Room Data Sheets – The Concept © Steve Foott 2004.

Slides:



Advertisements
Similar presentations
RESIDENTIAL PROJECT JOY ADINATH - 1. Presenting J OY A DINATH - 1 Bhandup.
Advertisements

Changing Your Fixture? What to consider….. There are lighting types and options to suit just about everyones tastes and every location that you can imagine.
ROOM DATA SHEETS For Medical Projects using the data available from the NHS Activity Database (ADB) © Workface Solutions 2004.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
DOE-2 Overview and Basic Concepts. Background  US public domain programs from 1970s Post Office program; NECAP (NASA energy- cost analysis program);
©2015 Mark Hamberg. All rights reserved.. A Town House In The Country Located in the picturesque village of Phinikaria, only fifteen minute’s drive.
1 The three to five year plan Facilities Management Gary Stanley, Aptakisic Tripp School District 102 Richard Cozzi, ARCON Associates.
MMeet with town to discuss expectations and pre- schedule inspections. Have Permits in hand MMeet with landlord to discuss dumpster & storage locations.
Web Concept The idea I used for my shop was based on the formation of a spider’s web, and the dew drops that form on it in the early morning. I decided.
Open Range Software Hazardous Material Management.
Landon Roberts Lighting/Electrical Option 11/01/07 Medical Education Building Johns Hopkins University School of Medicine Electrical Systems Existing Conditions.
BIMteriors: Autodesk® Revit® Architecture for Commercial Interior Design John R. Ade, AIA Senior Applications Specialist Applied Software.
Tel : Fax: P.O.Box : Dubai, UAE.
Chapter 19 Electrical Plans.
Project Perfect Pty Ltd Project Administrator Overview of Software.
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
Slides on Drawing Lecture-1
Technical boclair academy Building Drawings.
CONSTRUCTION BLUEPRINT READING
3 interior planning + design conference room
Introducing Our Prescription for your Success….
MODULE ONE BASIC BLUEPRINT READING PRINCIPLES
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
Guinn Hall Project, Summer 2014 Scope of Project Painting Flooring Tub surrounds Tile in bathrooms Electrical upgrades Light fixtures New doors Ceilings.
Rebecca McCready Faculty of Medical Sciences Newcastle University Lecture 3 – Queries and Reports.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Preprocessing for Data Mining Vikram Pudi IIIT Hyderabad.
Chapter 22 Lighting Design Process: Design Phases 1.
© 2012 Autodesk Autodesk® Revit® MEP Templates: Increasing Productivity Plamen Hristov Director of Design Technology Capital Engineering Consultants, Inc.
INTD 51 human environments applying lighting techniques.
Luminaire Types.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Lobby 2190 sf Core 530 sf Rest 2190 sf Main Floor: Option 1 Key Separate.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Betterment Adam Pugh 2015 FIMS & RE Annual Training May,
Watch University Grow March 2008 Construction continues on University Hospital’s new Cardiovascular Center, a four-story, 199,000-square- foot facility.
Facilities for a Quality Child Development Program Child Services II.
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 1 Towards Ecal Assembly Julien Bonis
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Residential Construction Drawings
Lighting facts.  Lighting can be a big energy consumer in offices and production areas and experience shows that energy savings may be achieved - often.
Chapter 6 Designing Recreation Facilities and Reading Blueprints.
+ The Future of the Community Centre. + What we did Test the feasibility of running the Centre without the County Council Building survey Consultation.
LED Downlights are a preferred choice of light fixture for false ceiling lighting. LED Downlights in Singapore is quite common, especially in new BTO houses.
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
Town of Mountain Village Lighting Projects. ICAST Mission To provide economic, environmental, and social benefits to communities in a way that builds.
Loft Conversions Bringing you the latest in sprayfoam insulation technology.
Blanco & ETS ACTR, 15 March Blanco Glycol cooling system upgrade – Enrique Figueroa report – ACTR DocDB #266 – “A quotation for a 40ton unit has.
Final half of the semester Putting theory into practice 1.
LED Downlights are a preferred choice of light fixture for false ceiling lighting. LED Downlights in Singapore is quite common, especially in new BTO houses.
“kicking on to the finish”
Construction Documents

Objective 6.05: Types of Architectural Drawings
Construction (Design and Management) Regulations (CDM) 2015
Introduction to Production & Operations Management
CAPE & OUR PPN HISTORY IN BUSINESS SINCE 1953, PPN MEMBER SINCE 2014
Objective 6.05: Types of Architectural Drawings
Vice President, Facilities & Capital Projects
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
ISA Prime Developments
عناصر التنمية السياحية
INTD 405 Modern Practices in Interior Design PLANS
Chapter 19 Electrical Plans.
Value of contract: Length of contract: Contract start date:
Widmerpool House, Kinoulton Road, Widmerpool
KOMPLEX Investors Report – Q
Sheet Lead Shielding from Medi-Ray
Objective 6.05: Types of Architectural Drawings
Presentation transcript:

Room Data Sheets – The Concept © Steve Foott 2004

Project Information Most Projects have a list of the approved finishes that can be applied. Most Projects have a list of approved fittings and fixtures that can be used. Most Projects can be split up into rooms or specifically defined areas. Some Projects have specific environmental or usage requirements. Continue……..

Project Information (continued) All this Project information can be combined into a simple database to produce a set of data sheets that detail exactly what finishes fittings and fixtures belong to any room within the project. Continue……..

ETC SKIRTING CEILING FINISH WALL FINISH FLOOR FINISH LIST OF FINISHES LIGHTING SANITARYWARE HEATING ELECTRICAL LIST OF FITTINGS MORNING ROOM CLOAKROAM RECEPTION HALL ENTRANCE HALL SCHEDULE OF ACCOMMODATION Report Options Allocation by Room of Fittings and Finishes Fittings Usage For each fitting, the total number required and which rooms they are used in. Room Data Sheet For each room a complete specification of finishes fittings and if required environmental requirements Finishes Schedules Sorted by each finish showing which rooms use it Continue…….. Room Data Sheet Application – The Process

Room Data Sheets are a way of bringing together the specification of each and every room, its fittings and its finishes in a format that is readily understood by everyone. Continue……..

Room Data Sheets can be used to effectively combine the information normally contained in many schedules into a unified reporting system that allows single source access to all relevant information. Continue……..

Room Data Sheets form the perfect platform for Facilities Management Operations where phased replacement and maintenance is required. Continue……..

Continue…….. Example Room Data Sheet

Example Finishes Report Continue……..

Example Fittings Usage Report Continue……..

Room Data Sheets can be tailored to suit all sizes of Projects from the largest industrial or commercial buildings to individual quality conversions where the existing features need identifying for preservation and local notes need to be applied to specific items within rooms.