EVALUATION OF METHODS AND MODELS USED TO PREDICT WATER QUALITY AT HARDROCK MINE SITES: SOURCES OF UNCERTAINTY AND RECOMMENDATIONS FOR IMPROVEMENT Ann Maest,

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Welcome to the Life Cycle Assessment (LCA) Learning Module Series
Near Surface Disposal Facilities
1 Best Practices for Risk-Informed Remedy Selection, Closure, and Post-closure Control for DOE’s Contaminated Sites October 30, 2013.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
Evaluating Shadow Flicker in the Current Regulatory Environment Massachusetts Wind Working Group Meeting: October 30, 2013 Richard Lampeter, INCE Senior.
Environmental Accounting. Discussion Environmental Accounting Overview –What is environmental accounting –Why do environmental accounting –What is an.
Hydrogeology, High Lake Rob Dickin Hydrogeologist, GLL.
Copyright © 2005 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Own Use Gas Review of Pre-heater.
SCR-15 Coal Slurry Underground Injection. SCR-15 “That the Department of Environmental Protection and the Bureau for Public Health shall jointly design.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
EPAs Proposed Ground Water Protection Standards 40 CFR 192 an Industry Perspective Peter Luthiger Mesteña Uranium LLC.
Life Cycle Assessment (LCA)
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
WATER QUALITY PREDICTIONS AT HARDROCK MINE SITES: METHODS, MODELS, AND CASE STUDY COMPARISON James Kuipers, Kuipers & Assoc Ann Maest, Buka Environmental.
The Research Process. Purposes of Research  Exploration gaining some familiarity with a topic, discovering some of its main dimensions, and possibly.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Strengths 1.Describes clearly the intrinsic value of the Delta and its economy and documents the many public-good services provided by the Delta 2.Provides.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
Critical parameters, frequency, cost-efficiency: implementation of Annex II Heijo Scharff FEAD Workshop Implementation of the Landfill Directive Budapest,
Landfill Processes. Objectives  Describe the physical, chemical, and biological processes occurring in a landfill  Describe leachate quality (Table.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Safety Assessment Methodologies and Implementation of Monitoring and Control Programmes Dr. Japie van Blerk AquiSim Consulting (Pty) Ltd Wednesday, 24.
Systems Analysis – Analyzing Requirements.  Analyzing requirement stage identifies user information needs and new systems requirements  IS dev team.
Reporting & Ethical Standards EPSY 5245 Michael C. Rodriguez.
Managing Environmental Data for Conceptual Site Models Dr. David W. Rich Indianapolis, IN February 26, :45 – 3:30.
1 NRCan’s Final Hearing Presentation: Kiggavik Uranium Mine Project : Prepared for the Nunavut Impact Review Board Presented by: John Clarke Director,
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
DRR workshop WMO Commission for Hydrology Geneva June 2013 Ann Calver 1.
Tailings and Waste Rock Management Alternatives Study
Crossing Methodological Borders to Develop and Implement an Approach for Determining the Value of Energy Efficiency R&D Programs Presented at the American.
2010 Long-Term Surveillance and Maintenance Conference Institutional Controls Featuring the Pinellas Site Jack Craig U.S. Department of Energy Office of.
RESPONSIBLE CARE ® POLLUTION PREVENTION CODE David Sandidge Director, Responsible Care American Chemistry Council June 2010.
April 2012 Improving Remediation Planning through Effective Mine Material Delineation Formosa Mine Superfund Site, Douglas County, OR Mark Nelson PG Nicholas.
Fairbanks Areawide Industrial Reclamation Project ADEC AREAWIDE MANAGEMENT GOALS Janice Wiegers ADEC.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
1 The Use of Institutional Controls Under the RCRA Corrective Action Program.
ME551/GEO551 Introduction to Geology of Industrial Minerals Spring 2005 SAMPLING.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Carousel Tract Environmental Remediation Project Update by Expert Panel to Regional Board July 11, 2013.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
Tier III Implementation. Define the Problem  In general - Identify initial concern General description of problem Prioritize and select target behavior.
1 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Budgetary and Cost.
SEA in the Czech Republic Prague, 24 September 2008.
Conceptual Site Models Purpose, Development, Content and Application CP Annual Training October 27, 2015.
Our Case Study. Rationale for study The TMDL model assumes that there is no decrease in seepage during low flow conditions, basing its calculations on.
WMAN Conference 2005 COMPARISON OF PREDICTED AND ACTUAL WATER QUALITY In Environmental Impact Statements for major hardrock mines in the U.S. James Kuipers,
An Overview of the Objectives, Approach, and Components of ComET™ Mr. Paul Price The LifeLine Group All slides and material Copyright protected.
Preliminary Scoping Effort. Presentation Objectives Identify need for additional sources of future funding Provide background on how elements were identified.
Life Cycle Assessment JISHNU M Assistant professor Mechanical engineering College of engineering chengannur.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Ukraine Petro Nakhaba All-Ukrainian Public Organization “ Chysta Khvylya ” Deputy Head Kyiv, Ukraine Contaminated Sites Management Joint UMOE-DEPA Project.
1 Modeling Complex Systems – How Much Detail is Appropriate? David W. Esh US Nuclear Regulatory Commission 2007 GoldSim User Conference, October 23-25,
CORRELATION BETWEEN HYDROLOGICAL, GEOCHEMICAL AND MICROBIOLOGICAL PROCESSES IN GROUNDWATER-STREAM WATER MIXING ZONE Heejung Kim, Seong-Sun Lee, Yunjung.
Results of the Review of MSW Landfill Regulations from Selected States and Countries Landfill Facility Compliance Study presented to California Integrated.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Part Two.
Mark L. Brusseau University of Arizona
A Look Back at Groundwater Geochemistry as an Exploration Tool for Lead and Zinc Deposits in Sinking Valley 82 Field Conference of Pennsylvania Geologists.
General presentation of SMART GROUND project
Managing Environmental Data for Conceptual Site Models
Pathway Risk Analysis: NAPPO RSPM 31 (2012)
Objectives Provide an overview of the triad approach and its application Describe the elements of the triad approach for practical application Describe.
Environmental Accounting
Research Design and Methods
Presentation transcript:

EVALUATION OF METHODS AND MODELS USED TO PREDICT WATER QUALITY AT HARDROCK MINE SITES: SOURCES OF UNCERTAINTY AND RECOMMENDATIONS FOR IMPROVEMENT Ann Maest, James Kuipers, Connie Travers, and David Atkins Buka Environmental; Kuipers and Associates; Stratus Consulting, Inc. WMAN Conference, Worley, ID October 1, 2005

Why Characterize and Predict? Regulators use characterization and modeling information to determine if a mine will be protective of water resources during and after mining Regulators use characterization and modeling information to determine if a mine will be protective of water resources during and after mining Will mine generate acid and contaminants? Will mine generate acid and contaminants? Future environmental liability – set bonds Future environmental liability – set bonds Cost of remediating mine sites on the National Priorities List (NPL) ~$20 billion Cost of remediating mine sites on the National Priorities List (NPL) ~$20 billion Recent increases in the prices of precious and base metals have triggered increase in new mines around the world Recent increases in the prices of precious and base metals have triggered increase in new mines around the world ~170 large hardrock mines in US in various stages of permitting, operation, closure ~170 large hardrock mines in US in various stages of permitting, operation, closure

This Study Lays out framework for evaluating methods and models used to predict water quality at hardrock mine sites Lays out framework for evaluating methods and models used to predict water quality at hardrock mine sites Makes recommendations for improvement Makes recommendations for improvement Intended audience: regulators, citizens, mine operators and managers Intended audience: regulators, citizens, mine operators and managers

Nature of Predictions Forward modeling Forward modeling Timeframe of impacts Timeframe of impacts Uncertainties Uncertainties Regulatory authorities require predictions Regulatory authorities require predictions

Study Approach Synthesize existing reviews Synthesize existing reviews Develop “toolboxes” Develop “toolboxes” Evaluate methods and models Evaluate methods and models Recommendations for improvement Recommendations for improvement Outside peer review (Logsdon, Nordstrom, Lapakko) Outside peer review (Logsdon, Nordstrom, Lapakko) Case studies – NEPA/EIS Study Case studies – NEPA/EIS Study

Characterization Methods Method description Method description Method reference Method reference Use in water quality predictions Use in water quality predictions Advantages Advantages Limitations Limitations Characterization during different phases of mining Characterization during different phases of mining

Sources of Uncertainty - General Extent/representativeness of environmental sampling Extent/representativeness of environmental sampling need more environmental sampling; let geologic/mineralogic variability dictate extent of sampling; define geochemical test units need more environmental sampling; let geologic/mineralogic variability dictate extent of sampling; define geochemical test units

Mass of Each Separate Rock Type (tonnes) Minimum Number of Samples <10,0003 <100,0008 <1,000, ,000,00080 Recommended Minimum # Samples

Sources of Uncertainty – Static Effect of mineralogy on NP and APP Effect of mineralogy on NP and APP Rely on mineralogy more than on operationally defined lab tests Rely on mineralogy more than on operationally defined lab tests Interpretation of static testing results Interpretation of static testing results only use as initial screening technique to estimate total amount of AGP/ANP only use as initial screening technique to estimate total amount of AGP/ANP

Sources of Uncertainty – Leach Tests Water:rock ratio Water:rock ratio never known definitively; 20:1 too dilute never known definitively; 20:1 too dilute Use of unweathered materials Use of unweathered materials must start with weathered materials must start with weathered materials Interpretation of results Interpretation of results may have limited use as scoping tool if use weathered rock and evaluate applicability of results may have limited use as scoping tool if use weathered rock and evaluate applicability of results

Sources of Uncertainty - Kinetic Particle size Particle size minimize amount of size reduction for samples – field/lab discrepancies minimize amount of size reduction for samples – field/lab discrepancies Length of tests Length of tests 20 weeks is too short for kinetic tests, unless shown to be AG before then. NP≥APP. 20 weeks is too short for kinetic tests, unless shown to be AG before then. NP≥APP. Interpretation of results Interpretation of results analyze effluent for all COCs; use for short- and long-term AGP/leaching potential analyze effluent for all COCs; use for short- and long-term AGP/leaching potential

Length of Kinetic Tests Source: Nicholson and Rinker, 2000 (ICARD).

Modeling Toolbox Category/subcategory of code Category/subcategory of code Hydrogeologic, geochemical, unit-specific Hydrogeologic, geochemical, unit-specific Available codes Available codes Special characteristics of codes Special characteristics of codes Inputs required Inputs required Modeled processes/outputs Modeled processes/outputs Step-by-step procedures for modeling water quality at mine facilities Step-by-step procedures for modeling water quality at mine facilities

Modeling Opportunities

Sources

Pathways

Processes

Sources of Uncertainty - Modeling Conceptual model Conceptual model Conceptual models are not unique and can change over time Conceptual models are not unique and can change over time Revisit conceptual models and modify mining plans and predictive models based on new site-specific information Revisit conceptual models and modify mining plans and predictive models based on new site-specific information Use of proprietary codes Use of proprietary codes need testable, transparent models – difficult to evaluate, should be avoided. Need efforts to expand publicly available pit lake models (chemistry). need testable, transparent models – difficult to evaluate, should be avoided. Need efforts to expand publicly available pit lake models (chemistry). Modeling inputs Modeling inputs large variability in hydrologic parameters; seasonal variability in flow and chemistry; sensitivity analyses (ranges) rather than averages/medians large variability in hydrologic parameters; seasonal variability in flow and chemistry; sensitivity analyses (ranges) rather than averages/medians Estimation of uncertainty Estimation of uncertainty Acknowledge and evaluate effect on model outputs; test multiple conceptual models Acknowledge and evaluate effect on model outputs; test multiple conceptual models “…there is considerable uncertainty associated with long-term predictions of potential impacts to groundwater quality from infiltration through waste rock...for these reasons, predictions should be viewed as indicators of long-term trends rather than absolute values.” “…there is considerable uncertainty associated with long-term predictions of potential impacts to groundwater quality from infiltration through waste rock...for these reasons, predictions should be viewed as indicators of long-term trends rather than absolute values.”

Summary Characterization methods need major re- evaluation, especially static and short-term leach tests Characterization methods need major re- evaluation, especially static and short-term leach tests Increased use of mineralogy in characterization – make less expensive, easier to use/interpret Increased use of mineralogy in characterization – make less expensive, easier to use/interpret Modeling uncertainty needs to be stated and defined Modeling uncertainty needs to be stated and defined Limits to reliability of modeling – use ranges rather than absolute values Limits to reliability of modeling – use ranges rather than absolute values Increased efforts on long-term studies and collection of site-specific data over modeling Increased efforts on long-term studies and collection of site-specific data over modeling

Conclusion Predictive modeling is an evolving science with inherent uncertainties Predictive modeling is an evolving science with inherent uncertainties Using the approaches described in this report, predictive water quality modeling and site characterization information can be reliably used to design protective mitigation measures and to estimate the costs of future remediation of hardrock mine sites. Using the approaches described in this report, predictive water quality modeling and site characterization information can be reliably used to design protective mitigation measures and to estimate the costs of future remediation of hardrock mine sites.