Bokan Dotson Ridge Heavy Rare Earths. This presentation may contain forward-looking statements including, but not limited to, comments regarding the timing.

Slides:



Advertisements
Similar presentations
Photo Book: The Deer Trail Mine Story Piute County Utah Q
Advertisements

Murray River Project Update Coal Forum October 2013.
BUILDING A SUSTAINABLE MINE UNBC April This document contains ‘‘forward-looking information’’ within the meaning of the United States Private Securities.
Rare Earth Elements’ Processing; Current and Emerging Technologies, and evolving needs within the Manufacturing Sector, SME (NYC) October 18,, 2011 Jack.
2008 Second Quarter Results TSX: LUN NYSE: LMC OMX: LUMI.
1st Quarter 2012 Results May 10, 2012 Tom Mair President and CEO.
Ely Copper Mine Nicholas Dove, Meghan Arpino, Kelsey McAuliff, Jordan Monahan, Nikola Pejovik, and Walt Auten.
How to Set Up a Processing Plan in MSOPIT’s Economics Panel.
Creating a New Exploration Growth Story March 2009.
A Growth Company Producing Rare Precious Metals Palladium & Platinum June 7, 2000.
1 NYSE MKT: REE & TSX: RES Bear Lodge Critical Rare Earth Project Technology Metals Summit – March 2013 A Year of Dramatic Change.
1. Investor Presentation April Disclaimer DISCLAIMER: This presentation contains forward-looking statements including but not limited to comments.
1 Mineral Enterprise Corporation Investor Presentation MINENCO.
Understanding and Valuating Exploration Companies 24 May 2007 Shane Hunter.
Arafura Resources Limited (ASX: ARU) Arafura Resources Limited 2 nd Annual Technology Metals Summit April 2013, Toronto.
TSX: SGR OTCQX: SGRCF 1 SAN GOLD CORPORATION CORPORATE PRESENTATION TSX: SGR OTCQX: SGRCF JUNE 2013.
29 August 2013 AMD Debate Technical solutions and funding models for the Acid Mine Drainage problems of South Africa.
1. Forward Looking Statements/Additional Information and Cautionary Note Regarding Hydrocarbon Disclosure Except for the historical information contained.
CAUTION CONCERNING FORWARD-LOOKING STATEMENTS This presentation contains “forward-looking information” within the meaning of Canadian Securities legislation.
Wesizwe Platinum – Building a Resilient Organisation Jacob Mothomogolo Projects Executive, Wesizwe Platinum Limited 30 October 2013.
Platina Resources Limited Rob Mosig, Managing Director Greenland Sustainable Mineral & Petroleum Development Conference 2010.
Rare Earths Power Breakfast March 7, 2011 Don Bubar, President & CEO.
SITE REMEDIATION ISSUES IN RELATION TO NORM INDUSTRIES IN MALAYSIA M. OMAR MALAYSIAN NUCLEAR AGENCY.
International Atomic Energy Agency Uranium Geology and Deposits, Exploration, Mining and Milling and Environmental Issues Seminar on Nuclear Science and.
Uranium exploration and development in the heart of Niger’s uranium-producing district  Niger is a major uranium producer since the 1970’s,
Agnico-Eagle Mines Limited1. 2 Growth Strategy Building Value Through Production and Reserve Growth Produce more gold targeting over 1.2 million ounces.
European Innovation Partnership on Raw Materials Conference on Initiatives related to the EIP on Raw Materials, 19 April 2013 Work Package 1 Technologies.
1 Russian Steel Industry Domestic growth and export capacities May 2011.
Cardero Resource Corp. | TSX: CDU | NYSE-A: CDY FEB 2012 Corporate Presentation October 2012 Carbon Creek Deposit A strategic portfolio of bulk commodities.
Overview of Analyzing Mining Companies March 14, 2012 Chris Callahan| Mining Portfolio Manager This presentation is for informational purposes only, and.
Corporate Overview September Hannon Armstrong Sustainable Infrastructure Capital, Inc. (the "Company") makes forward-looking statements in this.
Doing Business in Central Asia – Kyrgyz Republic and Mongolia John Pearson, Vice President Investor Relations.
Todd Creek (25% Interest) May 2013 An Advanced Exploration Project in B.C.’s Golden Triangle.
1 CHARLEY CREEK ALLUVIAL REE PROJECT TMS2013 Scoping Study Presentation Developing one of the world’s largest, lowest capital cost, rare earths projects.
The Importance of Feasibility Studies for Project Financing FINEX 2012.
1 Dutch Gold Resource, Inc. Company Update April 5, 2012 DGRI: OTCQB.
Commodity Hedging Overview May 10, 2012 The following information is current as of May 10, Memorial Production Partners LP (MEMP) intends to provide.
Grattan Institute / MEI Energy Futures Event Dr Fiona Wild Vice President, Environment and Climate Change 5 March 2015 Newman, Iron Ore.
1 Presented By: Neil McMillan President & CEO Q1 Financials May 14, 2012.
NIUMINCO GROUP LIMITED. Important Information This presentation is not a prospectus nor an offer of securities for subscription or sale in any jurisdiction.
August DISCLAIMER The following information contains, or may be deemed to contain, “forward-looking statements” (as defined in the U.S. Private.
Week 4. SME Weirdness There will be no class from the week of Feb. 16 to 20 th Your report on this work load will be presented on Tuesday Feb. 24 th This.
Presented by: John Fulton, Non-Executive Chairman Marie Bray, Finance Director 13 August 2014.
Presentation Annual General Meeting – June
Mining And its environmental impact. What determines the type of mining? Underground v.s. Surface Mining v.s. Solution Underground v.s. Surface Mining.
BROKER PRESENTATION December Disclaimer & Confidentiality Notice  The information contained in this Presentation or subsequently provided to the.
Shareholder’s Breakfast March 28, Notice Statements contained in this report that are not purely historical are forward-looking statements within.
CERBA Annual Mining Conference 2011 Success in Central Asia John Pearson Vice President, Investor Relations.
Mineral Mining. Take a ride inside a mine video – Warm Up Video.
Mineral Resources. What is a mineral resource? Any [ ] of naturally occurring material in or near the Earth’s crust. – Can be extracted and processed.
Liquid Fluoride Thorium Reactors. Overview Introduction to nuclear reactors Fundamentals of LFTR (Liquid Fluoride Thorium Reactors) Economic viability.
EURASIA – MENA Mining, Industrial Minerals and Mineable Energy Trade & Investment Summit May 17, 2012.
Extraction Metallurgy Ammar R. H. Alshemary Assistant Lecturer Department of Materials Engineering University of Kufa.
Overview November Safe Harbor Statement ♦Some of the statements included herein may include forward-looking statements which reflect our current.
MINING. Mineral Resource: Naturally occurring material in or on Earth’s crust that can be extracted and processed into useful materials for a profit.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
Exploration Valuation Dean Carville 6 December 2012.
Lecture Outlines Physical Geology, 14/e Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Plummer, Carlson &
Investor Presentation Disclosure Regarding Forward-Looking Statements Forward-Looking Statements: This presentation contains, and the officers.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Industry Primer - Metals and Mining
Nunavut Water Board Community Meeting Doris Water Licence Amendment January 28, 2016 – Cambridge Bay, NU.
Rare Earth Elements (REE) licence Mongolia
Central Nevada Lithium Brine Projects
Medgold Resources Corporation A European Gold Explorer
Central Nevada Lithium Brine Projects
……. Date. Disclaimer… Randgold reports its mineral resources and mineral reserves in accordance with the JORC 2012 code. As such numbers.
PicIORUL ZIMBRULUI & MAGURA NEGRA
Manaila Polymetallic Mine
Bidjovagge Mine Project
Presentation transcript:

Bokan Dotson Ridge Heavy Rare Earths

This presentation may contain forward-looking statements including, but not limited to, comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, in-situ valuations, mining costs, potential mineral recovery processes, and other related matters. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. The Ucore Rare Metals Inc properties are at an early stage. More work is required before the mineralization and the Projects’ economic aspects can be confidently modeled. Actual results may differ materially from those currently anticipated in this presentation. No representation or prediction is intended as to the results of future work, nor can there be any promise that the estimates and projections herein will be sustained in future work or that the Projects will otherwise prove to be economic. Cautionary Notes and Disclaimers 2

Short-term (Present~2015) Criticality Matrix

ucore.com Bokan Prince of Wales IslandMoira Sound Ketchikan Location

Timeline 2012

% TREO Cut-off TonnesTREO HREO/ TREO Contained TREO (lbs) 0.8%1,021, %36.80%23,718, %1,549, %37.70%32,467, %2,489, %39.60%45,751, %3,669, %38.60%60,325, %5,276, %40.00%76,049, %6,126, %40.80%82,765, %6,702, %41.30%85,673,000 Resource PEA Base Case

Orebody & Mine Design

ucore.com Geology/Mineralization

Timeline 2012 Camp 1,500 tonne per day underground mine Trackless equipment underground Emphasis will be on local hire and training 190 employees

Timeline 2012

Unique Technology Utilizing ore sorting and mag. separation -Sorting rejects approx. 50% of mill feed as waste -Magnetic separators reject approx. 50% of feed -1,500 tpd mine but 375 tpd leach and separation circuit RESULT IS ALL TAILINGS WILL GO U/G AS BACKFILL Nitric Acid Leach Solid Phase Extraction (SPE) - Process invented by Intellimet together with Ucore - SPE columns separate individual rare earths

Ore Sorter

Solid Phase Extraction New nano technology First stage separates nuisance materials such as thorium, uranium and iron. U/G with paste backfill. Subsequent series of columns separates individual rare earths and then precipitated as oxides. Separation occurs very quickly so columns are very small. Therefore has low capital cost.

ucore.com Conceptual Project Design

Timeline 2012 PEA Permitting Process Starts 2012 Complete Feasibility Study Commence 1.5 year construction program (Upon Receipt of Permits)

PEA Results Preproduction capital - $221 m incl. $25 m contingency and includes the REO separation plant IRR - 43% NPV - $577 m at 10% discount rate, pre-tax Payback period – 2.3 years 11 year mine life Produce 2,250 tonnes REOs including 95 tonnnes Dy₂O₃, 14 tonnes Tb₂O₃ and 515 tonnnes Y₂O₃

Ucore Production

Community/Gov’t Relations Alaska Natives : training, road bill State: enacted resolution, AIDEA Dept. of Defense Federal: POW road bill, meetings with and offers of support from Senators

Whats Coming New resource – 2ⁿᵈ quarter Award Feasibility Study – 2ⁿᵈ quarter Secure off-take agreements Award pilot plant contract – 2 nd quarter

What Have We Got? Deposit with a high percentage of HREOs Project with very robust economics Very small footprint and no tailings on surface at closure New technology results in production of individual REOs Great government support; Federal, State, Local and Alaska Native

TSX-V:UCU | OTCQX:UURAF