synchronous Timing System
PID meeting Mechanical implementation Electronics architecture
RPC Electronics Overall system diagram Current status At detector
Presentation transcript:

Director’s Review July 25-27, 2006 T. Shaw1 DES Review DES Front End Electronics WBS 1.3 T. Shaw

Director’s Review July 25-27, 2006 T. Shaw2 DES FE Project Definition We must read out a large focal plane of CCDs 62 Science CCDs 8 Alignment CCDs 4 Guide CCDs The Science and Alignment CCDs are read out at the same rate with the same clocking patterns 10e - rms noise The Guide CCDs will be readout at a faster rate; will not interfere with required “quiet” time of Science and Alignment CCDs

Director’s Review July 25-27, 2006 T. Shaw3 DES FE Electronics WBS structure

Director’s Review July 25-27, 2006 T. Shaw4 LBL CCD Vsub HI_UHI_L H2_UH2_L H3_UH3_L Vr_UVr_L RG_URG_L Video_UVideo_L Vdd_UVdd_L Vopg_UVopg_L SW_USW_L TG p+ guard FS1 FS2 FS3 V1 V2 V3 n+ guard Vsub CCD Bond Pads 2048 x µm pixel CCD Vertical clocking moves charge towards serial register Horizontal clocking moves charge along serial output register to video output amplifiers

Director’s Review July 25-27, 2006 T. Shaw5 Signal Count per CCD Each CCD will require control of the following signals: Horizontal clocking H1_U, H1_L, H2_U, H2_L, H3_U, H3_L, SW, RG Vertical clocking V1, V2, V3, TG Erase control n+ guard Bias voltages Vr_U, Vr_L, Vdd, Vopg, Vsub Totals: 13 clocks per CCD 5 bias levels per CCD “Tuning” of optimal CCD readout is accomplished by adjusting clock rail voltages and bias settings. We are assuming, relying on current test results, that production readout can group at least 3 CCDs together with like clock rail settings.

Director’s Review July 25-27, 2006 T. Shaw6 CCD Packaging – Picture Frame WBS CCD is wire bonded to a polymide board

Director’s Review July 25-27, 2006 T. Shaw7 CCD Packaging – Pedestal Package WBS CCD is wire bonded to an AlN board 37-pin Nanonics Dualobe connector

Director’s Review July 25-27, 2006 T. Shaw8 Monsoon Readout System WBS Monsoon –Developed by NOAO –Crate based system (Eurocard format) –cPCI backplane used (no cPCI protocol) –Open Design Schematics available Firmware available Layout files available –Boards exist Master Control Board Clock and Bias Board 8 Channel Acquisition Board –Large software framework exists

Director’s Review July 25-27, 2006 T. Shaw9 Monsoon Block Diagram

Director’s Review July 25-27, 2006 T. Shaw10 Monsoon Crate MCBCBB8-Ch CCD Acq.

Director’s Review July 25-27, 2006 T. Shaw11 History of Monsoon at FNAL Mid 2004 DES group looks into the Leach and Monsoon Systems as possible readout solutions. Leach is an established proprietary readout system for CCDs. Monsoon offered some advantages – higher density (8 channel card vs 2 channel card of Leach); telemetry readout (readback of clock rail voltages and bias voltages); designed for large mosaics; open architecture; easy to customize. (Lots of manpower already expended by NOAO on Monsoon ~12 engineering years/~5 programmer years/~5 board layout years.) University of Illinois Urbana-Champaign began to purchase the initial Monsoon test stands. March 2005 FE workshop at FNAL; decision to continue to pursue Monsoon as readout platform. April 2005 Receive MCB, CBB and a blank prototype 8 ch CCD Acq Board to be hand assembled. Never able to achieve low noise. Nov 2005 Delivery of 2 complete Monsoon systems (MCB, CBB and production 8 ch CCD Acq Board). Fairly quickly began running with <10e - noise at ~12us/pixel. Jan 2006 FNAL takes delivery of Leach System. Leach performance quickly matches Monsoon performance. Feb 2006 FEE Panel formed to examine choice of design platform. Specifically, to look at Leach and Monsoon.

Director’s Review July 25-27, 2006 T. Shaw12 History of Monsoon at FNAL Feb 2006 Delivery of two additional complete Monsoon Systems. One was shipped to Barcelona Mar 2006 With “short” cable run, we are able to achieve ~6.5e - noise at ~6us/pixel April 2006 With a pre-amp (WBS 1.3.5) located outside of dewar wall, we are able to achieve ~6.5e - noise at ~6us/pixel with a long cable June 2006 FEE Panel tasked with examining choice of Monsoon vs Leach comes back with its findings. In summary Monsoon work seems to be progressing Keep an eye on 12 Channel Board design; fallback to use current 8 Channel Board Leach Controller remains a viable alternative in case of unforeseen problem with Monsoon. July 2006 Delivery of fourth Monsoon system for FNAL

Director’s Review July 25-27, 2006 T. Shaw13 Pre-amp Board (WBS 1.3.5) currently outside of dewar

Director’s Review July 25-27, 2006 T. Shaw14 Proposed Changes to Monsoon To use the Monsoon System for DES, we will customize the boards for our specific application: –Build a 12 channel CCD Acq Module which would provide customized bias voltages, RTD readout, and Vsubstrate ramp control. (WBS 1.3.8) –Build a customized Clock Board to better address our clocking needs; greater fanout ability to drive more clocks. (WBS 1.3.7) –Slight modification to the Master Control Board to allow for switch to S-Link as the fiber optic link. (WBS 1.3.9) Breakout session will cover these new board designs in more detail.

Director’s Review July 25-27, 2006 T. Shaw15 PF Packaging WBS UIUC has worked with FNAL mechanical engineers and proposes to instrument the telescope using three FE crates. These crates would each contain two backplanes; one with 6 slots and one with 4 slots. A single 4-slot section would provide for readout of up to 9 guide CCDs The remaining backplane sections would provide readout of up to 72 science and alignment CCDs. UIUC is also providing engineering support for crate power supplies.

Director’s Review July 25-27, 2006 T. Shaw16 Vacuum Interface Board(VIB) WBS Vacuum Interface Board will provide the connection between the Monsoon boards and the CCDs on the focal plane. Monsoon cables will plug into the VIB outside the vacuum. Kapton cables will be used to connect between Vacuum Interface Board and the CCDs inside the dewar.

Director’s Review July 25-27, 2006 T. Shaw17 Vacuum Interface Board WBS Kapton Cable WBS AlN Board WBS Camera Vessel Instrumentation

Director’s Review July 25-27, 2006 T. Shaw18 DES FE Electronics L3 Milestones

19 Monsoon Electronics Schedule & Milestones

20 DES Electronics Schedule & Milestones

Director’s Review July 25-27, 2006 T. Shaw21 Engineering Teams/Responsibilities FNAL (T. Shaw, D. Huffman, M. Kozlovsky, Jamieson Olsen, Walter Stuermer) Instrumentation of CCD testing stations 12 Channel CCD Acq Module & Transition Vacuum Interface Board Cabling Pre-amps UIUC (T. Moore, V. Simaitis) Crate Power Supply Barcelona (Laia Cardiel, Miquel Barceló) Clock & Bias Board Fanout Transition Module Clock Board Transition Master Control Board Madrid (Gustavo Martinez, Javier Castilla, Juan De Vicente) Clock Board Groups in Spain will design and produce Clock Board and Master Control Board. FNAL will prototype 12 Channel CCD Acquisition Board; Spain will produce the board.

Director’s Review July 25-27, 2006 T. Shaw22 FE Electronics Costs

Director’s Review July 25-27, 2006 T. Shaw23 Conclusions FE Readout is based upon the Monsoon system. This is working for the readout of our small test dewars. New customized Monsoon modules are being designed to address specific DES requirements. Leach remains as a fallback to the Monsoon readout solution. Next plans: Readout an array of CCDs in the large test dewar. Optimize cable design; location of pre-amp.

Director’s Review July 25-27, 2006 T. Shaw24 Backup slide

Director’s Review July 25-27, 2006 T. Shaw25 Monsoon Quantity/Cost estimates