Www.enickel.co.uk Trials and Tribulations of Metallurgical Development Simon Purkiss, Managing Director September 2008.

Slides:



Advertisements
Similar presentations
1 JESSICA Joint European Support for Sustainable Investment in City Areas Horizontal Study European Investment Bank From evaluation to operation The Handbook.
Advertisements

REALTY KNOWLEDGE ARBITRAGE ADDING VALUE THROUGH AT LandSmiths Projects Pvt. Ltd. Credentials Statement.
Current UK and EU Policy on Water Management Thames Tunnel Commission 29/7/11.
London Stock Exchange Interim Results 6 November 2003.
Engineering Economics Analysis Dr. Nabeel Yousef
Mining in Latin America Ralph Lutes, Vice President, Asia, Executive Director & General Manager, Teck China October 22, 2014.
BUSINESS WITH CONFIDENCE icaew.com A presentation by Clive Lewis Head of Enterprise, ICAEW Managing the recovery and ensuring growth.
1. Investor Presentation April Disclaimer DISCLAIMER: This presentation contains forward-looking statements including but not limited to comments.
Contents Background and Introduction What is Private Equity?
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
Financing Renewable Energy Projects: Issues and Opportunities Peter Y. Flynn Bostonia Partners July, 2013.
Current Trends in Mining Finance: Strategic and Financial Challenges Roy Hinkamper, KPMG LLP April 2013.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Case Study Water and Waste Water Infrastructure Northern Ireland.
Wesizwe Platinum Limited “Wesizwe Platinum – a “first of its kind” Chinese/South African Platinum Mining Partnership” A Presentation at the African Mining.
Aker Exploration: Rig for oil Status and Outlook Bård Johansen, President & CEO.
Chapter 18 RAISING LONG – TERM FINANCE  Centre for Financial Management, Bangalore.
4/16/2017 SHERRITT INTERNATIONAL Ambatovy Nickel Project: A Progress Report March 2008.
Massimiliano Di Pace1 EU TRADE POLICY Eu provides also initiatives, financing and services to support Eu companies’ efforts for internationalisation The.
EPSRC Collaboration Fund 23 June 2010 Sam Decombel Finance South East.
Recommendation: BUY Sandstorm Gold (SNDXF). Industry Overview 2 Gold mining is capital intensive Capital is very expensive for small exploration and production.
An Enterprising University Roger Ford Chair of Innovation and Technology Strategy.
Lloyd’s Strategy January © Lloyd’s2 Lloyd’s vision Key Characteristics A subscription market backed by mutual security A broker market;
Grants to grow your Business Sue Tilley Economic Growth & Investment Manager LLEP.
1 Water in Bioenergy Agroecosystems Workshop Industry perspective on water for bioenergy production Alistair Wyness, BP International Group Water Expert.
AN INTRODUCTION TO ANGLO AMERICAN. 2 ANGLO AMERICAN Anglo American is a global diversified miner with a market capitalisation of more than $70bn and interests.
Half Year Results Presentation to Media David Murray 12 February
Regional Resource Efficient and Cleaner Production Demonstration Component EaP GREEN Program Malkhaz Adeishvili National Coordinator in Georgia 26 June,
Meet the Management AIB Investor Day London, 8 th November 2006 Robbie Henneberry Managing Director – AIB Group (UK) p.l.c.
The Importance of Feasibility Studies for Project Financing FINEX 2012.
1 Evolution and opportunities in the Greek capital market May 2001 Dr Panayotis Alexakis President of the Athens Stock Exchange (ASE) and the Athens Derivatives.
Private Sector Operations The AfDB as a Development and Business Partner July 20, 2011.
Grattan Institute / MEI Energy Futures Event Dr Fiona Wild Vice President, Environment and Climate Change 5 March 2015 Newman, Iron Ore.
The Global Fund- structure, function and evolution February 18, 2008.
August DISCLAIMER The following information contains, or may be deemed to contain, “forward-looking statements” (as defined in the U.S. Private.
PIPER JAFFRAY COMPANIES APRIL 13, CAUTION REGARDING FORWARD-LOOKING STATEMENTS Statements contained in this presentation that are not historical.
Equity income: a niche asset class Neil Margolis, Portfolio Manager May 2007.
Assistant Secretary of the Army (Installations, Energy & Environment) UNCLASSIFIED Privately Financed Projects - Keys To Success Ms. Kathy Ahsing August.
Page 1 5/10/2015 XX_OHXXw.ppt Demand vs Supply Resources Steve Hamblyn Wednesday 16 August 2006.
AB209 Small Business Management Unit 2 – Getting Started: From Idea to Business Venture.
CERBA International Mining Conference Presenting: ………………… Dmitry Yakushkin, Director of Communications ……………………… March 4, 2008.
Rural Development Council 8 th December Contents Scottish Enterprise Focus Economic Downturn Implications & Actions Core Rural Objectives HIE Economic.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Sintering of Laterite ores
HANCOCK PROSPECTING Hope Downs Iron Ore Project The Current Status 7 th Annual Global Iron Ore & Steel Forecast Conference Perth, 2004 Russell Tipper –
2 Current trend: growing IPO market 52 IPOs since January 2010, raising a total of £6.7 bn Significant international transactions: –March 2010: African.
EU COMMON STRATEGIC FRAMEWORK FUNDS IN ENGLAND INITIAL PROPOSALS FROM HMG 21 NOVEMBER 2012.
LEGAL UPDATE: E&P Legislation in 2010 Presentation to the Energy Committee of the Association of European Businesses 4 February 2011 Natalia Kozyrenko,
Mine 2011 The game has changed Jason Burkitt Mine Africa 26 September
Feasibility Study.
Presentation to Membership. A Recap of Our Process February 2009: Decision to renew strategic plan March 2009: Engagement of Berlin, Eaton.
AB209 Small Business Management Unit 3 – Planning the Business and its Products or Services.
European Regional Development Fund EUROPEAN UNION Investing in your future Operational programme „Development of the competitiveness of the Bulgarian economy“
European Bank for Reconstruction and Development Financing Renewable Energy Projects in Bulgaria Anton Kobakov Senior Banker RO Sofia, Bulgaria.
2015 YEAR END RESULTS 17 March 2016 Arbuthnot Banking Group PLC.
First Quarter 2013 Earnings Conference Call April 18, 2013.
Mineral supply constraints necessitate a global policy response Edmund Nickless Chair International Union of Geological Sciences New Activities Strategic.
Fourth Quarter / Full Year Earnings 2008 Kimberly Ross Chief Financial Officer March 2, 2009.
Endurance Insurance Operations Michael P. Fujii President & CEO Worldwide Insurance Operations Bermuda in Boston Conference September 18, 2007.
1 UK/Europe September 2003 The Tampakan Project. 2 INDOPHIL-THE COMPANY Market Listed ASX (IRN) Share price $ Aug 2003 Capitalization $47 M Capital.
Planet Microcap Showcase Chuck Cronin, VP Carbon Solutions
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
BP Global Environmental Products
York, North Yorkshire & East Riding Local Enterprise Partnership Bio-economy Growth Fund Application process September 2016.
S E C O N D Q U A R T E R Financial results
European Innovation Council Pilot (EIC)
Sustainability Internal Drivers and Self-Assessment Dennis J. Stamm
University of Muenster Consulting
Western, Central and Eastern Basin LONG TERM SOLUTION TO AMD
Financing Stages (Mining)
Presentation transcript:

Trials and Tribulations of Metallurgical Development Simon Purkiss, Managing Director September 2008

Disclaimer Certain statements in this document relate to the future, including forward looking statements relating to financial position and strategy. These forward looking statements involve known and unknown risks, uncertainties, assumptions and other important factors that could cause the actual results, performance or achievements could be materially different from future results, performance or achievements expressed or implied by such statements. Such risks, uncertainties, assumptions and other important factors include, among other things, general economic conditions, exchange rates, interest rates, the regulatory environment, structural changes in the industries in which the Company operates, competitive pressures, selling price and market demand. The forward looking statements in this document reflect views held only as of the date of this document. 2

Overview of European Nickel Emerging mid-tier nickel laterite producer focused on growth Production potential of over 50,000tpa Ni within 5 years Developers of innovative, simple, low cost heap leach process Technology partner with BHP Billiton Geographic diversification: Turkey, the Philippines and Albania Attributable nickel resource base of ≈2.1 million tonnes (JORC 1Mt) Highly experienced and strong management team Listed on London’s AIM with good liquidity. Ticker: ENK Ambition: To be mid-tier, low cost global Ni laterite producer 3 3

Nickel Laterite Processing Laterites are the future of nickel – majority of resources in the ground Unlike sulphides, no upgrade steps Two main processing routes –Ferronickel smelting Reduce total orebody in kilns with coal/oil Smelt total orebody to molten state Production of 20-40% ferronickel product –High Pressure Acid Leach (HPAL) Subject total orebody to high temperatures & pressure in sulphuric acid Refiner liquor Production of 99.99% nickel metal 4 4

Drawbacks Limited use of orebody –Narrow constraints of “other” ore components –Ferronickel smelting, low iron saprolites –HPAL, low magnesium limonites –Rest of ore body waste High capital costs –$2-4bn for 40-60ktpa nickel production Operating costs –Energy dependant 5 5

Alternatives Caron process –Ammonia leach, one operation Chinese processing –Pig nickel Blast furnaces –High coking coal, inefficient, 4-8% ferronickel, impure, polluting, high operating costs, very low capital Ferronickel smelters –High energy consumption, 8-12% ferronickel, impure, polluting, high operating costs, low capital costs Heap leaching 6 6

Heap Leaching Common in copper, gold industry 25 years experience to very large scale Low capital costs, plastic and pumps Low operating costs, no moving parts Environmentally benign Wider range of orebody can be treated Ideal for nickel laterite treatment? 7 7

Metallurgical Development Metallurgical development can be expensive Akin to geological exploration, maybe not as black and white Can be time consuming and difficult to stage develop –Laboratory work –Large scale tests –Pilot scales tests –Full scale development Short-cuts could be expensive Aim is to have the Financing Bank’s engineers sign off on the process 8 8

Development of the Çaldağ Project, Turkey Initial laboratory tests positive Decision to fast track into pilot scale to reduce time & development costs New intermediary product, Mixed Hydroxide product (MHP) to further reduce full scale capital costs Higher risk but risk assessment identified: –Major risk in scale up to full height heap –New product MHP required market development so sufficient material required –Demonstration of process to local stakeholders identified as critical 9 9

Heap Leach pilot plant 10 35% Ni 25% Ni 10 Simplified Flow Sheet

More photos

More photos

Leach results Nickel extraction >75% Cobalt extraction >75% Leach rate continuing Flux dependant Turkey Mediterranean Sea Black Sea

The Financing Route Private equity funded for first 2 years Convertible note from Standard Bank $2.5m November 2003 IPO on AIM £15m March 2004 Options exercised by BHP Billiton $10m 2004/2005 as milestones achieved Bankable feasibility study completed March 2006 Equity raising $155m May 2006 Development started 17

Technology development From start of project to bankable equity raising was approx. 30 months Heap leaching demonstrated to independent engineers satisfaction Product circulated to various refineries & smelters and price structure developed Local stakeholders satisfied with environmental aspects of the technology Government EIA granted 18

Not All Risks Can Be Factored In….. EIA approved by Turkish Govt. in January 2006 Equator Principles compliant ESIA in April 2006 Forestry application in June 2006 Furore over 1 million trees felled by developer outside Istanbul in Sept 2006 Freeze on grant of forestry permits Turkish Govt. election period from July – Sept 2007 Visit by Minister Eroğlu to the site in Dec 2007 ENK planted over 11,000 trees during 2007 ENK’s 1st Sustainability Review published in March 2008 Implementing ICMM Principles for Sustainable Development & Voluntary Principles on Security and Human Rights Forestry permit application submitted May

Overview of the Çaldağ Project 100% ownership JORC proven reserve of 375,000t contained Ni Production target 20,000tpa Ni, 1,200tpa Co Life of Mine 15 years Total nickel production 258,000t Ni Open pit, low cost operation LOM off-take agreement with BHP Billiton Located close to deep water port Izmir Awaiting forestry permit 20

Establishing a Mid-Tier Nickel Producer European Nickel is leveraging off its simple, low cost technology to become a mid-tier nickel producer Heap leach technology applicable on equatorial laterites –Permeability & recovery in a high rainfall region –Product enhancements Technology has enabled European Nickel to acquire strategic stakes in juniors with large resources but no metallurgical ‘know how’ –JV with Rusina Mining on Acoje deposit in Philippines –19.3% stake in Toledo Mining –Combined, these 3 projects have potential of 90,000tpa 21

Conclusion Metallurgical development –Not for the faint hearted –Will cost more than you budgeted –Assistance from Major (BHPB) invaluable –Clear target required –Short-cuts traded off against risk and expenditure Financing development –Continued evaluation on economics, meeting the investment grade 22

The New Industry Paradigm Costs through the roof – construction, materials, diesel, raw materials Skills shortage – all key disciplines across all continents Rise of NGOs in 24/7 news media world Credit crunch 23

European Nickel Investment Case Exposure to nickel - strong fundamentals Low cost entry into laterites – the future of nickel Simple heap leach process offers competitive edge over other expensive laterite technologies Geographic diversification Large resource base and growing Project pipeline potential of +100,000tpa Ni Focused on a Clear Vision To become a mid-tier global nickel producer, targeting 50,000tpa in five years, by leveraging off the competitive edge offered from proprietary, low cost process 24