P. Paolucci - I.N.F.N. di Napoli 1 30-01-2006 / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Electronics Review Review of cable procurement and installation Davide Piccolo INFN Napoli.
Advertisements

Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
The closed loop system at ISR We moved the system at ISR in January. Preliminary tests has been done in order to verify the possible use in the “ISR conditions”:
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
DCS: Temperature Probes
RPC Barrel HV & LV system Lappeenranta University
T1 Electronic status Conclusions Electronics Cards:
Electronics for RPC Upscope
HV & LV status LV system in W+1 and W+2 is OK
LV Test Napoli feb 05 Noise ripple: EASY - + CRATE LV cable
HV-LV, cabling & services
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
RPC HV&LV systems Introduction Detector description Requirements
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
A. Boiano1, F. Loddo2, P. Paolucci1, D. Piccolo1, A. Ranieri2
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
RPC Detector Control System
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Dr. Pierluigi Paolucci - INFN di Napoli
RPC Detector Control System: towards the final system
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
HV & LV status LV system in W+1 and W+2 is OK
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
CSC Electronics Installation and Commissioning Oct ‘06
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack# A3486 LV336 (11 watt/ch) < 900*1< 9001ch/rack HV (10 watt/ch) < 600**3< 18002ch/rack A3486 AC/DC has 2 channels of 2 KW each * 3 boards with safety factor 2 ** 6 boards with safety factor 2

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY crate back schema

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY crate connection schema ConnectorCostCablecost 48V powerAPP - 75A red/black + pin (14-8 awg) ( mm2) KW2.5 (black) (red) (2 pins) = V serviceAPP - 30A red/black + pin ( awg) (1.5-4 mm2) KW0.52(black) (red) (2 pins) = 1.58 EASY bus50 pins flat cable8.39Flat 50 wires EarthFork 7mm0.10

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting NEW USC55 barrel HV system General Information max HV EASY board: 7 ch. max EASY crate: 42 ch. HV distributor: 32 input ch (2 sectors) 16 output ch. Rack height tot:56 U turbine4 U air defl.2 U Rack available height 50 U Total: 72/96 ch. We need (per wheel/rack) 72 ch  12 HV boards (reduced*) 96 ch  16 HV boards (final) 3 EASY crate (4-4-4) (6-6-4) 3 FAN crates + heat exchange 6 distributors + 1 RB4-sect4 join * RB3 and RB4 joint together ( ) 8U EASY fan tary heat exchange EASY fan tary heat exchange 8U EASY fan tary heat exchange 8U 44 U 36 input ch. 24 input ch. 48 output ch. 36 ch. 24 ch. 12 ch. 24 ch. HV distributor sect HV distributor sect sect output ch. HV distributor sect HV distributor sect sect HV distributor spare turbine 4U air deflector 2U S1H02-06

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting 34U AC/DC 48V power 3U 2x2 KW S1H07 turbine air deflector 2U 4U NEW USC55 HV barrel racks composition SY1527 HV SY1527 LV 8U AC/DC 48V power 3U 2x2 KW AC/DC 48V service 3U 2x2 KW HW numbers 15 EASY crates HV boards A HV channel 30+4 HV distributors 2 SY1527 mainframes 3 or 4 AC/DC 48 V - A3486 (or A3485) CABLE numbers EASY power (direct)5 EASY power (daisy)10 EASY service (direct)2 EASY service (daisy)14 Branch Contr. (direct)2 Branch Contr. (daisy)14 Fan unit contr.15 EASY Ground -15 SY1527 ground HV input HV out AC/DC 48V power 3U 2x2 KW (spare ?) 136 components 800 cables

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV status Setup at 904 is finished. MTCC setup is almost ready Setup ready for Cosmic Challenge in March 06 Move from 904 to SX5 in April 06

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting LV MTCC setup 2 LV EASY crates OK 2 LV boards A3009 (2 sectors) 1 LV board A3009 (1 sector) Short cables and connections are OK Waiting for lengths for long cables. 2 Control cables

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV MTCC setup 1 HV EASY crates OK 4 HV boards A3512 (3 sectors) Short cables and connections are OK Waiting for lengths for long cables. 3 multi-conductors cables

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting RPC DCS status Barrel and Endcap projects are ready Two PCs running the projects are at 904 Integration with CMS DCS is almost ready, some common problems still to fix RPC DCS will be ready for May 2006

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting Next Steps Define the hardware of the endcap system Install the system at SX5 Build and install long cables Test it in April-May to be ready for CC

HW schema for CC BC LV BC LV BC HV RPC - SY1527 HV – EASY – 24 ch. HV AC/DC HV – MAO – 2 ch. Balcony Barack 48 V – service LV Control LV Detector PWR HV Control HV W+2 W+1 LV – EASY – 12 ch. LV LV – MAO – 1 ch. LV – EASY – 24 ch. LV LV – MAO – 1 ch. PWR HV AC/DC phase HV multicond. 10 ch.