® (With apologies to George Lucas) City of Boulder.

Slides:



Advertisements
Similar presentations
JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Advertisements

Newcastle Water Pollution Control Plant
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to American #2 Wastewater Treatment Plant.
Wastewater Treatment.
Virtual Tour of Municipal Wastewater Treatment Plant (WWTP) Prepared by Dr. Richard O. Mines, Jr., P.E. Mercer University Environmental Engineering Department.
An-Najah National University Civil Engineering Department
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
An Energy Producing Resource Recovery Plant Concept © Copyright 2011, All Rights Reserved, Filtration Dynamics, Inc. Energy from Wastewater.
Wastewater Treatment. Municipal WW Management Systems Sources of Wastewater Processing at the Source Wastewater Collection Transmission and Pumping Treatment.
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
INTRODUCTION TO THE TREATMENT OF TANNERY EFFLUENTS
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
CTC 450 Review Secondary Treatment Trickling Filters Biological Towers
Presentation Overview
What can QCI do for you? Shawn Stevenson Don Weirens.
NC AWWA-WEA 93rd Annual Conference November 12, 2013 Tim Woody Resource Recovery Division Director, City of Raleigh Jonathan Treadway P.E, BCEE, CDM Smith.
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Processes of Sludge Treatment
Biosolids Treatment and Disposal
Domestic Waste Water Treatment
THE WONDERFUL WORLD OF WASTEWATER TREATMENT PLANTS TODAY’S FLUSH IS TOMORROW’S DRINK!
Wastewater Treatment Plant Overview Adapted from May 2009 presentation UIUC Researchers: Poust, Somers, Poole.
Wastewater Treatment. Municipal WW Management Systems Sources of Wastewater Processing at the Source Wastewater Collection Transmission and Pumping.
WASTEWATER TREATMENT IN LAHTI There are 2 wastewater treatment plants in Lahti - Kariniemi - Ali-Juhakkala In these slides we examine waste water treatment.
By Shantanu Mane Vaidehi Dharkar Viral Shah
Moving Bed Biofilm Reactor Retrofit for Ammonia and Nitrate Removal
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Co-Generation: Today’s Reality Larry McFall Plant Operations Manager Rock River Water Reclamation District Rockford, IL
Wastewater Treatment Processes
Water Treatment Chapter 11. Sewage Treatment Rationale More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement.
Environmental Engineering (Wastewater treatment) Core Course Laboratory of Environmental Engineering & Planning Department of Civil Engineering Aristotle.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
1 Wastewater Treatment Processes Jae K. Park, Professor University of Wisconsin-Madison.
Study of the U.S. Institute for the Environment Introduction to Water and Wastewater and Treatment Tuesday July 14, 2009.
Welcome To ENV-103 Presentation Wastewater Treatment System On.
Village of Morton Wastewater Treatment. The Village of Morton Wastewater Treatment Department duties Operate and maintain 2 treatment plants (Biosolids.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Dr. Mohab Kamal. CE 445 Water Reclamation and Reuse (Dr. Mohab Kamal) 2.
Welcome to American-Bath Wastewater Treatment Plant.
Why Class A does not always make cents: Cost model to drive biosolids planning decisions Thor A. Young | Service Line Leader Sebastian E. Smoot | Engineer.
Conventional Sewage Treatment Plants:
CTC 450 Review WW Sludge Processes.
Chapter 7 - Fundamentals of Biological Treatment
Lecture (8): liquid wastes treatment (primary, vital, advanced).
PRESENTATION ON AUTOMATION,PLC AND SCADA
Wastewater Treatment.
Wastewater Treatment.
Wastewater Treatment Dr.Gulve R.M..
Wastewater Treatment.
CTC 450 Review Secondary Treatment Trickling Filters Biological Towers
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Methods for Wastewater and Sludge Treatment
Septage Management Options
Wastewater Treatment.
Pure water from RO system Reuse to manufacturing
A Tale of Two Plants: How Combining WWTP and WTP Improvements in Reidsville is Setting the Stage for the Future Kevin Irby, P.E. Kevin Eason, P.E
SBSA.
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Wastewater Treatment.
Wastewater Treatment.
Capital Improvement Plan April 9, 2018 Status Update
The Project Overview and Status Report
Presentation transcript:

® (With apologies to George Lucas) City of Boulder

CITY OF BOULDER Utilizing Instrumentation Technology and SCADA to Improve Solids Flow at the Presented By: Leigh Rickert, Maintenance Supervisor Scott Kennedy, Inst./Control Technician

Liquid Stream Flow Headworks Trickling Filters Solids Contact Secondary Clarification Primary Clarification CL2 & Liquid Stream Effluent 17.5 MGD Average NTF Tower (20% of Flow)

Primary Clarification Secondary Clarification Gravity Thickeners Anaerobic Digester Complex Solids Stream Flow 5 Dry Ton Per Day

Solids Stream Flow Anaerobic Digester Complex Co-Generation Two 1.25 MG Digesters Solids Processing by Centrifuges Two 0.5 MG Thickened Biosolids Storage Tanks

Semi-Dewatered Biosolids Recycling by Land Application CITY OF BOULDER

Gravity Thickener #2 Doppler Sensor Heads Doppler Flow Meter Gravity Thickener / Primary Pump Station Rotary Lobe Pump

Primary Pump SCADA Monitoring / Control

Date of Sensor Installation CITY OF BOULDER

Gravity Thickener #1 Blanket Level Sensor 4-Channel Controller Transducer Head CITY OF BOULDER

Gravity Thickeners Transfer Pump Station Thickened Transfer Sludge Flow

Transfer Pump SCADA Control Screen

Gravity Thickener SCADA Monitoring

Gravity Thickener Control Screen

Process Control System Hardware GE Fanuc Automation GENIUS I/O System 90/70 PLC, w/Ethernet Comm. CITY OF BOULDER

Process Control System SCADA Software Intellution FIX32 ver. 7.0 HMI/SCADA Developer - Future Plan Calls for Upgrade to iFix (Fix Dynamics) GE Fanuc Automation Cimplicity Machine Edition Ladder Logic Programming Professional Edition, ver.3.0

Questions? Comments? Thanks You! City of Boulder Wastewater Treatment Facility th Street Boulder, CO

Thank you, Steamboat!