DEPARTMENT OF MINES AND ENERGY Image positional only placement optional Washout feature in PPP 70/30 Daly River Management Advisory Committee - Katherine.

Slides:



Advertisements
Similar presentations
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
Advertisements

TVI Resource Development (Phils), Inc. September Canatuan Tailings Management Completion of Stage 1 Tailings Management Facilties Gossan Dam and.
By: Frank Filas, P.E. Environmental Manager Energy Fuels Resources Corporation 44 Union Blvd., Suite 600 Lakewood, Colorado Uranium Development in.
Huntly Flood Alleviation Scheme
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Norwalk, Connecticut: A Public-Private Partnership Case Study Mayor Alex Knopp U.S. Conference of Mayors Urban Water Council October 2004.
Redevelopment of Former Industrial Lands in the Australian Capital Territory Toby Hobbs Coffey Geosciences, Australia NATO/CCMS Pilot Study June
Antamina Mine Water Management Model Alan Keizur Golder Associates Roberto Manrique Arce Compañia Minera Antamina User Conference 2006 Background The Antamina.
SPTC – JPA RAIL/TRAIL CORRIDOR Presented by John Segerdell, CEO Sacramento-Placerville Transportation Corridor Joint Powers Authority (SPTC-JPA)
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Geological Issues at the OK Tedi Mine Keith McGregor Sophie Price.
Risk Reduction of Mining Accidents in the Tisa Basin Adriana Eftimie – Director PIU National Agency for Mineral Resources NATO/CCMS Pilot Study “Prevention.
Altynalmas Gold Ltd An Emerging High Margin Eurasian Gold Producer.
* In 2008 discussions between Wattle Range & Robe – improve compliance and maintenance of CWEMS Schemes * Shared Services options explored with the LGA.
TRP Chapter Chapter 4.2 Waste minimisation.
Upper Blackfoot Mining Complex
DEPARTMENT OF PRIMARY INDUSTRY, FISHERIES AND MINES Sustainable development and the challenges of the 21 st century Minerals and Energy Mining – not just.
2004 Budget Presentation City Commission Budget Study Session July 2, 2003.
Department of Natural Resources and Conservation, Water Resources Division State Water Projects Bureau Kevin B. Smith, P.E., Chief
SPACE ADMINISTRATION IN HIGHER EDUCATION INSTITUTIONS – BARRIERS AND OPPORTUNITIES Jean Skene Director: HEMIS Department of Higher Education and Training.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
1 © 2011 ARCADIS 14 September 2015 Fresh Water Supply Alternatives and Technologies Fresh Water Supply Alternatives and Technologies Community Advisory.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Water Management Planning An essential component of the MMP
UMREG Balanced Resources Management UMREG2012 Meeting, IAEA, Vienna, November 7, 2012 Remediation of the Tuyuk Suu Tailings Pond “Appraisal of the Minkush.
Tailings and Waste Rock Management Alternatives Study
Information Sharing and Riparian Discussions Almaty, Kazakhstan May 17-19, Assessment Studies for the Proposed Rogun Hydropower and Regional Reservoir.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
14/10/2015European Agency for Reconstruction1 Water & environment.
FUND MANAGEMENT Jose Melvin Lamanilao. OUTLINE Environmental Fees Social Funds Indigenous Peoples Trust Fund.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
1 Presentation to the Parliamentary Portfolio Committee on Water and Environmental Affairs Eastern Basin 28 June 2011.
Applicant: eThekwini Transport Authority Environmental Consultants Engineers Pravin Amar Development Planners Iliso Consulting.
1 2009/10 DIVISION OF REVENUE BILL Presentation to Select Committee on Finance 24 February 2009.
1 Date: 21/22 June 2011 Presentation to Parliamentary Portfolio Committee on Water Affairs.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
RBY Projects Overview RBY Projects (‘RBY’) is the largest 100% Indigenous owned and managed company in the resource sector in Queensland, striving to.
Northern Projects Management Office in Nunavut Nunavut Mining Symposium April 2012.
Providing Safe Waterfowl Feeding Habitat in Toxic Floodplains
1 CONCISE UPDATE ON ACID MINE DRAINAGE IN THE WITWATERSRAND April 2012 UPDATE BY Mr. MARIUS KEET.
1 Department of Correctional Services Vote 19 CURRENT STATE OF EXPENDITURE: 2001/2002.
PORT OF TACOMA. Request authorization to award Professional Services Agreement (PSA) No with Geomatrix; and PSA No with Hart Crowser for.
NAHB St Josephs 30/09/021 Progress Report St Josephs Hospital Raheny Presentation to Board Members 30 th September 2002 Northern Area Health Board Laverne.
Planning Commission Meeting July 30, Presentation Outline  Project Purpose, Background and Schedule  Overview of Community Input  Overview of.
Council Improvement Plan Council Meeting 1 June
0 Sustainability – Net Positive Environmental and Social Gains from Mining Reuben Mills, Director Health Safety & Environment October.
TRANS-SIBERIAN GOLD PLC 30 June 2016 Annual General Meeting TRANS-SIBERIAN GOLD.
The engagement of health in an SEA SEA & health in Plymouth Andrew Pratt (Health & Equity Impact Assessment Specialist Practitioner, Plymouth PCT)
TRANS-SIBERIAN GOLD PLC Annual General Meeting
Uniper Energy Services
Context for Gold King Spill
Yukon Conservation Society/LightHawk Organization Faro Mine Flight September 14, 2017 Gerry Whitley pilot Flight path was over the mine and the length.
Florida Gulf Coast Marine Fisheries Enhancement Center
PORTFOLIO COMMITTEE MEETING 14 FEBRUARY 2017 Financial Provisioning Regulations Environmental Advisory Services.
Environmental Management
Future Construction FasTracks Corridors Federal Funding Analysis
Historical Mining and Water Quality in the Upper Animas Basin
Indian and Northern Affairs Canada
Radioactive waste management - status
Controlling Project Cost and Schedule
Mount Vernon Community School
Brackish Water Desalination Project
Delta Water Supply Project
Water & Environmental Affairs
Nikisi Lesufi Senior Executive Chamber of Mines
Information & Market Engagement
Presentation transcript:

DEPARTMENT OF MINES AND ENERGY Image positional only placement optional Washout feature in PPP 70/30 Daly River Management Advisory Committee - Katherine - 19 th September 2012 Mount Todd Department of Mines & Energy Management Activities

DEPARTMENT OF MINES AND ENERGY NT Government Commitment Continuous engagement and involvement of stakeholders through the Mount Todd Mine Site Rehabilitation Reference Group. Maintenance of the environmental operations of the site between 2000 and 2005, including substantial expenditure on site works and installation of critical infrastructure to manage the inventory of poor quality water on site. Brokering of the Agreement with the current operator, Vista Gold, to ensure an on- site presence for environmental management. Negotiation of the extension/ renewal of the existing Agreement with Vista Gold to support the work undertaken by the operator to further define the resource. Provision of significant funding for investigations to determine management and remediation options and to undertake works on site.

DEPARTMENT OF MINES AND ENERGY Brief Site History The site’s history can be broken into 3 distinct phases: Exploration & Mining (1986 to 2000); Northern Territory Government management (2000 to current); and Northern Territory Government Agreement with Vista Gold period (2006 to current).

DEPARTMENT OF MINES AND ENERGY Exploration & Mining (1986 to 2000) Exploration activities from 1988 to 1992 Phase 1 Heap Leach commissioned in late 1993 Phase 2 upgrade to milling and CIP circuit completed in late 1996 Pegasus placed the operation in Care & Maintenance 11/97 General Gold Operations (Multiplex) recommenced mining July th July 2000 General Gold appoints an administrator

DEPARTMENT OF MINES AND ENERGY NTG Management 2001 to 2006 Aerial view

DEPARTMENT OF MINES AND ENERGY NTG Management 2001 to 2006 Installed and operated pipelines and pumping equipment Maintained staff on site to manage water issues and carry out repairs and maintenance Weeds & fire management Approximately $5 million in direct costs In excess of $2.0 million in indirect costs (wages, vehicles, consumables, consultants studies etc) April 2005 set up the Mt Todd Mine Site Rehabilitation Reference Group

DEPARTMENT OF MINES AND ENERGY NTG / Vista Gold Agreement 5 years + 5 years + 2 years Agreement renewed for the second 5 year period in early 2011 after Vista presented its Preliminary Feasibility Study The agreement indemnifies Vista Gold against liability for pre-existing environmental conditions until they have an approved mining operation. NTG retails liability until then. Vista Gold became the authorised operator of the site under the Mining Management Act and has all of the responsibilities for the day to day operation of the site including managing environmental impacts. There has been a good level of co-operation between the NTG and Vista in managing the site to minimise off site impacts.

DEPARTMENT OF MINES AND ENERGY NTG Management 2006 to present

DEPARTMENT OF MINES AND ENERGY NTG Management 2006 to present 2006 to 2010 : Installed and operated gauging stations with telemetry Installed siphons at RP1 to manage releases Co-funded water treatment facility with Vista Gold Commissioned a range of consultancies to produce information to feed into a remediation plan Ongoing monitoring of water quality by DME’s Environmental Monitoring Unit Estimated to be approximately $1 million in direct costs and a further $1 million in indirect costs.

DEPARTMENT OF MINES AND ENERGY NTG Management 2006 to present Constructed diversion drains for the tailings dam and RP1 Reshaped the Waste Rock Dump to reduce infiltration Ongoing small scale water treatment (NTG/Vista partnership) Raising of the RP1 embankment and spillway Construction of a water balance model Design of an embankment raise for Batman Pit as a contingency Estimated to be approximately $2 million in direct costs and a further $0.5 million in indirect costs to present:

DEPARTMENT OF MINES AND ENERGY Diversion Drains Diverts 56 ha which is approximately 20% of the Tailings Dam’s catchment

DEPARTMENT OF MINES AND ENERGY Diversion Drains

DEPARTMENT OF MINES AND ENERGY Waste Rock Dump Reshaping

DEPARTMENT OF MINES AND ENERGY RP1 Embankment Raise Main embankment raised by 1.5 metres Spillway raised a corresponding amount Additional small embankment constructed on western side Purpose to allow more time for pumping to get on top of large events and prevent uncontrolled discharges, not as long-term water storage

DEPARTMENT OF MINES AND ENERGY Water Balance Model Allows DME to independently review information and run various scenarios

DEPARTMENT OF MINES AND ENERGY Batman Pit Embankment Raise Design

DEPARTMENT OF MINES AND ENERGY Boxing Day 2011 Event

DEPARTMENT OF MINES AND ENERGY Boxing Day 2011 Event 27 th Dec th Dec 2011